CEA DSM IRFU SAp PACS Commissioning phase, Pointing Verification and Performance Verification Phase Planning Review (CPPhot) Koryo Okumura / Marc Sauvage.

Slides:



Advertisements
Similar presentations
The PACS Status Herschel PV Mid-Term Review ESAC, September 1, Herschel Performance Verification Mid-Term Review PACS Status: Overview Markus Nielbock.
Advertisements

Bruno Altieri Jan # 1 Pointing calibration plan Bruno Altieri (HSC) PACS PV phase.
PACS IIDR 01/02 Mar 2001 Instrument Overview1 PACS Instrument Design Description and System Performance A. Poglitsch.
HAWCPol / SuperHAWC Software & Operations J. Dotson July 28, 2007.
Slews: Fast and Slow. Fast Slew Status  XMMSL1: catalogue of slew sources released May 2006 Revs , 5180 detections, 2692 Revs , 5180 detections,
CEA DSM IRFU SAp PACS Commissioning phase, Pointing Verification and Performance Verification Phase Planning Review (PVPhot) Koryo Okumura / Marc Sauvage.
PACS IHDR 12/13 Nov 2003 PACS FPU Optics: Concept and Alignment R. Graue, D. Kampf Kayser-Threde.
PACS SOVT-2 (SIMS) and CAPs development MPIA PACS ICC Meeting #32 1 st – 3 rd April 2009, MPE Garching Markus Nielbock (MPIA)
PACS SVR22/23 June 2006 PACS Thermal Behaviour1 PACS Thermal Behaviour Tests T. Müller, H. Feuchtgruber, A. Contursi, Cs. Kiss, Sz. Csizmadia.
PACS Status Report Herschel ST#38ESAC, 30 Jun 2009 Herschel map making workshop 10 July 2009 B.Altieri/E. Sturm for the PACS Team / HSC Herschel map making.
- page 1 July NHSC Mini-workshop PACS NASA Herschel Science Center PACS Photometer AORs How to Prepare an Observation with HSpot: 2 Science Use.
CEA / PACS SVR phase 2 Photometer results from the first part of the FM ILT CEA - MPE - NHSC.
PACS SVR22/23 June 2006 FM IST1 PACS FM Tests at Integrated Satellite Level H. Feuchtgruber with inputs from the PACS Operations Team: D. Cesarsky, H.
- page 1 NHSC PACS Web Tutorial PACS-401 NHSC/PACS Web Tutorials Running PACS Photometer pipelines PACS-401.
PACS IIDR 01/02 Mar 2001 FPFPU Alignment1 D. Kampf KAYSER-THREDE.
FM-ILT Results of the PACS FM1 Chopper Markus Nielbock Ulrich Klaas Jeroen Bouwman Helmut Dannerbauer Jürgen Schreiber Ulrich Grözinger.
PACS SVR38/9 Nov 2007 Commissioning Phase1 Commissioning Phase H. Feuchtgruber.
SPIRE Consortium Meeting La Palma, Oct. 1 – SPIRE FTS Pipeline Trevor Fulton Blue Sky Spectroscopy, Lethbridge, Canada.
PACS FM-ILT SPECTROMETER SPATIAL CALIBRATION A. Contursi (H. Feuchtgruber) PACS Science Verification Review – 8/9 November 2007 MPE-Garching.
FM-ILT Results: Mechanisms FM1 Chopper and Calibration Sources Markus Nielbock (MPIA) Babar Ali (IPAC) Jeroen Bouwman (MPIA) Helmut Dannerbauer (MPIA)
PACS IIDR 01/02 Mar 2001 On-Board Data Compression1 On-Board Data Compression Concept A. N. Belbachir Vienna University of Technology.
PACS CoP & PV Review21/22 Jan 2009 CoP Plan and Timeline1 CoP Preparation H. Feuchtgruber.
