October 28 th 2011 IRC - Codes Report. 2 Codes Update Outline –Code Development Update –Project Updates Policy-Related Activities (Executive Committee)

Slides:



Advertisements
Similar presentations
Manitoba Energy Code for Buildings 2013
Advertisements

FCIA CODE EFFORTS FCIA Spring Conference 2003 By William E. Koffel, P.E. Koffel Associates, Inc.
PERMITS & INSPECTIONS DEPARTMENT 2003 INTERNATIONAL RESIDENTIAL CODE IRC.
Endorsement advice progress report Accounting Regulatory Committee 23 March 2015.
Pipeline Personnel Qualification
C A L I F O R N I A E N E R G Y C O M M I S S I O N Cool Roofs in California’s Title 24 Building Energy Efficiency Code 2005 Update and 2008 Preview CRRC.
May 27 th 2011 IRC - Codes Report Energy Efficiency in Housing and Small Buildings.
Energy Rating Index Performance Path Speaker Name Speaker Affiliation.
Economic Criteria for Transmission Planning in the ERCOT Region Public Utility Law Seminar DeAnn Walker August 3, 2012.
Building Australia’s Future Energy Efficiency Introductory Awareness Training AUSTRALIAN Greenhouse Office Supported by: Step by Step Application of BCA.
Stakeholder Information Update Edmonton-Calgary 500 kV Transmission Development December 14, 2005 Introduction Neil Millar, vice-president, Transmission.
Prof. David Strong, Chief Executive, Inbuilt Ltd. Good Homes Alliance Christmas Event, The Princes Foundation 9 th December 2009 SAP, Building Regulations.
Free Software for Energy Code Compliance Free Software for Energy Code Compliance Presented By: Mustafa Abdul Geleel Hussien By: Evan H. Shu, FAIA Web.
80 years of excellence Commercial Buildings Tax Deduction Ed Gray Director, Energy Infrastructure National Electrical Manufacturers Association.
Planning Department – Building and Safety Adoption of the 2010 California Code of Regulations Presented By: Building and Safety & Fire Prevention.
Copyright 2008, International Code Council 2012 IECC ® for SERBCA Based on the 2012 International Energy Conservation Code.
Gtr for Tyres: Update (of last WP ) March 2009 Informal document No. WP (147th WP.29, March 2009, agenda item 16.9.)
1. Construction/Safety Standards for Small Craft Webinar Presentation January 2014 Transport Canada Associate Assistant Deputy Minister Safety and Security.
BUILDING REGULATIONS Update Welsh Government CHC Technical Services Forum 26 September 2014 Francois Samuel Building Regulations Welsh Government.
Approximation of legislation to the internal market acquis An EU funded project managed by European Agency for Reconstruction Directive 89/106/EEC on Construction.
Residential Weatherization and Ventilation Subcommittee Presentation to the Regional Technical Forum August 30, 2011.
Water Supply Planning Initiative State Water Commission November 22, 2004.
Update on Current EGNRET Projects APEC EGNRET 23 Meeting Christchurch, New Zealand ~ November 10-12, 2004 Jean Ku National Renewable Energy Lab, USA Cary.
HUMAN SETTLEMENTS PORTFOLIO COMMITTEE MORTGAGE DEFAULT INSURANCE COMPANY (MDIC) UPDATE MARCH 2013.
Attending the ICC Conference in Detroit this September or know someone who is?
RTF Staff, Subcommittee and Work Updates November 1, 2011.
Planning and Community Development Department Housing Element City Council February 03, 2014.
NRC-IRC Canadian Codes Centre Report Frank Lohmann TRC Spring Meeting March 3 rd, 2010.
Earned Value Management Update Nancy L. Spruill Director, Acquisition Resources and Analysis Office of the Under Secretary of Defense (Acquisition, Technology.
Compliance – Three Options 1. Prescriptive Approach 2. Performance Approach 3. Simple Trade-Off Method (STOM) Section 9.36 of the NBC.
The 2012 IECC A Rare Opportunity for Major Energy Savings Add AIA.
Wales Building Regulations 2013 Part L Existing non-domestic buildings September 2012.
1. Marine Transportation Security Regulations Work Plan Webinar presentation January 2014 Transport Canada Donald Roussel
Icfi.com © 2006 ICF International. All rights reserved. Wyoming Collector and Transmission System Project – Status Report Presented to: Wyoming Infrastructure.
Joint Electric Scheduling Subcommittee Update April 29, 2014.
1 Automotive industry Reducing Noise Emissions from Motor Vehicles: New EU Commission legislative proposal World Forum on Vehicle Regulations (WP.29) 156.
R E T I Coordinating Committee California’s Renewable Energy Transmission Initiative: Status Update California Public Utilities Commission California Energy.
Earned Value Management Update Nancy L. Spruill Director, Acquisition Resources and Analysis Office of the Under Secretary of Defense (Acquisition, Technology.
Joint Electric Scheduling Subcommittee Update February 18, 2014.
WG or TG # SC17 Liaison Report Mohsen Shavandi / Virgilio Garcia Soulé SC17 Liaisons Update from SC18 Summer 2013 Meeting January 2014.
API 17N (and Q) Subsea Production System Reliability, Integrity, and Technical Risk Management.
FINAL CLEAN POWER PLAN Before the Virginia Energy Efficiency Council Virginia Department of Environmental Quality November 12, 2015.
1 TAC Report to the ERCOT Board February 16, 2005.
Protocol Revision Subcommittee Report to ERCOT Technical Advisory Committee December 5, 2002.
Applying SEEM Updates, Calibration, and Measure Interaction Decisions to: Manufactured Homes Weatherization UES Measures Regional Technical Forum December.
Establishing the Independent System & Market Operator. (ISMO) 30 January 2013.
George Zhou, VGITF Chair October 14, 2015 Salt Lake City, Utah Variable Generation Interconnection Task Force Update to PCC.
Joint BPS and ESS/ITS ATC/AFC Subcommittee Update November 2007 – January 2008 February 5, 2008.
Idaho and Montana Residential Single Family New Construction Measures Mohit Singh-Chhabra Regional Technical Forum October 20 th, 2015.
Work Related to Senate Bill 2202 (effective January 1, 2001)
NRC-IRC Canadian Codes Centre Report Frank Lohmann Technical Research Committee May 28 th, 2010.
Transition Plan Network Operations Model Change Requests 5/26/2010.
Oregon’s ‘Optional’ Reach Code Gabrielle Schiffer State of Oregon Building Codes Division January 10, 2013.
City of San Mateo 2016 Reach Code
Building Code – Update on Residential Sprinklers Amendment
Truss Heel Heights and Energy Code Requirements
2015 NSBOA code updates Part 9 and Part 3.
New Comprehensive Zoning By-law December 12, 2016.
Prepared by Frank Cooney B.Arch MRIA
Grid Code Review Panel 16th August 2017
July 13, 2016 Department of Environmental Quality Proposed Amendments to UST Rules 15A NCAC 02N and 02O Ruth Strauss.
doc.: IEEE <doc#>
doc.: IEEE <doc#>
Julie Woosley, Division of Waste Management
OPTN/UNOS Thoracic Organ Transplantation Committee
January Opening Report
January Opening Report
Julie Woosley, Division of Waste Management
DOER recommendations for BBRS
NZEB Dwellings and Major Renovations
Presentation transcript:

