Corner Raft Conceptual Design Corner Raft Conceptual Design Kirk Arndt, Ian Shipsey Purdue University LSST Camera Workshop SLAC Sept. 16-19, 2008.

Slides:



Advertisements
Similar presentations
ZTF Mechanical Walkthrough Matthew Hoff ZTF Technical Meeting 1.
Advertisements

The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
Flex Circuit Design for CCD Application ECEN 5004 Jon Mah.
MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
(1) - Camera Electronics - Status and Update on changes since Aug July 07 John Oliver and the Camera Electronics team.
Manchester 09/sept/2008A.Falou & P.Cornebise {LAL-Orsay}1 CALICE Meeting/ Manchester Sept 2008 SLAB Integration & Thermal Measurements.
ATLAS SCT Endcap Detector Modules Lutz Feld University of Freiburg for the ATLAS SCT Collaboration Vertex m.
GLAST LAT Silicon Tracker Marcus ZieglerIEEE The Silicon Tracker Readout Electronics of the Gamma-ray Large Area Space Telescope Marcus Ziegler.
Cryostat Assembly 17 September 2008 Martin Nordby, Rafe Schindler, Gary Guiffre, Rick Van Berg.
Science Specification Table 12 keV keV for neutral particles 40.5 cm 2 image plane Electronic Noise 3 keV FWHM Proton Dead Layer
Integration and Test 14 October 2008 Martin Nordby.
Midterm Review MBS 2006 MP Electronics, Basic Concept  Two modules:  Probe module  Surface module  The surface module is replaced by the.
Cryostat Structural, Thermal, and Vacuum Systems 14 October 2008 Martin Nordby, Gary Guiffre, John Ku, John Hodgson.
SPP FIELDS V5 Antenna Mechanical Peer Review David Glaser, Paul Turin, Jeremy McCauley, John Bonnell, Dennis Seitz SSL UCB 7/17/13.
LSST Electronics Review – BNL, January LSST Electronics Review BNL January Raft Electronics Overview R. Van Berg Electronics Mini-Review.
LSST Electronics Review – BNL, January LSST Electronics Review BNL January Monitoring and Configuration R. Van Berg Electronics.
Eddington Kick-Off. Vienna, September 17th, 2001 T.Muñoz/C.Laviada (INTA) 1 EddiCam: The Eddington Photometric Camera Preliminary Design Layout.
SVX4 chip 4 SVX4 chips hybrid 4 chips hybridSilicon sensors Front side Back side Hybrid data with calibration charge injection for some channels IEEE Nuclear.
LSST Electronics Review BNL January 25-26, LSST Electronics Review BNL January 25-26, 2012 Electronics Development Plan and Vertical Slice Test (VST)
Proposal of new electronics integrated on the flanges for LAr TPC S. Cento, G. Meng CERN June 2014.
Corner Raft Test Station Kirk Arndt, Ian Shipsey Purdue University LSST Camera Workshop SLAC Sept , 2008.
Engineering: NAHUAL Ireland Acquisition Camera, Focal Plane Mechanisms and Layout Tully Peacocke, National University of Ireland Maynooth Carlos del Burgo,
LSST Electronics Review – BNL, January LSST Electronics Review BNL January Power & Voltage Plan R. Van Berg Electronics Mini-Review.
26 April 2013 Immanuel Gfall (HEPHY Vienna) Belle II SVD Overview.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 5.1 Grid Box Design 1 GLAST Large Area Telescope:
Utilities 14 October 2008 Martin Nordby, Gordon Bowden.
Single Board Controller Comments Roger Smith Caltech
Tracker Production Overview Readout Cables UCSC, SLAC (Parlex) SSD Procurement, Testing SLAC,Japan, Italy (HPK) Electronics Fabrication, burn-in, & Test.
Update on the HBD Craig Woody BNL DC Meeting June 8, 2005.
LSST Electronics Review – BNL, January LSST Electronics Review BNL January Electronics Development Plan Goals and Plans for
