Copyright © 2009 First Steps Training & Development, Inc. All rights reserved. Copyright © 2008 First Steps Training & Development, Inc. All rights reserved.

Slides:



Advertisements
Similar presentations
Get ready! New-gTLD Preparedness Project Thoughts August, 2013 © Mikey OConnor (just attribution is fine) version 0.3.
Advertisements

Health & Safety Life Book AM ST p. 1 v.01 - Nov. 03, 2011 Isolation Lockout; protect employees during e.g. maintenance and jam clearing! Machine.
Job Hazard Analysis I. Speaker’s Notes:
Museum Presentation Intermuseum Conservation Association.
Airbus Production System
Factory Objectives Value of Asset Management Strategies.
Engineering Diploma Level 2 Unit 7 Application of Maintenance Techniques in Engineering In this unit you will get involved with both maintenance procedures.
MIGRATION MIGR-09. How to Run Your Next Implementation... Don't Let It Run You! Patricia Johnson Senior Systems Consultant Strategic Systems Group, Inc.
COST OF POOR QUALITY Calculating the cost of poor quality allows an organization to determine the extent to which organizational resources are used for.
Copyright © 2009 First Steps Training & Development, Inc. All rights reserved. Copyright © 2008 First Steps Training & Development, Inc. All rights reserved.
Copyright © 2009 First Steps Training & Development, Inc. All rights reserved. Copyright © 2008 First Steps Training & Development, Inc. All rights reserved.
Copyright © 2008 First Steps Training & Development, Inc. All rights reserved. 1 1 Effective Team Leadership Appropriately Involving Team Members in Decision.
Job Hazard Analysis. © Business & Legal Reports, Inc Session Objectives Identify the purpose of JHA Recognize the benefits of JHA Understand the.
Pre-quiz: Test Your Knowledge
Copyright © 2009 First Steps Training & Development, Inc. All rights reserved. Copyright © 2008 First Steps Training & Development, Inc. All rights reserved.
Copyright © 2009 First Steps Training & Development, Inc. All rights reserved. Copyright © 2008 First Steps Training & Development, Inc. All rights reserved.
Chapter 10 Schedule Your Schedule. Copyright 2004 by Pearson Education, Inc. Identifying And Scheduling Tasks The schedule from the Software Development.
1 Ergonomics for Fire and EMS Departments Developing & Implementing Ergonomic Solutions University of Oregon Labor Education and Research Center This material.
J-1 Next Steps Jordan Dentz. J-2 Assignments 1. Establish core continuous improvement team (April 21) 2. Current state value stream map (draft April 28;
Accident Prevention Programs What Will We Talk About? What is an accident? What is an accident prevention program? Basic elements of a program Where.
Copyright © 2009 First Steps Training & Development, Inc. All rights reserved. Copyright © 2008 First Steps Training & Development, Inc. All rights reserved.
Copyright – Disaster Resistant Communities Group - How To Conduct A Fire Drill.
IT Technical Support Policies and Procedures South Nottingham College.
Irwin/McGraw-Hill 16-1 Chapter 16 Planning and Running Effective Meetings.
109 Civil Engineer Support Equipment SEABEE COMBAT WARFARE NCF OFFICER SPECIFIC.
Quality Management System
Diabetes Prevention Group DPP Curriculum Core Elements: Update July 2005.
Project Management Presented by:
 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall Chapter 15 Implementing and Validating the Quality System.
Welcome to… Planning for Emergencies – For Small Business –
Office of Safety / Loss Control Mgt.
Freeleansite.com The Lean Enterprise Accountability Meeting Lean Foundations Continuous Improvement Training Lean Foundations Continuous Improvement Training.
Occupational Health and Safety
Module 3 Develop the Plan Planning for Emergencies – For Small Business –
From Research Prototype to Production
Group members | sakeriye Hujale Hani Abbas Mohamed Madi Hamse Ibrahim Title Hardware Risk and Recovery ABOUT US.
End HomeWelcome! The Software Development Process.
Implementation of information system. Implementation in system’s lifecycle It can be done after the system is designed, It is one of the most difficult.
Copyright © 2008 First Steps Training & Development, Inc. All rights reserved. 11 Performance Systems Analysis Presented by:
Copyright © 2009 First Steps Training & Development, Inc. All rights reserved. 1 Performance FeedBack Performance Compliance.
Leadership Workshop. Workshop 1999 Leap Technologies, Inc Welcome to the Action Workout Leadership Workshop! Our Purpose To provide sponsor managers and.
©Copyright SafetyInstruction.com 2006 RADIATION - SLIDE 1 OF 63 WELCOME PROGRAM MANAGEMENT OCCUPATIONAL RADIATION PROTECTION CORPORATE SAFETY TRAINING.
Risk Assessment Soft Skills Programme Nexus Alliance Ltd.
Copyright  Business & Legal Reports, Inc. BLR’s Safety Training Presentations Job Hazard Analysis.
Copyright © 2008 First Steps Training & Development, Inc. All rights reserved. Performance Conversations Presented by:
Glen Fields - Final Project Presentation. What Sets CSI Apart... GBA 573 Consultants Company Background Located in San Diego, CA 5 Engineering Consultants.
Concepts of Engineering and Technology Class Officer Elections Class Officer Elections Copyright © Texas Education Agency, All rights reserved.
Division of Risk Management State of Florida Loss Prevention Program.
The Perfect Property Closeout
Copyright © 2009 First Steps Training & Development, Inc. All rights reserved. 11 Adult Learning Systematic Learning.
Cloud Contact Center Software Kickoff and Discovery Meeting For Date.
Copyright © 2009 First Steps Training and Development. All rights reserved. 1 Performance FeedBack Performance Coaching.
Copyright © 2008 First Steps Training & Development, Inc. All rights reserved. Coaching for Results Confrontation Skills Presented by:
Presentation for: 2011 FIMS/Real Estate Workshop Prepared by: Gayle Smith, DOE Headquarters (EES) Facilities Information Management System FY11 Year-End.
TIME MANAGEMENT BY GABRIELLE KELENYI FULBRIGHT ETA 2014.
Introduction to OEE (Overall Equipment Effectiveness)
NUMI MINOS MINOS Far Detector Installation & Commissioning Jeff Nelson MNHEP DoE Visit September, 2002.
Linac2 and Linac3 D. Küchler for the linac team. Planning first preparative meeting for the start-up of Linac2 in June 2013 –this early kick-off useful.
Class # Triage © Copyright 2006 JSL Communications LLC Triage.
SEM A - Operations Develop production schedules for events Schedule tournaments.
Introducing…. Zafety Lug Lock® Wheel Nut Security System
Maintenance Scheduling
Hub Management: Twelve Months of BEST
Small Sites Planning & Scheduling
Industrial Assessment Center Database
Fast Track Modifications Keith Reinsmith PPL Susquehanna
Lesson 3 Consumer Science
When should root cause analysis be performed?
SEIU Local 1000: Improving Results through Better Project Management
Copyright © 2004 The McGraw-Hill Companies, Inc. All rights reserved.
Presentation transcript:

Copyright © 2009 First Steps Training & Development, Inc. All rights reserved. Copyright © 2008 First Steps Training & Development, Inc. All rights reserved. Trouble Shooting Logic Status Assessment Presented by:

2 Copyright © 2009 First Steps Training & Development, Inc. All rights reserved. 2 Status Assessment Purpose : manage complex issues Core Steps :  Identify Issues  Gather available information / Identify Manageable Elements  Set Priority: examine Impact and Timing / Establish Priority Order  Plan Solution: determine approach & participation required  Track Disposition

33 Status Assessment Purpose : manage complex issues Core Steps :  Identify Issues  Gather available information / Identify Manageable Elements  Set Priority: examine Impact and Timing / Establish Priority Order  Plan Solution: determine approach & participation required  Track Disposition Copyright © 2009 First Steps Training & Development, Inc. All rights reserved.

44 Status Assessment Purpose : manage complex issues Core Steps :  Identify Issues  Gather available information / Identify Manageable Elements  Set Priority: examine Impact and Timing / Establish Priority Order  Plan Solution: determine approach & participation required  Track Disposition Copyright © 2009 First Steps Training & Development, Inc. All rights reserved.

55 Set Priority Identify Issues Identify Manageable Elements ImpactHMLHML TimingHMLHML P ri o ri t y O r d e r Determine Approach Plan ParticipationTrack Disposition Scrap on Line Pair 11 & 12 Capper Jams on Line 11Line efficiency down to 84%, high rework cost MNeed 95% efficiency by June 8 to meet orders H 4 Need to know why, do a DA Need input from Operators, Maintenance, Engineering and Supplier Set up conference call today at 4:00 PM Missed labels on 100 tablet bottle, Line 12 Minimal rework, labels missing on.0037% of bottles LStable, under controlL Drop from list Low count on 100 tablet bottle Line % of bottles, count is 99 to 97, possible fines HMachine certification due on 1 August M 5 B Team has Most Likely Cause. Will try fix tonight B Team, Maintenance Check results with B Team tomorrow by 08:30 Misplaced labels on 250 tablet bottle, Line 12 Excessive rework, labels missing on 0.9% of bottles LIs getting worse rapidlyH 7 Need to know why, do a DA Need input from Operators, Team Leaders and Maintenance Install Unit Load Former (ULF) Line 12 Prepare Line 12 area for ULF Will cause further backlog of orders, possible sale loss MWill require 2 Shifts of down time 15 June M 6 Mostly tasks. Do a verbal PIA with Conversion Team Conversion Team, Northington Maintenance and Engineering Train Line 12 Teams on use of ULF ULF is unique to Newton, no manuals available MTeams must be ready to use 16 June 5:00 AM M 8 Get ULF supplier to provide manuals & training Supplier, Team Leaders Move ULF from Northington and install Part of Northington’s PIA__Provide input to Northington DOIT Conversion Team, Engineering Team Leaders DOIT at scheduled PIA session next Tuesday at 10:00 Choose replacement for retiring Team Coach Many new team members need coaches support MNeed new coach trained and in place by 1 Oct. L 9 CA on both new coach and training track Personnel with input from Team Leaders Safety Issues5 near misses last week in the department RI up to 0.9 worst in the company for last 10 years HCorporate Mandate: Get to 0.5 RI IN 90 days H 3 Do multi-cause analysisSafety Committee, people who had near miss Some lock-outs on Line 11 hang up Potential for serious injury or major equipment damage HPM to start tomorrow at 05:00 AM H 2 Need to know why, do a DA Need input from Operators, Maintenance, Engineering and the possibly the Supplier Emergency shut-down break on line 11 slips Potential for serious injury Can only run at ½ speed until it is fixed. HWill have to short ship orders in 3 days if not fixed H 1 Brake band hit by fork truck, needs replacing Maintenance to install when new band arrive. Supplier to hand carry band to us today Status Assessment - A Reality Based Technology to Sort and Prioritize Issues Status Assessment for: Line Pair 11 & 12 Name: Pat Leader Date: 1 June Copyright © 2009 First Steps Training & Development, Inc. All rights reserved.

For more information, or to schedule a workshop, contact: Toll Free: (800) Trouble Shooting Logic Status Assessment