PACS SVR 2 18 Jan 2007 FM ILT: Mechanisms1 FM ILT Results: Mechanisms H. Feuchtgruber, H. Dannerbauer, N. Geis, C. Hartinger, U. Klaas, P. Royer.
PACS SVR 22/23 June 2006 PACS FPU Subunits1 FM FPU Subunits A. Poglitsch.
PACS SOVT-2 and CAPs development MPIA PACS ICC Meeting #31 12 th – 13 th January 2009, Vienna (A) Markus Nielbock (MPIA)
Consortium Meeting La Palma October PV-Phase & Calibration Plans Sarah Leeks 1 SPIRE Consortium Meeting La Palma, Oct. 1 – PV Phase and.
PACS SVR-II 18 January 2007 FM ILT overview1 The PACS FM ILT Phase I overview on actual test execution and analysis Eckhard Sturm MPE.
1 NHSC PACS NHSC/PACS Web Tutorials Running PACS photometer pipelines PACS-202 (for Hipe 8.0) Level 0 to Level 2 processing: From raw data to calibrated.
- page 1 NHSC – DP workshop – Feb – N. Billot PACS PACS Photometer Standard Pipeline Level 0 to Level 1 processing: From raw to calibrated data cubes.
PACS NHSC Data Processing Workshop – Pasadena 10 th - 14 th Sep 2012 SPIRE AOTs, Products and Quick Look Tools Bernhard Schulz NHSC/IPAC on behalf of the.
PACS Spectrometer Spatial Calibration plan in PV phase A.Contursi D. Lutz and U. Klaas.
PACS SVR 22/23 June 2006 Instrument Performance Prediction1 PACS Instrument Model and Performance Prediction A. Poglitsch.
1 NHSC PACS NHSC/PACS Web Tutorials Running PACS photometer pipelines PACS-402 (for Hipe 12.0) Level 1 to Level 2 processing: The JScanam pipeline Prepared.
Optimisation of the PACS Chopper Markus Nielbock Ulrich Klaas Jeroen Bouwman Helmut Dannerbauer Jürgen Schreiber Ulrich Grözinger.
PACS NHSC Data Processing Workshop – Pasadena 10 th - 14 th Sep 2012 The SPIRE Destriper Bernhard Schulz NHSC/IPAC on behalf of the SPIRE ICC 1.
Spectroscopy with PACS M82 PACS line imaging from the SHINING team (Contursi et al First Results workshop talk) Phil Appleton and Dario Fadda for.
PACS SVR 22/23 June 2006 Scientific/Performance Requirements1 PACS Science and Performance Requirements A. Poglitsch.
PACS page 1 NHSC Open Time Cycle 1 Observation Planning Workshop 3 rd - 4 th Jun 2010 – Bernhard Schulz SPIRE Overview Bernhard Schulz, Nanyao Lu, Kevin.
CEA DSM Dapnia SAp Readout mode of the Photometer Koryo Okumura, Marc Sauvage, Nicolas Billot, Bertrand Morin DSM/DAPNIA/SAp.
PVPhotFlux PACS Photometer photometric calibration MPIA PACS Commissioning and PV Phase Plan Review 21 st – 22 nd January 2009, MPE Garching Markus Nielbock.
PACS IHDR MPE, 12/13 Nov 2003 Overall Schedule1 Otto H. Bauer MPE Garching.
Jan 21/22, 2009PACS PV Review Photometer Spatial Cal1 PACS Photometer Spatial Calibration PVPhotSpatial D.Lutz PACS PV Review Jan 21/ , MPE.
NHSC SPIRE Data School – Pasadena 28 th - 30 th June 2010 PACS page 1 SPIRE Imaging Fourier Transform Spectrometer (FTS) Pipeline Data Processing Nanyao.
NHSC Cycle 1 Open Time Proposal Planning Workshop 3-4 June 2010 NASA Herschel Science Center - page 1 PAC S prepared by Nicolas BILLOT