October 28 th 2011 IRC - Codes Report

2 Codes Update Outline –Code Development Update –Project Updates Policy-Related Activities (Executive Committee) Part 9 related work –Joint Tasks with Other Committees –Energy efficiency in Housing and Small Buildings –Upcoming Meetings – Schedule

3 Code Development Update Publication Dates –NECB is being published – November 18 th, 2011 –Publication alignment for 2015 codes under discussion First Public Review towards 2015 NBC, NFC, NPC –Right Now – –October 24 th to December 16 –1 Part 9 Interim change: Reference ASTM Nailing Standard –1 Part 9 change: Anchorage requirement held back Public Review on Energy Delayed –January 9 th to February 24 th 2012

4 Policy–Related Activities Currently Active Tasks –New Objective – Water-Use Efficiency (TG Scoping) –Renewal of the Farm Building Code (TG Scoping) –Sprinklers, Stairs, Guards, Fire Performance of Houses –Removal of an Objective Activities about to get underway … –Energy Target for the NECB (CCBFC ballot to approve task) –TG on Review of the Code Development System –TG on Harmonization (Provincial-National) –TG on Impact Analysis (Phase 2)

5 Policy–Related Activities Sprinklers –Request: EC asks SCHSB and SCFP for assistance to inform policy considerations –Approach: Joint HSB/FP Task Group TG Mandate: Review cost/benefit data & asses technical merit TG Status: SC review and approval of Terms of Reference Step Dimensions (7”-11”) –Request: EC asks SCHSB and SCUE for assistance to inform policy considerations –Approach:Subtask group of existing Joint Task Group on Stairs sTG Mandate:Review of benefit studies & Developing cost impact sTG Status: SC review and approval of Terms of Reference

