Preliminary Design Review Seizure Monitor Senior Design Project P06210 Alexey Chernyakov (EE), Piyanant Siridej (EE) Eric Smith (ME), Zac Levine (ME),

Slides:



Advertisements
Similar presentations
Handheld Wireless GPS Tracking Device Senior Design EEL 4914C : UWF, Fall 2006.
Advertisements

Project leader: Benjamin Danziger, EE Todd Bentley, ISE Jim Corcoran, CE Jay Radhakrishnan, EE Peter Drexel, EE Vianna Mullar, EE.
HELMET TRACKING SYSTEM (HTS) Group 8 Andrés F. Suárez (EE) Brian Maldonado (EE) Rígel Jiménez (EE)
Case Tools Trisha Cummings. Our Definition of CASE  CASE is the use of computer-based support in the software development process.  A CASE tool is a.
Data Acquisition Concepts Data Translation, Inc. Basics of Data Acquisition.
Team RopeIt Melanie Davis, Marissa Eppes, Zach Firth, Chris Hazel, Andrew Singles, Christine Wilkerson CategoryMetrics Functionality Feedback Time Accuracy.
A Project Team Members: Shamlan AlbaharRifaah Alkhamis Doug BloomquistChris Deboer.
Multidisciplinary Engineering Senior Design Project 6508 Controls Lab Interface Improvement Preliminary Design Review 11/11/05 Team Members: Michael Abbott,
Multidisciplinary Engineering Senior Design Automated Plasma Generator Test System Preliminary Design Review 11/11/05 Project Sponsor: MKS, ENI Incorporated.
Parkinson’s patient & physician aiding system Performed by: Alexander Kinko Stanislav Shapiro Barukh Trabelsi Instructor: Boaz Mizrachi Part A Final &
Wireless Sensor Network. A wireless sensor network (WSN) is a wireless network consisting of spatially distributed autonomous devices using sensors to.
Team Impact Intelligent Helmet Impact System Preliminary Design Review January 29 th, 2008 Amanda Brodbeck Wei-Chu Liao Wei-Shen Liao Chris Mintle.
Apnea Response System University of Hartford Senior Design Project M. Shalane Regan Diane Eager Michael Porter 4/10/2007.
Multidisciplinary Engineering Senior Design Project Self-Triggered Tempo Meter Preliminary Design Review 02/24/06 Team Members: John Gifford (EE)
Data Logging GCSE ICT. Learning Intentions: To explore the tern data logging. To explore the concept of analogue and digital data and the need for conversion.
The objective of this project was to design a dynamic similarity test rig to replicate the operating conditions of the main crank bearing in the Dresser-Rand.
Autonomous Control of Scalextric Slot Car on User-Defined Track Siddharth Kamath Souma Mondal Dhaval Patel School of Electrical and Computer Engineering.
Baby Monitor Application Submitted by: John Sims Alan Slutter Frankie Williams.
P13071 – Non-Invasive Blood Glucose Monitor Team Members Jared Bold Yongjie Cao John Louma Andrew Rosen Dan Sinkiewicz Faculty Advisor Professor George.
CMS:Children Monitoring System By: Naif Almadhayan | Steven Smith | Mohammad Safar.
HEALTH MATE HEALTH MATE Wireless Health Monitoring System.
Stand-Alone and Mesh Networks of Dissolved Oxygen (DO) Monitors Sd-May11-20 Betty Nguyen Scott Mertz David Hansen Ashley Polkinghorn Advisors Joseph Shinar.
Infant Respiratory Rate Monitor Group 11 Sean Ermer Tim Lau Leo Li Mentor: Dr. Daniel Moran.
Optical Heart Monitor/Jump Drive Sponsor: Calit2 Mentor: Paul Blair Ph.D. Team: Matt Chandrangsu, Jeffrey Chi, Kari Nip ECE 191 – Group 6 Fall 2008.
Wireless Sensor Monitoring Group Members: Daniel Eke (COMPE) Brian Reilly (ECE) Steven Shih (ECE) Sponsored by:
Wearable Sensors Final Presentation Problem Background Inferred Transmission (short range) Bulky Design, hard to wear 20 Samples per second.
Melvin Rivera Suárez Project Manager Alexis Ortiz Pérez Rafael Vega Díaz Wilfredo Bermúdez Soto.
Flatiron Mobile Device Security Monitor Thomas Horacek Lucas Greve.
1 Department of Electrical and Computer Engineering Advisor: Professor Hollot Team RCA March 1, 2013 Cumulative Design Review.
Traumatic Brain Injury Eyewear “TB-Eye” Todd Biesiadecki, Matthew Campbell, Matthew Vildzius ECE4007 L03 EM1 Advisor: Erick Maxwell December 14, 2011.