PACS ICC Readiness Review MPE, July 3/ PACS Photometer PV Phase Plan 1 Status Report M. Nielbock: PACS PHOT PV Phase Plan Markus Nielbock (MPIA)
CEA DSM Dapnia SAp Flux calibration of the Photometer Koryo Okumura, Marc Sauvage, Nicolas Billot, Bertrand Morin DSM/DAPNIA/Sap.
Overview, Spectrometer Products and Processing Philosophy Phil Appleton on Behalf of PACS Team PACS IFU Spectrometer.
Herschel EQM – Results and Lessons Learnt6/7 Feb 2006 PACS Overall Analysis1 Overall PACS EQM IMT Analysis Contributions by PACS ICC.
Page 1 NHSC PACS Web Tutorial Babar Ali PACS 401 PACS photometer map-making with MADmap PACS-401 for HIPE 11 user release Version Babar Ali (NHSC)
A: A: double “4” A: “34” 4.
PACS Photometer Standard Pipeline Level 0 to Level 1 processing From raw to calibrated data cubes B. Altieri (ESA/HSC), N.Billot (IPAC/NHSC) ESAC March.
PACS NHSC Data Processing Workshop Aug 26-30, 2013 Page 1 SPIRE Spectrometer Data: Calibration Updates, User Data Reprocessing, and Other Issues Nanyao.
Page 1 PACS NHSC Data Processing Workshop – Pasadena 26 th - 30 th Aug 2013 Issues with Photometer Data & How to Resolve them with HIPE Tools Kevin Xu.
The Slow Slew Survey Richard Saxton / Pedro Rodriguez November 2006.
3 He Fridge SPIRE WE Review Dec. 6-7, IFSI 1 3 He Sorption Fridge “Cooler” WE Preliminary Design Presented by: L. Rodriguez / CEA/SAp. Subsystem.
1 NHSC PACS NHSC/PACS Web Tutorials Running PACS photometer pipelines PACS-402 (for Hipe 13.0) Level 1 to Level 2.5 processing: The JScanam pipeline Prepared.
Observations with AMBER  General overview  P2VM  OB preparation with P2PP P2PP / OB / templates Available templates for observation procedure Typical.
PACS page 1 NHSC SPIRE Data Processing Webinars 8 th Feb 2012 PACS page 1 Overview of SPIRE Photometer Pipeline C. Kevin Xu (NHSC/IPAC)
STIS Status TIPS, September 17, 2009 Charles Proffitt for the STIS team.
PACS IIDR 01/02 Mar 2001 Optical System Design1 N. Geis MPE.
PMT time offset calibration (not completed) R.Sawada 27/Dec/2007.
PACS Hitchhiker’s Guide to Herschel Archive Workshop – Pasadena 6 th – 10 th Oct 2014 Overview of SPIRE Photometer Data Reduction Pipeline Kevin Xu NHSC/IPAC.
Markus Nielbock (MPIA) – PACS Calibration Status Report Herschel Calibration Steering Group Meeting #24 PACS Calibration Status Report Markus Nielbock.
Markus Nielbock (MPIA) – PACS Point Source AOT Pipeline Herschel Science Demonstration Phase Data Processing Workshop PACS Point Source AOT Pipeline Tutorial.
Herschel Calibration Workshop
PACS Calibration Status Report
THEMIS Electric Field Instrument
Review Operation Bingo
Lecture Set 14 B new Introduction to Databases - Database Processing: The Connected Model (Using DataReaders)
12.4 p 471 a) double[] number = {1.05, 2.05, 3.05, 4.05, 5.05};
Presentation transcript:

CEA DSM IRFU SAp PACS Commissioning phase, Pointing Verification and Performance Verification Phase Planning Review (CPPhot) Koryo Okumura / Marc Sauvage CEA/DSM/IRFU/SAp

CEA DSM IRFU SAp /22- Koryo OKUMURA - PACS CoP, Pointing Verification and PVP Planning Review2 Cooler Recycling 1 (CPPhotCooler and PVPhotCooler) Time driven procedure Now two extra wait time can be added: –int extra_cool_time = 0; // in second before disconnecting the evaporator from 2K –int extra_stab_time = 0; // in second after the end of the recycling procedure Duration without extra time is 8532 seconds = 2h23m

CEA DSM IRFU SAp /22- Koryo OKUMURA - PACS CoP, Pointing Verification and PVP Planning Review3 Cooler Recycling 2 (CPPhotCooler and PVPhotCooler)

CEA DSM IRFU SAp /22- Koryo OKUMURA - PACS CoP, Pointing Verification and PVP Planning Review4 Photometer orbit prologue (CPPhotSetup and PVPhotSetup) Bolometer bias setting : –default table is BOLObias_ILT_standard_low Internal calibration source (CSs) is switched on and set : –default values of CS1=48 and CS2=58 Ohm Wait for the stabilisation of the CSs –default 2100 seconds = 35 minutes Total duration : 2272s = 38 minutes

CEA DSM IRFU SAp /22- Koryo OKUMURA - PACS CoP, Pointing Verification and PVP Planning Review5 Photometer orbit epilogue (CPPhotSetup and PVPhotSetup) Common to photometer and spectrometer OBCP_SAFE is executed Duration : 13 seconds

CEA DSM IRFU SAp /22- Koryo OKUMURA - PACS CoP, Pointing Verification and PVP Planning Review6 OBCP_chopped_photometry (CPPhotBol) PCD-req Small calibration block Filter 100um and 70um Chopper plateau length 40 readouts by default Duration : 134 seconds

CEA DSM IRFU SAp /22- Koryo OKUMURA - PACS CoP, Pointing Verification and PVP Planning Review7 VRL and VH_BLIND exploration (CPPhotBol and PVPhotBol) PCD-req values of Vrl –[2.4, 2.2, 2.0, 1.8] V 9 values of VhBlind –[0.05, 0.1, 0.2, 0.3, 0.4, 0.5, 0.6, 0.7, 0.8] V Duration : 5186s = 1h27m

CEA DSM IRFU SAp /22- Koryo OKUMURA - PACS CoP, Pointing Verification and PVP Planning Review8 Low gain measurements on CSs 1 (CPPhotBol) PCD-req Low gain Filter 100um –CS1 8 blue biases [1.6, 1.8, 2.0, 2.2, 2.4, 2.6, 2.8, 3.0] V 8 red biases [1.2, 1.4, 1.6, 1.8, 2.0, 2.2, 2.4, 2.6] V –CS2 8 blue biases [1.6, 1.8, 2.0, 2.2, 2.4, 2.6, 2.8, 3.0] V 8 red biases [1.2, 1.4, 1.6, 1.8, 2.0, 2.2, 2.4, 2.6] V Filter 70um –CS1 8 blue biases [1.6, 1.8, 2.0, 2.2, 2.4, 2.6, 2.8, 3.0] V 8 red biases [1.2, 1.4, 1.6, 1.8, 2.0, 2.2, 2.4, 2.6] V –CS2 8 blue biases [1.6, 1.8, 2.0, 2.2, 2.4, 2.6, 2.8, 3.0] V 8 red biases [1.2, 1.4, 1.6, 1.8, 2.0, 2.2, 2.4, 2.6] V Duration : seconds = 3h23m

CEA DSM IRFU SAp /22- Koryo OKUMURA - PACS CoP, Pointing Verification and PVP Planning Review9 Low gain measurements on CSs 2 (CPPhotBol) parameters: –int measure_time = 300; // measure time in seconds –string startBiasTable = "BOLObias_ILT_lowCSs"; // Bias table containing the initial values –string endBiasTable = "BOLObias_ILT_lowCSs"; // Bias table containing the final values –double ra = ; // RA : 17h49m10.0s –double dec = ; // DEC : 69d48m26.0

CEA DSM IRFU SAp /22- Koryo OKUMURA - PACS CoP, Pointing Verification and PVP Planning Review10 First Telescope Background 1 (CPPhotBol) PCD-req filter 100um –vhblind downward –vhblind upward filter 70um –vhblind downward –vhblind upward Maybe another value of VL is necessary Duration : 3054s = 51mimutes

