ALICE TPC field cage status Sardinia May 2004 Michael Hoch Cern-TA2.

Slides:



Advertisements
Similar presentations
TPC meeting, Sardinia, May 2004Børge Svane Nielsen, NBI1 Status of laser system TPC meeting, Sardinia, May 2004 Børge Svane Nielsen Niels Bohr.
Advertisements

Muon EDR: Chamber design M2/3 R1/2 16/04/20031T.Schneider/LHCb Muon EDR 1.General description - AW read out -Cathode pad read out -HV supply 2.Details.
Manchester 09/sept/2008A.Falou & P.Cornebise {LAL-Orsay}1 CALICE Meeting/ Manchester Sept 2008 SLAB Integration & Thermal Measurements.
Optical Manufacturing Solutions 1 Probe Assembly.
TPC meeting, NBI, 2-3 September 2002Børge Svane Nielsen, NBI1 Status of laser system TPC meeting, Copenhagen, 2-3 September 2002 Børge Svane Nielsen, Jørn.
Laser Design Review, CERN, 27 Jan 2003Børge Svane Nielsen, NBI1 TPC Laser system  Functions of the system  Basics of the design  Construction tolerances.
TPC meeting, CERN, 7-8 October 2003Børge Svane Nielsen, NBI1 Status of laser system TPC meeting, CERN, 7-8 October 2003 Børge Svane Nielsen, Niels Lindegaard,
Michael Hoch / EP-AIT1 TPC Resistor Rod. Michael Hoch / EP-AIT2 Resistor Chain: Design Constrains  current per resistor chain: 241  A = 25W (total =
PEUGEOT 206 INSTALLATION 99’— 05’ TU5JP4
PKI-Anwendungen 6/2/ Base framework. PKI-Anwendungen 6/2/ Bottom frame.
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
AMS-02 tracker mechanics status of assembly and integration Inner tracker integration completion: - Assembly and cabling - Temperature and magnetic field.
Edda Gschwendtner1 Status of the TPG B. Bene, A. Blondel, E. Gschwendtner, J.-P. Richeux, R. Sandstrom, O. Voloshyn Universite de Geneve S. Giani, J.-C.
1 Installation of Delphi Frame  ITS Installation.
The LHCb Inner Tracker Marc-Olivier Bettler SPS annual meeting Zürich 21 February 2007.
Preliminary Design Review Week 7 Group A3: HMS “Bloodhound” Matt Prygoski Matt Morris Jay Slaggert Fred Thwaites Dan Zibton Thursday March 20, 2008.
PRR TRD COOLING A. Marín (GSI) 7/01/2004 ALICE PRR TRD COOLING P.Glässel, A.Marín, V.Petracek, J.Stachel, M.R.Stockmeier, J.P.Wessels ALICE PRR TRD COOLING.
Coil Manufacture, Assembly and Magnetic Calibration Facility for Warm and Cold Magnetic Measurements of LHC Superconducting Magnets CERN AT-MTM 1 / 21.
ILC Main Linac Superconducting Cryogen Free Splittable Quadrupole Progress Report V. Kashikhin for Superconducting Magnet Team.
SSD Operations Manual March 2014 SSD: 4 th layer of vertex detector Heavy Flavor Tracker Silicon Strip Detector – Operations Manual PXL Inserted from this.
The STAR HFT PXL system is designed to be inserted in situ. Is housed in 2 large frame aligned with rails inside Inner Detector Support. Inserted from.
Chiho Wang ATLAS TRT Duke University CERN, Feb TRT Barrel assembly status & schedule Feb. 9, 2005.
ALICE-LHCC Review January 29-30, 2001 Thomas C. Meyer/EP-AIT1 General Layout Four separate vessels: –Outer containment vessel –Inner containment vessel.
Survey of cathode deformations and further actions F. Vercellati – INFN-PV C. Montanari – CERN / INFN-PV weekly meeting, March 12,
Ron Madaras, LBL U.S. Pixel Meeting, SCIPP, July 9-10, 2003 Patch Panel 1 (PP1) Brief Review Cost and Effort Estimate.
TB Peter Glässel, Heidelberg1 TPC Progress Project leader: Peter Braun-Munzinger, GSI Darmstadt Deputy project leader: Johanna Stachel, Heidelberg.
Status of CERN M1R2 production LHCb Muon meeting sept.061Thomas Schneider -Beginning of 2006 two visits to Erbicol because of several reasons: -Material.
Status and outlook of the Micromegas modules D. Attié, D.S. Bhattacharya, P. Colas, S. Ganjour, et al. LCTPC Collaboration meeting DESY, 30/05/2014.
ILC / ILD TPC Requirements of the support mechanics Volker Prahl ILD Workshop 2013 Cracow
Ultra-Compact Electrical Machines for Wind Energy DE-FOA : Demo Machine C. L. Goodzeit and M. J. Ball May 1, 2014 Part 1: Design and Construction.
ALICE-LHCC Review May 14, 2001 Thomas C. Meyer/EP-AIT1 TPC Field Cage Progress Report Project Schedule Technical Progress & Prototyping Contractual Matters.
1 Fulvio TESSAROTTO the new RICH beam pipe the new RICH beam pipe - pipe production, gluing and tests - measurement and removal of the old pipe - fixation.
May 2001, Istanbul Workshop High Voltage Plates and Capacitor Status Jack Fowler.
Forum March 2003H.Taureg1 Magnetic Fields in ALICE Mapping and Monitoring.
ALICE TPC Status, Meeting with LHCC referees ALICE TPC – Status Report Project leader: Peter Braun-Munzinger, GSI Darmstadt Deputy project leader:
Installation Review March ‘03 TPC Thomas C. Meyer/EP-AIT 1 Pre-installation and Functional Tests StartFinish  Certification of field cage…………………
16/04/20031PNPI / LHCb Muon EDR Wire Pad Chambers PNPI design for regions R4 in Stations M2,M3,M4  4 gas gaps of 5mm±70µm;  Active area: 1224x252.8 mm².
Chiho Wang Duke University 1 TRT Barrel integration Status / Schedule Chiho Wang.
Long Bo for LAPD Hans Jostlein10/20/2011 December 15, 2015 Long Bo for LAPD 1.
Activities Status and Plan for the week D. Giugni Monday Meeting
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept and status of the PSD temperature control - Concept of the PSD analog part.
Marian Ivanov TPC ExB and V drift calibration and alignment.
Muon Meeting April 2004JsG Status of Chambers Production at CERN Jean-Sebastien Graulich o Open Questions from the PRR O-ring Aging, Aging tests, Storage.
TB Peter Glässel, Heidelberg1 TPC Status Report Project leader: Peter Braun-Munzinger, GSI Darmstadt Deputy project leader: Johanna Stachel, Heidelberg.
Status of the PSD upgrade - Problems with PSD in Be runs - Modification of cooling system - New temperature control - Upgrade of HV control system - MAPD.
Technical FORUM, Peter Glässel, Heidelberg1 TPC Progress Project leader: Peter Braun-Munzinger, GSI Darmstadt Deputy project leader: Johanna Stachel,
Alignment Meeting, CERN, Sept 19, 2006O.Prokofiev 1 EMU Alignment System Analog Data Analysis for ME+1yME+4 Stations Run: Aug 25-28, 2006 Magnetic field.
HMPiD upgrade variant; simulation status N. Smirnov Physics Department, Yale University, May, 06. CERN visit.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept of the PSD temperature stabilization and control - Upgrade of HV control system.
TB Peter Glässel, Heidelberg1 Preparing TPC Installation.
EMU Meeting, CERN, Sept 18-19, 2006O.Prokofiev 1 EMU Alignment System Analog Data Analysis for ME+1yME+4 Stations Run: Aug 25-28, 2006 Magnetic field up.
Chiho Wang ATLAS TRT Duke University CERN, Sep Barrel integration status.
Technical Design for the Mu3e Detector Dirk Wiedner on behalf of Mu3e February Dirk Wiedner PSI 2/15.
CPA: Decisions, Issues, Next steps Francesco PIETROPAOLO CERN / INFN-Padova Field Cage CPA and Integration/Installation week, BNL, March 11th, 2016.
T2 GEM Production in Helsinki Kari Kurvinen TOTEM T2 EDR meeting Radiation Detector Laboratory of Helsinki Institute of Physics (HIP) and Department.
Sentek Technologies Joining EnviroSCAN Probes. Probe Components 20-way probe cable connector (special order) Cable spacer (Part No 80015) Probe rods Probe.
Single Phase ProtoDUNE TPC CERN The SP TPC Team Jan. 13, 2016.
Update of MVD services and requests
Pre-installation and Functional Tests
Laser calibration systems
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
New field cage LP2 Ole Bach, Bernd Beyer, Volker Prahl
Integration issues at IHEP
Requirements of the support mechanics
Some proposals on HV circuits realization for segmented straw detector
TPC Field Cage Progress Report
SIT AND FTD DESIGN FOR ILD
as a prototype for Super c-tau factory
Industrial Exhibitor Very accurate positioning system, patent < 1 um, range ~5mm Stepping motors, active compensation (tilt/height/radial) Soft.
Presentation transcript:

ALICE TPC field cage status Sardinia May 2004 Michael Hoch Cern-TA2

Field Cage Feb. 04 Strips on the muon side completed

Temperature sensors inside the volume 4-wire Pt 1000 sensors purchased –50 pieces with 1m wire Calibrated to two calibr. reference pt1000 –(±3mK at 20 degree) –Calibration range between ~7- 25 degree –Residuals fit by Danilo -> ±10mK

Shaft side temperature sensors Glued on to the skirt of the 18 sectors

Muon side temperature sensors 4 sensors at the inner cylinder

Shaft side connectors and feed- troughs Pt 1000 Skirt supply Last resistors guard ring chains Last resistors R-rods Last strip supply

Electrical connections inside

Map of all connections on the endplate

Field Cage March 04 Once more HV test (1500V between strips) & cleaned -Muon side completed-

Displacement rails mounted turning clamp

Field cage turn over

Resistor rod RR final assembly

Resistor selection Resistor dispersion results in a field distortion of maximal 40  m (presented by Danilo; status field cageFeb. 04)

Resistor Rods shaft side

<< Resistor Rod outlet on the endplate Resistor Rods shaft side Hooks on the outlet side >>

Resistor rod shaft side HV tests 1500V between hooks 15kV between Al-guard rings 120kV in the test box

Resistor rod shaft side HV tests

Rod installation

Laser system control Laser beam mapping by Borge Cross checked by Rainer

central membrane 0.8mm wire connecting the outer and inner CE-flange Conductive glue -> CE-flange-Al-Mylar foil

Potential strips shaft side

visit from GSI

Shaft side strips finished

I-bar survey system tests

I-bar survey: BCAM system test Bicam system tests with Panos Christakoglou

Outlook: Installation of 18 pt1000 inside the volume Electrical connection/ feed troughs Test HV: – 1500V between each strip –120kV Cleaning of the volume Installation of external temperature sensors Turning of the field cage, closure of the volume He & final integral leak test Installation of the charge to the sliding feeds

Thank you for your attention TPC meeting Sardinia May 2004 Michael Hoch CERN TA2