Sport Facility Management. Chapter 5 Facility Site and Design.

Slides:



Advertisements
Similar presentations
Golf Course Construction Planning TRF 250 Golf/Sports Field Construction.
Advertisements

HUGHES STADIUM ANALYSIS
Module 2: Bioretention Area Siting and Design Andy Rowe, PE, LEED AP, QSD Cannon.
Avenida La Pata/Avenida Vista Hermosa Community Park PRESENTATION TO CITY COUNCIL and PARKS AND RECREATION COMMISSION December 15, 2004.
NORTHWESTERN ATHLETICS: Programs In Action Amy Potter, General Manager Ryan Chenault, Associate Director for Sales & Marketing.
Recent Bond Accomplishments. Bordeaux Elementary Remodel.
Avenida La Pata/Avenida Vista Hermosa Park and Development Study Land Use Charette MAY 15, 2004.
Needs Assessment & Master Plan. Needs Assessment & Master Plan Results Proposed Plan Costs Needs Safety Issues About Savage Field Environmental Impact.
Agricultural Sciences Center Science, Technology, Engineering and Mathematics Project Center Second Stadium Three Proposed Facilities.
Sports Complex Proposal GARY ROBERTS AND TRAVIS PALMER.
General Provisions Affordable Housing Signs Transfer of Development Rights 2009 ULDC Update September 8,
Facilities Design Principles Chapter 28. Planning Pitfalls Failure to provide accommodations for handicapped Failure to provide adequate storage Failure.
Why Baseball? Chance to add to the athletic culture of the school. Attract new student base to the school. Generate a fan base and offer baseball youth.
Land or Site Description Wayne Foss, MBA, MAI, CRE Foss Consulting Group
C H A P T E R 19 Applied Sport Finance Chapter 19.
Amateur Sports Development at Bojangles Coliseum & Ovens Auditorium June 5, 2014 Economic Development & Global Competitiveness Committee.
Overview the local, state, and federal regulatory authorities which affect the interim housing mission Identify vital stakeholders with regulatory authority.
PowerPoint Presentation
St. Ambrose University Main Campus Planned Institutional District Application December 15, 2011.
An Urban Food System is one in which food production, processing, distribution, consumption and disposal of end products are integrated to enhance the.
Community Competition Complex. Current Game Conditions Center of game field at high school following fall 2006.
HOME OF THE U.S.A. NATIONAL TEAM DEVELOPMENT PROGRAM (USANTDP) Leah Trattles Mike Pilcher.
Fullerton College Physical Education Project Community Meeting March 11, 2009.
Foster and sustain the environmental and economic well being of the coast by linking people, information, and technology. Center Mission Coastal Hazards.
Golf/Tennis-Based Resorts: The Impact of Development on Operations
1 Demand Feasibility Study For a Multi-Purpose Event Center in Texas.
Philadelphia Eagles Football Stadium Negotiations.
PC Meeting July 1, 2015 CUP 15-02/DR 15-06/DR
North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS District Wide Masterplan December 13, 2010.
GUHSD CITIZENS COMMUNITY MEETING MARCH 24-26, 2015 Facilities and Capital Budget Overview This Presentation Will Be Posted On Our Website:
 Stadium Trends  Arguments for Public Funding of Stadiums  Arguments against Public Funding of Stadiums  The Dollar Value of A Fans Pride  Who should.
The Stadium Project The Memorial Field at the Institution for Savings Stadium.
Fanning Howey Stuck Associates Brailsford & Dunlavey Woods Group RDI Board of Education Work Session July 10, 2014 We promise to put children first!
Urban Planning / Transportation Engineering Project.
Slippery Rock University Facility Overview. General Information  Located less than 1 hour from Pittsburgh.  Located 1 hour from Erie.  Located 10 minutes.
SBC Park Jack Conway Tom Wirnen John Colginerio. Introduction  Home of MLB’s san Francisco giants  Opened in April  Cost to build was $357 million.
Sports Venue. San Diego Pandas Mascot Logo Stadium Design INSIDE OUTSIDE.
Klein High School Original building built in 1963 Move KHS to HS #5 in 2011 Move back to renovated KHS in 2013.
Author name here for Edited books chapter 5 Facility Site and Design 5 chapter.
HENDERSON MIDDLE SCHOOL “The Grand Old Campus” CAMPUS FACILITY ISSUES.
Planning Construction Chapter 15. Private Sector  Most buildings and other structures are built for ordinary people. These people make up the private.
DECEMBER 12, 2012 NEWPORT BEACH COUNTRY CLUB Application No.: Item: W 11a.
Focus Areas Learning environments that meet the needs of today’s learners Safe and secure buildings and grounds Improve district infrastructure.
Parks & Recreation Suburban/Rural Urban. Parks and Recreation Avoid Decentralized Facilities Tennis Centers/Hubs –Economical Programming –Maintenance.
Valuing The Site Basic Real Estate Appraisal: Principles & Procedures – 9 th Edition © 2015 OnCourse Learning Chapter 10.
Update: Where We Are and Feedback Lake George Stream Corridor Management Stake Holder Meeting June 25, 2008.
Municipal Services and How We Pay for Them Adapted from a Presentation Prepared for Local Government Week by AMCTO (Association of Municipal Managers,
Learning the Basics of Recreation Facilities 3 chapter.
Naperville Park District Outdoor Recreation Opportunities.
Chapter 5 Bidding and Planning for Different Events.
Chapter 6 Designing Recreation Facilities and Reading Blueprints.
Learning the Basics of Recreation Facilities
ET 493: Senior Design Design of a New Hammond Head Start Center By: Cody Menard and Taylor Bishop Instructor: Dr. C. Koutsougeras Advisor: Mr. R. Edward.
2007 DSISD School Bond Program DRIPPING SPRINGS INDEPENDENT SCHOOL DISTRICT Bond Election: November 6, 2007.
Chapter 11 Traditional Revenue Generation in Sport and Recreation.
LAND Subdivie a 4.27 acres into 18 lots 17 detached single family homes One duplex Base density allows for unit Affordable housing bonus.
Distribution of Sports Getting the Experience to the Fans Written by: Memory Reed Georgia CTAE Resource Network 2010.
Ball Field Land Acquisition Due Diligence Report.
6/27/ Armistead Pointe Park – City Council Work Session City of Hampton. Guernsey Tingle Architects. 22 January 2014.
PowerPoint Presentation
Cornwall Central School District
ET 494: Senior Design Design of a New Hammond Head Start Center
Concept Plan for Proposed Park Near Hopewell School
WOU Budget Committee February,
Decisions and considerations of choosing or building a new home.
Prepared By: Amy Fogg, Jill Kuenne, Jena Laolagi, and Devin McElvogue
Competency: Create site plan drawings
Photovoltaic Systems Engineering Utility Scale Development:
Recent Bond Accomplishments
WSUP The Club at ArrowCreek Grading
Presentation transcript:

Sport Facility Management

Chapter 5 Facility Site and Design

Raymond James Stadium in Tampa Bay, Florida (finished in 1999) Total seats- 66,321, expandable to 75,000 Total seats- 66,321, expandable to 75,000 Club seats- Yes Club seats- Yes Luxury suites- 159 Luxury suites- 159 Disabled seats- 300 disabled and 300 companion-expandable to 650 Disabled seats- 300 disabled and 300 companion-expandable to 650 Seat size ” Seat size ” Seat-to-seat space ” Seat-to-seat space ” Escalators-20 Escalators-20 Elevators- 20 Elevators- 20 Guest TVs- 1,158 Guest TVs- 1,158 Permanent novelty stands-8 Permanent novelty stands-8 Permanent concession satnds-48 Permanent concession satnds-48 Temporary concession stands- 124 Temporary concession stands- 124 Security cameras- 12 Security cameras- 12 Restrooms- 44 Restrooms- 44 Information booths- 12 Information booths- 12 ATMs- 8 ATMs- 8 Press box seating- 225 Press box seating- 225 First aid rooms- 5 First aid rooms- 5

American Airlines Center Facts 19,200 seats for basketball 19,200 seats for basketball 18,500 seats for hockey 18,500 seats for hockey 20,021 seating capacity for concerts 20,021 seating capacity for concerts 1,600 club seats 1,600 club seats 2,000 platinum seats 2,000 platinum seats Over 500 accessible seats Over 500 accessible seats 142 suites ranging in price from $150,000-$300,000 per season 142 suites ranging in price from $150,000-$300,000 per season 840,000 square feet 840,000 square feet 24 ticket windows 24 ticket windows 12 escalators/10 elevators 12 escalators/10 elevators 550 televisions throughout the facility 550 televisions throughout the facility 280 men’s rooms urinals and 96 stalls 280 men’s rooms urinals and 96 stalls 337 women’s room stalls 337 women’s room stalls