6 Policy–Related Activities Climbable Guards –Direction: EC will communicate CCBFC concerns to Standing Committees EC will clarify that new code change request can be considered Fire Performance of Houses –Direction: EC will ask SCHSB for assistance (with help from FP) to inform policy considerations Assess impact of research findings on current code & objectives –Approach: HSB TG with expertise from FP Mid-Rise Construction (not Part 9)

7 Part 9 Work Joint Tasks with Other Committees (ES – Part 5) –EIFS Progress: reviewed standards (4 meetings) Next meeting: January 19 th 2012 Approach: –reference S716.1, 2 and 3 standards in a separate Subsection in 9.27 –Add rainscreen-EIFS as acceptable option in Outstanding work: –review , and for conflicts –cross-references to »9.25. – vented cavity »9.10. – foamed plastics » – lateral bracing

8 Part 9 Work Joint Tasks with Other Committees (ES – Part 5) –Sound Transmission between Dwelling Units Progress: 3 meetings Next Meeting: January 2012 Approach Flanking noise will be addressed by –Existing Sound and fire Tables –additional information in tables

9 Part 9 Work Joint Tasks with Other Committees (ES – Part 5) –Roofing, Waterproofing, Dampproofing Standards Progress: Developed code language to replace application standards - SCES rejected approach Next meeting: January 2012 Approach: –Replace material standards –Find ASTM/International equivalents for application standards Outstanding work: –Identify and review potential standards

10 Part 9 Work – Energy Efficiency Executive Committee – Guidance –Overall Cost-benefit Calculations: Whole house analysis – YES Simple Payback – NO Value Index – NO Incremental Construction ($) & Energy Benefit ($) –Division C – reporting requirements Compliance Report required Compliance Report can be generated by HOT2000 “check-list” like approach –Development of Public Consultation Document

11 Part 9 Work – Energy Efficiency New subjects or significant revisions –Changes to Application

12 Part 9 Work – Energy Efficiency New subjects or significant revisions –Changes to attic requirements? –Site-built windows ? –HVAC duct alternative ! –Simple Trade-Off Examples ! –Simple Trade Off Limits ? Opaque-to-Opaque option –Difficulties to characterize attic spaces (roof shapes, styles) –Limits may have to be introduced (vertical/vertical only, certain minimum geometries) Transparent-to-Transparent –Limit on solar heat gain coefficient –maximum allowable increase of U-value

13 Part 9 Work – Energy Efficiency Changes to attic requirements –Intent to avoid requiring high heel trusses –Modeling done without high heel trusses –Currently proposed Slope not more than 1200mm projection Perimeter at least at Wall R-value –Current Practice Slopes 5/12 to 7-12 are most common 30% - 40% of truss designs already comply Mostly affects low slopes –New Proposal (to be discussed) Regulate truss minimum heel height?

14 Part 9 Work – Energy Efficiency Site-built windows –Introducing prescriptive alternative –To be discussed ConstructionMax. U Req’d U For climate zones 4 and 5: Non-metallic frames + triple glazing, 12.7 mm spacer double glazing, 1 low-e (e ≤ 0.10), argon, non-metallic spacer 2.02 For climate zones 6 and 7a: Non-metallic frames + triple glazing, 12.7 mm spacer, argon, 1 low-e (e ≤ 0.20) triple glazing, 12.7 mm spacer, 2 low-e (e ≤ 0.20) 1.74 For climate zones 7b and 8: Non-metallic frames + triple glazing, 12.7 mm spacer, 2 low-e (e ≤ 0.10) triple glazing, 12.7 mm spacer, argon, 2 low-e (e ≤ 0.20) 1.57

15 Upcoming Meetings – Schedule Standing Committee on Housing and Small Buildings –November – Vancouver – Part 9 Energy Efficiency –February 2012 – Ottawa – Non-energy subjects –April/May 2012 – Ottawa – Part 9 Energy Efficiency Standing Committee on Energy Efficiency in Buildings –November 9-10 – Ottawa – Part 9 Energy Efficiency sTG – Code Consolidation (EEHSB) –March 2012 – Ottawa – Review of Public Review Comments Commission on Building and Fire Codes –July 2012 – TBD – Approval of Part 9 Energy Efficiency