CIS-325: Data Communications1 CIS-325 Data Communications Dr. L. G. Williams, Instructor.
 Adviser : Dr. Lei Ying  Research Assistant: Ming Ouyang  Team Members:  Prashanth Yanamandra  Wyatt Brenneman  Taylor McKechnie  Client: ECpE.
TEAM MEMBERS: STAN WEED (TEAM LEADER), PAVEL KUZNETSOV, ERIC-THOMAS ARROYO PROJECT ADVISORS: DR. JOHN R. LACOURSE, PROF. FRANCIS C. HLUDIK Wireless Activity.
Wireless Test Instrumentation System for Rotating Parts ECE Team 167 Lawrence Bogan Jeremy Neaton Adam Bienkowski Michael Golob ME Team 29 Sean Handahl.
Brett Dunscomb David Howden Kevin Bedrossian Chris Clary.
Programmable Biofeedback Chest Exerciser Eileen Bock, Lauren Cassell, Margaret Gipson, Laurie McAlexander Department of Biomedical Engineering, Vanderbilt.
Aerospace Digital Communication Instrument Senior Design 1 Presentation.
Traumatic Brain Injury Eyewear “TB-Eye” Todd Biesiadecki, Matthew Campbell, Matthew Vildzius ECE4007 L03 EM1 Advisor: Erick Maxwell October 31, 2011.
Safety Motion Detector Final Presentation Senior Design I December 1, 2011.
The Smart/Safe Car Seat SENIOR DESIGN I FINAL PRESENTATION.
Path The purpose of this project is to design a universal data recording device to monitor the health of a Dresser-Rand compressor during operation. In.
Midterm Presentation Senior Design II February 28, 2012.
Optical Encoder for a Game Steering Wheel May05-26 Client: Thomas Enterprises Advisors: Dr. James Davis Dr. Douglas Jacobson Team Members: Sam Dahlke,
Dual-Use Wideband Microphone System
Sensor testing and validation plans for Phase-1 and Ultimate IPHC_HFT 06/15/ LG1.
Presented by Team 5 Xue Cheng Samuel Falabi Charlie Nguyen Richard Szink Lanea Williamson.
Design Constraint Presentation Team 5: Sports Telemetry Device.
Introduction ProjectRequirements Project Requirements In a previous senior design project, a wireless front-end was added to Iowa State University’s Teradyne.
Smoke Notification System (SNS) Final Presentation Senior Design 1 April 18, 2013.
EE/CpE 180 Final Project Presentation Team 20 Child Locator Team Members Richard Bevins Jeremy Day Joshua Day Israel Hall Gary Shives.
Abstract Keeping multiple children safe and accounted for can be a daunting task. When someone loses track of a child, even for a little while, anxiety.
Final Presentation Glass Break Detection Team
BANDAGE SIZE NON ECG HEART RATE MONITOR USING ZIGBEE WIRELESS LINK Guided by,Presented by, Ms. Geo. P.G Jeevan.K.Noble Asst.Prof., ECE Dept.S7, ECE-A.
Group #15 Matt Frank Russell Geschrey.  This project was chosen because of an interest in wireless communication systems, namely BAN's (body area networks)
EDGE™ Final Project Plan Presentation P09001 – RFID Reader & Active Tag Philip Davenport (Industrial and Systems Engineering)
SmartCup – Team 42 Harington Lee, Chirag Patil, Arjun Sharma 1.
Boeing NFC Part and Process Tracking System Team 41 Alper Olcay – Vigneshwar Karthikeyan – Jinjoo Nam.
SIDS Alert Device BY ERIC BAGNARD JT HIRSIG. Overview Background SIDS stands for Sudden Infant Death Syndrome One of the leading causes of death for infants.
Walking Stick With Heart Attack Detection
TRANSMISSION LINE MULTIPLE FAULT DETECTION AND INDICATION TO EB
1 Summary Lecture: Part 1 Sensor Readout Electronics and Data Conversion Discovering Sensor Networks: Applications in Structural Health Monitoring.
PRESENTATION CSE 341 MICROPROCESSOR Presented By Nabid Kaisar
Fall 2006P7305: Freshman Practicum AM Receiver P7305: Learning Module for EE Freshman Practicum Chris Urban: Lead Engineer Hans-Christian Rotmann: Project.
SOAREX VII Mission Design, construct, test, and fly an ultralight (
Wireless Sensor Networks in Healthcare
Microcontroller Enhancement Design Project
TEAM 2 – FALL 2006 PRESENTATION 1 LPM: Ahmad Omari.
CMS:Children Monitoring System
ULTRASONIC DISTANCE METER USING 8051
Image Acquisition and Processing of Remotely Sensed Data
Presentation transcript:

Preliminary Design Review Seizure Monitor Senior Design Project P06210 Alexey Chernyakov (EE), Piyanant Siridej (EE) Eric Smith (ME), Zac Levine (ME),

Agenda Description of the Process  Request  Requirement  Specification  Design Description of the Design  Drawing  Block Diagram  Circuit Schematics  Flow Chart  Bill of Materials Description of the Implementation Plan  Implementation  Testing  Evaluation

Process - Request The initial written customer request- The parent would like a device that could detect the rhythmic motion their child exhibits during a seizure and set off an audible alarm to alert the night nurse or wake the parents themselves. During the meeting with the customer, the situation was further clarified-  Exhibits generalized tonic-clonic (GTC) seizures  Seizure detection needs to occur in less than three minutes After researching GTC seizures, two candidate seizure symptoms were identified-  Abnormal motion, detectable by an accelerometer  Increased heart rate, detectable by a heart rate monitor Dr. Berg, the director of the Strong Epilepsy Center, gave further design considerations-  A motion based system could be used to detect multiple types of seizures  To detect multiple types of seizures, multiple detection units are needed  A library of seizure data could be formed, leading to a robust detection algorithm

Process – Request (Continued) As our project involves not only our customers child, but also patients at Strong Memorial Hospital, further documentation is required-  A patient consent form to explain the risks and benefits  Health Insurance Portability and Accountability Act (HIPAA) certification to insure patient confidentiality and safety  A testing protocol for University of Rochester’s and RIT’s internal review boards (IRB)s Since a robust multi-unit, multi-seizure type detection unit is beyond the scope and time constraints of our original design project, the project was divided into several development phases- I. Develop an accelerometer based worn unit that can wirelessly transmit seizure data. The data will be sent and stored in the base unit. II. Acquire a library of seizure data. Then use this library to develop a seizure detection algorithm for each seizure type. III. Develop a base unit that can implement the seizure detection algorithms and alert a guardian in case of seizure activity.

Process - Requirements 1. Seizure monitoring system during sleep time. 2. Continuous Battery operation up to hours with exchangeable battery. 3. Monitoring system consists of 2 units; base unit and a worn unit. 4. Two units must communicate wirelessly over a distance of 150 feet. 5. No way of harming the wearer. 6. The worn unit will be easily attached/detached by a guardian. 7. The base unit will be capable to store at least 10 seizure events. 8. The base unit will alert the guardian of the seizure activity using an audible alarm on the base unit. 9. Develop a preliminary seizure detection algorithm to process the seizure data. 10. Using the collected seizure data validate the accuracy of the preliminary seizure detection algorithm.

Process - Specifications There may be up to 6 worn units communicating to the base unit to properly monitor seizure activity. A seizure activity will be detected using a 3-axial accelerometer with acceleration values up to 6g. An accelerometer reading will be passed to the microcontroller on the worn unit where it will be checked against an adjustable threshold voltage. ZigBee wireless communication will be used between the worn unit(s) and the base unit. The transfer rate of data between two units will be 250 kbps. The base unit will be capable of writing the seizure data to a USB flash drive with maximum capacity of 1GB in a text file format for later analysis. The base unit will run on a standard wall outlet The worn unit will run on 2 standard AAA batteries Attach/Detach system, for the worn unit, will use a Velcro strap. Size of the worn unit will be approximately 2.5” x 2.5” x 1.5”

Process – Specifications (Continued) 15 Hz max signal (tested) will be sampled at 120 Hz, converted through a 10 bit ADC 3 axis accelerometer, possibly 6 total accelerometers. Therefore bits/s Typical max seizure length = 5 minutes. Therefore 5,184,000 bits < 1 Megabyte Necessary transfer rate from worn to base: 2,880 bits/s ( kb/s) With 6 accelerometers the base unit must handle a transfer rate of 2.11 kb/s Acceleration Info: +/- 6 g’s (tested) Bandwidth maximum = 150 Hz Frequency Resolution is based on sample time, our 5 minutes could produce accuracy up to Hz.