Staples Center, Los Angeles, CA (2000) Basketball Seating: 20,000 Basketball Seating: 20,000 Hockey Seating: 18,118 Hockey Seating: 18,118 Luxury Suites: 160 Luxury Suites: 160 Concession Stands: 23 Concession Stands: 23 Elevators: 10 Elevators: 10 Escalators: 11 Escalators: 11 Restrooms: 55 Restrooms: 55 Locker Rooms: 12 Locker Rooms: 12 Watts of Audio Amplifications: 125,500 Watts of Audio Amplifications: 125,500 Feet of Fiber Optic Cable: 148,000 Feet of Fiber Optic Cable: 148,000 Tons of Structural Steel: 2,500 Tons of Structural Steel: 2,500 Cubic Yards of Concrete: 73,000 Cubic Yards of Concrete: 73,000 Miles of Data/Telephone Cables: 14 Miles of Data/Telephone Cables: 14 Square Yards of Carpeting: 32,500 Square Yards of Carpeting: 32,500 Square Feet of Terrazzo Tile: 81,000 Square Feet of Terrazzo Tile: 81,000 Square Feet of Drywall: 2,865,000 Square Feet of Drywall: 2,865,000 Feet of Broadcast production Cable: 3,800,000 Feet of Broadcast production Cable: 3,800,000

Maple Leaf Gardens It took 1,200 construction workers five months and twelve days to build the yellow brick faced structure. It took 1,200 construction workers five months and twelve days to build the yellow brick faced structure. The Gardens was built for $1.5 million dollars. The Gardens was built for $1.5 million dollars. The Gardens had 16,000 seats and 85 boxes. The Gardens had 16,000 seats and 85 boxes. Construction costs were minimized as a result of agreements made with labor unions to provide the workers with Maple Leaf Gardens stock in place of a portion of their earnings. Construction costs were minimized as a result of agreements made with labor unions to provide the workers with Maple Leaf Gardens stock in place of a portion of their earnings. The building materials included 750,000 bricks, 77,500 bags of cement and 70 tons of sand. The building materials included 750,000 bricks, 77,500 bags of cement and 70 tons of sand. The 350’ by 282’ (106m by 86m) building extends thirteen stories (40m) above street level. The 350’ by 282’ (106m by 86m) building extends thirteen stories (40m) above street level. Opening night seat prices ranged from 95 cents to $2.75. Opening night seat prices ranged from 95 cents to $2.75.

Yale University Facilities The Yale Bowl The Yale Bowl opened in 1914 for the Yale-Harvard football game. The Bowl has hosted professional football, World Cup soccer, and the 1995 World Special Olympics Games. The stadium covers 12.5 acres and can hold 65,000 fans. The Bowl is 930 feet long by 750 feet. When the stadium was built, horse drawn vehicles moved 320,000 cubic feet of earth to create the Bowl shape which was formed with 22,000 cubic yards of concrete and 470 tons of steel. There is approximately 30 miles of wooden-backed seats. The entire stadium cost $750,000 (The Ohio Stadium highlighted in the Big Ten chart above cost $1.3 million to build in 1922) and has undergone several renovations including a new scoreboard in 1958, a press box in 1986 and a new field in The Yale Bowl opened in 1914 for the Yale-Harvard football game. The Bowl has hosted professional football, World Cup soccer, and the 1995 World Special Olympics Games. The stadium covers 12.5 acres and can hold 65,000 fans. The Bowl is 930 feet long by 750 feet. When the stadium was built, horse drawn vehicles moved 320,000 cubic feet of earth to create the Bowl shape which was formed with 22,000 cubic yards of concrete and 470 tons of steel. There is approximately 30 miles of wooden-backed seats. The entire stadium cost $750,000 (The Ohio Stadium highlighted in the Big Ten chart above cost $1.3 million to build in 1922) and has undergone several renovations including a new scoreboard in 1958, a press box in 1986 and a new field in 1993.

Yale University Facilities Coxe Cage Coxe Cage is the home to Yale’s men's and women's indoor track teams which was originally constructed in 1928 at a cost of $300,000 and renovated in the early 1980s. The Cage (356 feet by 156 feet) has an 83- foot ceiling and reportedly one of the largest skylights ever built (26,000 square foot). There is approximately 3.3 million cubic feet of air space in the structure. All indoor track and field events are held within the oval Cage, including throwing events (“Coxe Cage,” 2002). Coxe Cage is the home to Yale’s men's and women's indoor track teams which was originally constructed in 1928 at a cost of $300,000 and renovated in the early 1980s. The Cage (356 feet by 156 feet) has an 83- foot ceiling and reportedly one of the largest skylights ever built (26,000 square foot). There is approximately 3.3 million cubic feet of air space in the structure. All indoor track and field events are held within the oval Cage, including throwing events (“Coxe Cage,” 2002). Yale Tennis Center The tennis complex at Yale includes 22 outdoor Deco Turf II courts, five outdoor clay courts, four indoor Deco Turf II courts, and a 15,000-seat, one court, tennis stadium. The stadium is the fourth largest in the world, and third largest in the United States. Each August, The Pilot Pen International Tournament is played on the outdoor courts. In addition to the outdoor courts there is an indoor tennis center with four courts (Bialik, 1998). The tennis complex at Yale includes 22 outdoor Deco Turf II courts, five outdoor clay courts, four indoor Deco Turf II courts, and a 15,000-seat, one court, tennis stadium. The stadium is the fourth largest in the world, and third largest in the United States. Each August, The Pilot Pen International Tournament is played on the outdoor courts. In addition to the outdoor courts there is an indoor tennis center with four courts (Bialik, 1998).