AIDA 1 Mezzanine board Contacts for underside connectors Thermal contact pads.
Typical product developments and applications JF Daucourt Product Development & Quality Manager.
Positioning fork M. Ciappeti R. Vuillermet 29/09/20111.
CLAS12-RICH Mechanical Design Status-Report CLAS12 RICH Review September 5-6 th 2013 S. Tomassini, D. Orecchini1 D. Orecchini, S. Tomassini.
R&D for a 2nd generation AHCAL prototype LCWS 2007 – DESY Hamburg Mathias Reinecke on behalf of the AHCAL partners.
FVTX Review, November 17th, FVTX Mechanical Status: WBS 1.6 Walter Sondheim - LANL Mechanical Project Engineer; VTX & FVTX.
IPC In-Circuit Test Fixtures In-circuit test fixtures are commonly called bed-of-nails fixtures. A bed-of- nails fixture is a device with.
Proposal for the assembly of the PHOBOS ring counters (H.P. 3/20/98) I would like to propose and discuss with you an alternative layout and assembly procedure.
LAr1 Plans at FNAL Bruce Baller - Fermilab. Outline LAGUNA Meeting - Mar  LBNE LAr detector overview  Prototyping plan  1 kton prototype.
ZTF Interconnecting Scheme Stephen Kaye
Connector Differential Receiver 8 Channels 65 MHz 12 bits ADC FPGA Receive/buffer ADC data Format triggered Events Generate L1 Primitives Receive timing.
Status of the PSD upgrade - Problems with PSD in Be runs - Modification of cooling system - New temperature control - Upgrade of HV control system - MAPD.
1 03/21/2006 GLAST CU Beam Test Workshop Scanning Table.
TPC electronics Status, Plans, Needs Marcus Larwill April
MICE Prototype Coupling Coil Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM38 - Napa California February 25, 2014 February.
Single Board Controller Comments Roger Smith Caltech
RICH2 support and cooling mechanics status update Massimo Benettoni July 30,
Upgrade PO M. Tyndel, MIWG Review plans p1 Nov 1 st, CERN Module integration Review – Decision process  Information will be gathered for each concept.
C osmic R Ay T elescope for the E ffects of R adiation CRaTER Thermal Analysis Huade Tan 6/27/05.
Wire and Cathode Planes - Current Concept (work in progress) PPD Internal Review – 2 nd Part April 19 th, 2005 Rafael Silva FLARE Fermilab Liquid Argon.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
LSST Camera Electronics Overview September 16, 2008 R. Van Berg for the LSST Electronics Team.
Juin 1st 2010 Christophe Beigbeder PID meeting1 PID meeting Electronics Integration.
Cloudland Instruments Hawkeye Mechanical Design Snapshot Compiled April 8th, 2016.
Cloudland Instruments Hawkeye Electronics Snapshot March 10th, 2016.
1 Corner Rafts LSST Camera Review SLAC Oct. 14, 2008 Scot Olivier LLNL.
USCMS Pixel PMG, Nov 29, Mechanics Status Disks, ½ Service Cylinders Installation USCMS FPIX FNAL PMG Joe Howell Bruno Gobbi Nov. 29, 2006.
TPC Support Installation 26 Apr 2016Dan Wenman Mechanical Engineer1 Overview Installation of the support rails Details of the rail from the SAS to the.
Rose Navarro HMI Lead Thermal Engineer
SVD Electronics Constraints
PID meeting SNATS to SCATS New front end design
Calorimeter Mu2e Development electronics Front-end Review
Mechanics for front-end Electronics Of T2K-II TPCs – A Few Conceptual Ideas D. Calvet, Irfu, CEA Saclay, Gif sur Yvette Cedex, FRANCE.
LumiCal mechanical design, integration with LDC and laser alignment
288 channel HE RBX? A conceptual exercise, NOT a proposal
FP420 Detector Cooling Thermal Considerations
Hawkeye Mechanical Design Snapshot
The 11T cryo-assembly: summary of design and integration aspects
Presentation transcript:

Corner Raft Conceptual Design Corner Raft Conceptual Design Kirk Arndt, Ian Shipsey Purdue University LSST Camera Workshop SLAC Sept , 2008

2 WFS FEE Board Package Science Raft Double Rail Board Pair 93mm36mm Corner Raft Single Rail Board Pair ~1/3 area of Science Raft FEE board Each board for a Wave Front Sensor is the same (206mm) length and ~1/3 the width of a board for the Science Rafts. The single rail has 1/2 the thermal contact with the cage, but 1/3 the heat load, compared to a Science Raft double rail board pair. A WFS FEE board pair has 2x51-pin low-profile Micro-D connectors (compared to 2x69-pin and 2x51-pin standard profile Micro-D connectors on a Science Raft board pair).

3 Guider SIDECAR ASIC Package from Don Figer, RIT SIDECAR ASIC interfaces directly to analog readout circuits Low power, high performance Integrated circuit contains microprocessor, bias generators, clocks, plus 36 input video channels, 36 parallel ADCs (12 bit /10 MHz, 16 bit /500 kHz) SIDECAR is being used for three JWST instruments (4 port readout, 11 mW) SIDECAR is key to Hubble Space Telescope ACS Repair – operates CCDs SIDECAR HST Package (3.5×3.5 cm) Does not show hermetically sealed lid over ASIC JWST Package (does not show protective package lid) Estimated 37mm x 15mm x 100mm size of JWST package is the size of the Guide sensor FEE clearance volumes in the CAD model shown in following slides

4 Corner Raft Tower in GRID – Summer mm 102 mm

5 Corner with new GRID and Raft hold-downs 17.0 mm 103 mm same spacing between cage and Grid bay walls as in Science Raft/Towers for new raft hold-downs

6 New Corner cage and FEE layout in GRID 5 mm Cage side “pushed out” here to fit 3 board pairs inside cage with minimum 5mm clearance in GRID Corner bays

7 end view of new Corner Raft/Tower Relative alignment of connections between sensor module, flex cable and FEE is the same in both Guide sensor locations Guider FEE in contact with corner posts fastened to cage walls for cooling Single Rail Board Pair for WFS Heat of WFS FEE conducted through single rail to cage wall Thermal straps to Corner Raft (cooling plate fastened to cage wall on hypotenuse side)

8 Triangular Tower fits inside GRID corner bays and mounts to Cryoplate WFS module Guide sensors V-block kinematic mounts based on Science Raft design Clearance volumes for Guider FEEs Single Rail Double Board for WFS FEE Cooling plate / thermal strap to Corner Raft Corner Raft Tower concept

9 Raft hold-downs (similar to new design for Science Rafts) Threaded holes for fastening to cryoplate Cage exterior details / Corner Raft hold downs

10 Corner Raft/Towers in GRID/Cryoplate A single Corner Raft-Tower design in all corners of GRID/Cryoplate  Corner Raft-Towers are interchangeable  Sensor, FEE and raft-hold-down orientation w.r.t. GRID/Cryoplate/Camera are rotated 4x 90 degrees

11 view through openings in Cryoplate

LSST Camera Systems Integration12 Items for Mechanical Development Assembly sequence Tool for insertion into the GRID (temporarily fastened to FEE cage) Mechanical analysis –Refine raft hold-down mechanism –Raft-to-Tower interface detail (prior to insertion into the GRID) Thermal analysis –Match delta T of science raft-to-cryoplate –Temperature stability – fluctuations due to varying power of Guider electronics? Accuracy/stability needed for sensors with respect to focal plane –Height location accuracy of each sensor compared to science focal plane? –Need for co-planarity of the 8 guide sensors? –X-Y-Theta position accuracy and stability? –Required offset from focal plane for WFS: +/- 1 mm or ? –Required parallelism of one split surface with respect to the other for WFS? –Required parallelism of each WFS with respect to the science focal plane? Electronics form factor and schematic –What FEE connectors are needed? Number of pins? –What FEE-to-BEE cables and cable folding scheme are needed? –How are Guider signals ganged in BE to reduce number of Cryostat feedthroughs needed

13 Backup slides

14 Draft Development schedule Task Start DateDurationSensors Conceptual mechanical design finalizedNov-08milestone Mechanical and Thermal analysisDec-083 months Sensor/Raft/Grid/Cryoplate interface definitions Feb-09milestone Mechanical prototype constructionMar-093 months Electrical grade componentsNov-087 months mini-OTA integration w/ mech prototype and testingMay-096 months 2nd version mechanical prototypeOct-096 months system integration and testingMay-106 months CCD from prototype order (unlikely), mOTA or engineering grade CCD, prototype CMOS Final version prototypeOct-106 months system integration and testingMay-116 months prototype WFS format CCD, prototype CMOS

15 Science Raft Tower Simplified Thermal Models Corner Raft Tower 1.1 W W 0.36 K/W 0.27 K/W 4.36 K/W 0.34 K/W + CMOS dissipation 0.12 K/W 1-D model (electrical analog) for first-order calculation of thermal gradients  Ignore lateral heat flows  Rn = bulk + interface thermal impedance of component  Tower cold mass = cooling plates + housing sidewalls  Strategy: make R4 dominant, keep R5 minimum  Makeup heater may be necessary to compensate for time variation of L3 and cryoplate temperatures, and for controlled warm-up