Specifications – Self Test The battery voltage on the worn unit will be constantly monitored when the unit is turned ON. In the event it drops below 2.4V, the “Low Battery LED” on the worn unit will be turned ON. The worn unit will implement a self test each time the unit is turned ON. This self test is used to test the following components and functions of the seizure monitor system:  Accelerometer (worn unit)  Wireless transmitter (worn unit)  Wireless receiver (base unit) To ensure system integrity, the wireless communication system and accelerometer will be tested in addition to the startup test. The “System Operates Properly LED” on the worn unit will be blinking every second unless it is turned OFF during the self test as following:

Specifications – Self Test (Continued) Wireless Communication Test In the event that no signal is transmitted from the worn unit to the base unit during one minute, a test signal will be sent to the base unit. The base unit will detect the test signal and will send it back to the worn unit. In the event that no signal is received back from the base unit, the “System Operates Properly” LED on the worn unit will be turned OFF. In the event that no signal is received by the base unit from the worn unit (including the test signal mentioned above) during one minute, the base unit will trigger the sound alarm to alert the guardian. The “Communication Operates Properly” LED on the base unit will be turned OFF.

Specifications – Self Test (Continued) Accelerometer Test When the worn unit is turned ON, a small, unbalanced DC motor, similar to those used in pagers and cell phones, will be activated for a second. The vibration produced by the DC motor will be detected by the accelerometer and the signal will be transmitted to the base station and written to a file. In the event no signal is transmitted from the accelerometer to the microcontroller in one minute, the unbalanced motor will be turned ON by the microcontroller to “shake” the board. If no signal will be detected from the accelerometer, the “System Operates Properly” LED on the worn unit will be turned OFF and the “System Failure” signal will be sent to the base unit to produce an audible alarm to alert the guardian. A “System Failure” LED on the base unit will be turned ON.

Process – Design Decision Matrix for assessing top 3 candidates for GTC seizure monitoring Scale (1-10 with 10 being the best) Frequently Exhibited Easily Measured/ Ease of Use Magnitude of Variation from Baseline Symptom Occurs Quickly CostSum Body Shakes Breathing Oxygen Saturation level Blood pressure EEG abnormality Body Temperature Heart rate

Process – Design (Continued) Easy to implement using a base and a worn unit? Easy to attach/detach? Accuracy of result? Continuous power for 14 hour operation? Body shakesOKBestOK EEG abnormality detected by multiple electrode EEG recording Worst BestWorst Heart rateBestOKWorstBest Top 3 candidates for GTC Seizure Monitoring

Process – Design (Continued) BluetoothZigBeeUWB Range~ 100 m~ 10 m~ 100 m~ 10 m Throughput< 54 Mbps< 3 Mbps< 0.25 Mbps< 500 Mbps Battery LifeFairGoodVery goodGood CostFairGood Ease of useVery goodFairVery goodGood Network Technologies Table

System Design Based on the Original Request

System Design Based on Requirements

System Design Based on the Specifications

Design – Block Diagram of Overall Process

Design – Block Diagram of Worn Unit

Design – Circuit Schematics

Design – Preliminary Bill of Materials

Design – Worn Unit Model

Feasibility: Zigbee communication and accelerometers have been used in similar applications. Signal processing has been accomplished by one of the team members in the past on accelerometer data. Antenna design is a new area for all team members providing some concern. The team will get help from Dr. Venkataraman in designing the antenna. Without a pure way of accessing the battery life there exist some concern in meeting a long life (preliminary calculations have been accomplished). Board layout has been accomplished by two team members in the past, but there is some intrinsic difficulties in any board layout. The design uses devices that have been previously tested on humans, so no foreseen implications from this testing are expected.

Implementation Plan 1. Use the evaluation board that includes the accelerometer unit and the transceiver to develop software code for the microcontroller on the worn unit. 2. Develop software code for the microcontroller on the base unit. 3. Breadboard the worn unit to validate the accuracy of the design. 4. Assemble a prototype worn unit and perform “in house testing”. 5. Make a preliminary printed circuit board layout for the worn unit. 6. Develop a preliminary seizure detection algorithm to process the seizure data. 7. Upon approval from RIT/U of R IRB Review Boards, implement human testing and capture data. 8. Using the collected seizure data validate the accuracy of the preliminary seizure detection algorithm.

Summary Team members gained significant knowledge on seizure types and possible detection techniques. The preliminary design of the seizure monitoring system has been accomplished. As the ZigBee evaluation kit will be used for initial data acquisition, there may be some changes to the design. Upon assembling and testing a prototype, consideration of modifying the design will be made based on the test results and the functionality of the system to meet the desired outcome. Data collection will be orchestrated early in Senior Design II at Strong Memorial Hospital. A low level algorithms for detection will be written and then tested once the seizure data has been collected. Some changes may occur based on the test results.

Acknowledgements: Dr. Phillips Dr. Berg – Director of Center for Epilepsy at Strong Memorial Hospital, Rochester, NY. This material is based upon work supported by the National Science Foundation under Award No. BES FSI International Incorporated Sanyo Our Customer