Yale Facilities Yale BowlPayne Whitney Gym

Site Selection Issues Site issues may include: -Detailed geography (soil, subsoil, vegetation) -Detailed geography (soil, subsoil, vegetation) -Population composite (demographics of area) -Population composite (demographics of area) -Constituency representation (political clout) -Constituency representation (political clout) -Flood area (drainage, runoff) -Flood area (drainage, runoff) -Climate, precipitation, winds, natural disaster strikes (i.e. hurricane paths, tornadoes, earthquakes, floods, etc.) -Climate, precipitation, winds, natural disaster strikes (i.e. hurricane paths, tornadoes, earthquakes, floods, etc.) -Capital Improvement Plan maps (illustrating current and planned projects by council district) -Capital Improvement Plan maps (illustrating current and planned projects by council district) -Enterprise zone ownership and land use maps -Enterprise zone ownership and land use maps -Acreage (adequate for buildings, parking, picnic areas, etc.) -Additional acreage for expansion, -Acreage (adequate for buildings, parking, picnic areas, etc.) -Additional acreage for expansion, -Shape (acute angles or odd shapes are possible wasted space. -Shape (acute angles or odd shapes are possible wasted space. -Topography (level terrain, steep slopes) -Topography (level terrain, steep slopes) -zoning regulations (permit required, parking, setbacks, etc.) -zoning regulations (permit required, parking, setbacks, etc.) -access (from principal roads, local streets, truck-or bus access) -access (from principal roads, local streets, truck-or bus access) -security considerations -security considerations

Site Selection Issues Following the selection of a proposed site, the following features of the site plan should be considered: Off-site nuisances (for example; rivers, sewage treatment plants, industries) Off-site nuisances (for example; rivers, sewage treatment plants, industries) Safety factors (roads, buffer zones, sight-lines, emergency access) Safety factors (roads, buffer zones, sight-lines, emergency access) Proper drainage for turf and hard-surface areas (flood zone area) Proper drainage for turf and hard-surface areas (flood zone area) Fencing and planting to serve as separation of areas Fencing and planting to serve as separation of areas Placement of service building for safety, control and supervision (access for vehicles) Placement of service building for safety, control and supervision (access for vehicles) Layout of walkways for safe and efficient circulation (must meet ADA requirements) Layout of walkways for safe and efficient circulation (must meet ADA requirements) Lighting of fields, courts and general areas Lighting of fields, courts and general areas Cost of maintenance (preventative and corrective) Cost of maintenance (preventative and corrective) Provision of first-aid facilities, equipment and supplies Provision of first-aid facilities, equipment and supplies Advantage should be taken of existing topographic features, trees and vegetation Advantage should be taken of existing topographic features, trees and vegetation Accessibility and use of the site for the aging and disabled, and Accessibility and use of the site for the aging and disabled, and Use of durable and vandal-proof materials and equipment. Use of durable and vandal-proof materials and equipment.

Site Selection Issues Various factors that go into making a final decision include: Review of feasibility studies (economic and political impact) Review of feasibility studies (economic and political impact) Permits (lease, license or letter) Permits (lease, license or letter) Site information (environnemental issues) Site information (environnemental issues) Regulations (building codes, health ordinances etc.) Regulations (building codes, health ordinances etc.) Community involvement Community involvement Financing (public or private) Financing (public or private) Easements Easements Zoning (cluster, flood-plain, open-space) Zoning (cluster, flood-plain, open-space) Restrictive covenants Restrictive covenants Aesthetic value and, Aesthetic value and, Recreational opportunities Recreational opportunities

Site Selection Process The following diagram highlights all the various issues that impact the site location decision. Site Selection Criteria Suitability of Site Site Selection Criteria Suitability of Site Competitive Forces Special Restrictions Alternative LocationsLocation/Land Site Development Concerns Lease vs. Purchase Tax Implications Mission and Goals Government Regulations Valuation Concerns Neighbor Concerns

Environmental Issues Need to check soil- soil samples or core drilling Need to check soil- soil samples or core drilling Check grading to make sure the site is useable Check grading to make sure the site is useable Check environmental issues and endangered animals Check environmental issues and endangered animals

Buying vs. leasing What is the best option? What is the best option? Perform an economic impact analysis Perform an economic impact analysis

Features What features would you most like to include in your ideal NBA arena? What features would you most like to include in your ideal NBA arena? Draw a rough layout of the arena. Draw a rough layout of the arena.

Discussion Questions Page 100 Page and and 5