CEA DSM IRFU SAp /22- Koryo OKUMURA - PACS CoP, Pointing Verification and PVP Planning Review11 First Telescope Background 2 (CPPhotBol) Parameters: –double[] vhbs = [2.4,2.25,2.1,1.95,1.8]; // VH_BLIND values to explore –int measure_time = 60; // measure time in seconds –string startBiasTable = "BOLObias_firstTelescBack"; // Bias table containing the initial values –string endBiasTable = "BOLObias_ILT_standard_low"; // Bias table containing the final values –double ra = ; // RA : 17h49m10.0s –double dec = ; // DEC : 69d48m26.0 –int nLoops1 = 30; // number of CSs cycles during slew –int nLoops2 = 30; // number of CSs cycles during initial hold –int nLoops5 = 30; // number of CSs cycles during final hold

CEA DSM IRFU SAp /22- Koryo OKUMURA - PACS CoP, Pointing Verification and PVP Planning Review12 Low gain measurements on telescope 1 (CPPhotBol) PCD-req chopper at the optical center filter 100um –12 blue biases [1.25, 1.6, 1.8, 2.0, 2.2, 2.4, 2.5, 2.6, 2.7, 2.8, 3.0, 3.3] V –12 red biases [1.0, 1.2, 1.4, 1.6, 1.7, 1.8, 1.9, 2.0, 2.1, 2.2, 2.4, 2.6] V filter 70um –12 blue biases [1.25, 1.6, 1.8, 2.0, 2.2, 2.4, 2.5, 2.6, 2.7, 2.8, 3.0, 3.3] V –12 red biases [1.0, 1.2, 1.4, 1.6, 1.7, 1.8, 1.9, 2.0, 2.1, 2.2, 2.4, 2.6] V Duration : 9865s = 2h45m

CEA DSM IRFU SAp /22- Koryo OKUMURA - PACS CoP, Pointing Verification and PVP Planning Review13 Low gain measurements on telescope 2 (CPPhotBol) parameters: –int measure_time = 300; // measure time in seconds –string startBiasTable = "BOLObias_ILT_standard_low"; // Bias table containing the initial values –string endBiasTable = "BOLObias_ILT_standard_low"; // Bias table containing the final values –double ra = ; // RA : 17h49m10.0s –double dec = ; // DEC : 69d48m26.0 –int nLoops1 = 30; // number of CSs cycles during slew –int nLoops2 = 30; // number of CSs cycles during initial hold –int nLoops5 = 30; // number of CSs cycles during final hold

CEA DSM IRFU SAp /22- Koryo OKUMURA - PACS CoP, Pointing Verification and PVP Planning Review14 Glitch statistics measurements (CPPhotBol) Burst mode and buffer transmission mode CUS script exists but is still missing in CPPhotBol database

CEA DSM IRFU SAp /22- Koryo OKUMURA - PACS CoP, Pointing Verification and PVP Planning Review15 Field of view measurement (CPPhotBol) PCD-req Filter 100um Chopper forward and backward scan Filter 70um Chopper forward and backward scan Duration : 1381seconds = 24 minutes

CEA DSM IRFU SAp /22- Koryo OKUMURA - PACS CoP, Pointing Verification and PVP Planning Review16 Scan AOT test (CPPhotBol) PCD-req Before pointing offset determination Source : M51 or M87 Scan –Medium scan speed –Leg lenfth : 40 arcmin –Number of legs : 15 –Cross scan step : 150 arcsec Duration : 2537 seconds = 43 minutes

CEA DSM IRFU SAp /22- Koryo OKUMURA - PACS CoP, Pointing Verification and PVP Planning Review17 Point source AOT test (CPPhotBol) Before pointing offset determination Source : M87 With and without dither Duration : 2 x 816 seconds = 28 minutes

CEA DSM IRFU SAp /22- Koryo OKUMURA - PACS CoP, Pointing Verification and PVP Planning Review18 SIAM test (CPPhotBol) Before pointing offset determination Source : MNL-Cyg Scan –Medium scan speed –Leg lenfth : 40 arcmin –Number of legs : 15 –Cross scan step : 150 arcsec Duration : 2537 seconds = 43 minutes