Thermal Integrity Testing of Drilled Shafts GMEC Conference April 30, 2009 Presented by: Gray Mullins, Ph.D., P.E.

Slides:



Advertisements
Similar presentations
Months of the year December January November October February
Advertisements

DOT 1 January , 1990 DOT 2 July 23 - August 3, 1990.
IMAGE RAILWAY CALENDAR 2015 IMAGE RAILWAY CALENDAR 2015 Photo by Ing. Ivan Nedeliak, PhD.®
X. X September Mo Tu We Th Fr Sa Su
Chubaka Producciones Presenta :.
2012 JANUARY Sun Mon Tue Wed Thu Fri Sat
Model Validation. -Air lock caused flow restriction, elevated temperatures -Excess energy lost to boiling and higher temperatures -Underperformed model.
January 2012 Monday Tuesday Wednesday Thursday Friday Sat/ Sun / /8 14/15 21/22 28/
P Pathophysiology Calendar. SundayMondayTuesdayWednesdayThursdayFridaySaturday January 2012.
Chicas, este calendario si es pa' nosotras !!!!!.
The Solar Resource. Overview Overview of the solar resource in the U.S. Features impacting solar irradiance »Latitude, cloud cover, seasonality Converting.
MONDAYTUESDAYWEDNESDAYTHURSDAYFRIDAYSAT/SUN Note: You can print this template to use as a wall calendar. You can also copy the slide for any month to add.
2007 Monthly Calendar You can print this template to use it as a wall calendar, or you can copy the page for any month to add it to your own presentation.
MONDAYTUESDAYWEDNESDAYTHURSDAYFRIDAYSAT/SUN Note: You can print this template to use as a wall calendar. You can also copy the slide for any month to add.

1 ISAT Module III: Building Energy Efficiency Topic 8: Thermal Performance Monitoring  Degree Days  Example of Degree days  Thermal Energy Consumption.
WORD JUMBLE. Months of the year Word in jumbled form e r r f b u y a Word in jumbled form e r r f b u y a february Click for the answer Next Question.
September 2008 SundayMondayTuesdayWednesdayThursdayFridaySaturday
DATE POWER 2 INCOME JANUARY 100member X 25.00P2, FEBRUARY 200member X 25.00P5, MARCH 400member X 25.00P10, APRIL 800member.
Calendar for 2011 Months of the Year with Holidays.
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
SunSatFriThursWedTuesMon January
TEMPORAL VISUALIZATION OF DATA FROM THE FRENCH SENTINEL NETWORK.
July 2007 SundayMondayTuesdayWednesdayThursdayFridaySaturday
Latest Developments in Equipment and QA/QC systems in Driven Pile and Drilled Shaft Systems By George Piscsalko, PE Pile Dynamics Inc.
Safety Department Fire Drills.
FY16 Budget Build (Banner)
Dictation practice 2nd Form Ms. Micaela-Ms. Verónica.
Thermal Integrity Profiling
McDonald’s Kalender 2009.
McDonald’s Kalender 2009.
JANUARY 2018 SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY
13-block rotation schedule
Technical Manual Index/Norwich Aero June 2013
1   1.テキストの入れ替え テキストを自由に入れ替えることができます。 フチなし全面印刷がおすすめです。 印刷のポイント.
January MON TUE WED THU FRI SAT SUN
January MON TUE WED THU FRI SAT SUN
2017/18 Payment Calendar Due Date Cut-off Day 1st of every month
The SAT will be given at ECHS on the dates below!
McDonald’s Kalender 2009.
January Sun Mon Tue Wed Thu Fri Sat
January MON TUE WED THU FRI SAT SUN
January MON TUE WED THU FRI SAT SUN
Problem Gambling Clicks to Opgr.org
2300 (11PM) September 21 Blue line is meridian..
January MON TUE WED THU FRI SAT SUN
SEASONS Khalatyan Nane Artschool The 4th grade.
McDonald’s calendar 2007.
1 - January - Sun Mon The Wed Thu Fri Sat
Teacher name August phone: Enter text here.
January MON TUE WED THU FRI SAT SUN
JANUARY 1 Sun Mon Tue Wed Thu Fri Sat
Circle Chart Template Process Name.
January MON TUE WED THU FRI SAT SUN
JANUARY 1 Sun Mon Tue Wed Thu Fri Sat
JANUARY 2018 SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY
The Transformation of A Small Company Into A Golden Legend
February 2007 Note: Source:.
| January Sunday Monday Tuesday Wednesday Thursday Friday
January MON TUE WED THU FRI SAT SUN
MONTHS OF THE YEAR January February April March June May July August
S M T W F S M T W F
JANUARY 1 Sun Mon Tue Wed Thu Fri Sat
McDonald’s calendar 2007.
1 January 2018 Sun Mon Tue Wed Thu Fri Sat
Habitat Changes and Fish Migration
January Monday Tuesday Wednesday Thursday Friday Saturday Sunday 30 31
2015 January February March April May June July August September
Habitat Changes and Fish Migration
Presentation transcript:

Thermal Integrity Testing of Drilled Shafts GMEC Conference April 30, 2009 Presented by: Gray Mullins, Ph.D., P.E.

Overview  Background  System Overview  New Modeling Developments Hydration energy parameters Soil temperature boundary conditions  Conclusions

1 - 4 & US 192 Why Test Shaft Integrity?

1 - 4 & SR 400 Why Test Shaft Integrity?

1 - 4 & SR 400 Why Test Shaft Integrity?

Thermal Integrity Testing System  Focused Infrared detectors (four per probe)  Depth encoded wheel  Computerized data acquisition  3-D Signal matching program

Depth encoder Data acquisition Access Tubes Lead Wire to Infrared Probe

Single Shaft Heat Signature

Loss of Cover Necking in the shafts shows as lower than normal temperature.

Loss of Cover

CSL DOES NOT SHOW LOSS OF COVER

3-D Image of Shaft underground with cover loss 2-D Thermograph of Shaft underground with cover loss

Sample Data

Over-pour / Bulging Excess concrete cover or bulging around the normal shaft shape shows as higher than normal temperature.

Model Results Measured Results Measured Modeled

Cage Misalignment An un-centered cage provides more cover on one side and less on the other. This shows as higher or lower than normal temperature as discussed earlier.

Cage Alignment

This part gets technical not for some audiences  We are good at predicting shaft shape underground due to very accurate concrete energy models  The next several slide discuss how energy is computed so we know how hot or cold a normal shaft should be.

Modeling Energy Production Cementitious composition Flyash composition Total cementitious concent Water cement ratio

Hydration Energy (Schindler, 2005) Cement Energy Production Total Energy Production

Hydration Energy (Schindler, 2005) Degree of Hydration Rate of Energy Production

Input Parameters (available from concrete supplier)

Good Models Tell us what normal temperature should be Cast Shaft Test Shaft 28 hrs after casting Shaft Size 42 inches Normal shaft temp = 124F

Ground Temperature Modeling MUST KNOW ORIGINAL GROUND TEMP Ground temperature not constant with depth Dependent on soil type, time of day, day of year, previous daily air temperature Long duration modeling used to condition the soil temperature boundary conditions

Historical Air Temperature (soil conditioning) Test Date

Daily Air Temperature (time of casting to testing) Time of Casting Time of Testing

February ‘08

March ‘08

April ‘08

May ‘08

June ‘08

July ‘08

September ’08 (hottest)

September ‘08

October ‘08

November ’08 (early)

November ’08 (cold snap)

December ‘08

January ‘09

Manual Soil Temperature Measurements Provide Model Calibration / Verification Cold Shaft Testing (4 year old test shaft) Modeled

Conclusions  Infra-red Thermal Integrity testing shows remarkable capability to detect anomalies outside the reinforcing cage (bulges, necks,) as well as misaligned cages  Advances in modeling energy production and soil temperature increase resolution of anomaly predictions.

Home About FGE Services Projects Contact 712 East Alsobrook Street, Suite 3 Plant City, FL Office: (813) Fax: (813) Infrared Integrity Services available at