ERCOT RMR Study for Luminant NSO

Slides:



Advertisements
Similar presentations
Additional CREs to address Stability Limits Beth Garza TAC June 26, 2008.
Advertisements

RPG: September 24, Approach for ERCOT Independent Review of the 2013 Houston Import Project Jeff Billo, Manager, Transmission Planning September.
October 16, 2009 RPG Meeting ERCOT RPG Project Review Update Jeff Billo.
Jan 22, 2013 RPG Meeting Sharyland Atlas-Driver Load Integration Project – EIR update.
March 6, 2008 Technical Advisory Committee Luminant Energy & Oncor Tyler Grande Autotransformer Addition and 138 kV Line Upgrade Project Jay Teixeira Manager,
Regional Planning Group Project
Overview of ERCOT Outage Coordination Woody Rickerson Director Grid Coordination January 2015.
April 16, 2010 Regional Planning Group RMR Exit for Spencer 5 – Remedial Action Plans Chris Ngai Jay Teixeira.
KURTEN SWITCH PROJECT (BRYAN/ COLLEGE STATION AREA UPGRADES) Technical Advisory Committee December 1, 2005 Transmission Services.
Houston Region Import Capacity Project August 27, 2013 Regional Planning Group Meeting.
Valley Import Overview Jeff Billo Regional Planning Group Meeting July 22, 2014 Preliminary1.
ERCOT PUBLIC 4/21/ Loss of Load Probability Assessment for NERC April, 2015.
Houston Area Dynamic Reactive Project March 11,
JACKSBORO TO WEST DENTON 345-kV PROJECT Presentation to Technical Advisory Committee April 8, 2004 Transmission Services Operations.
Long Term Study Task Force Update Transmission Study Practices and Methodologies April 5th,2011 LTS.
December 7, 2012 ERCOT Planning Horizon SOL Methodology Update Jeff Billo RPG.
April 16, 2010 RPG Meeting ERCOT Five-Year Transmission Plan Update Jeff Billo.
RPG Meeting Five Year Plan Extension Brad Schwarz.
Reliability Requirements Bill Blevins Manager of Operations Support ERCOT.
LAREDO PLANT RMR EXIT STRATEGY Presentation to Board of Directors March 16, 2004 Transmission Services Operations.
John Dumas Director of Wholesale Market Operations Jeff Billo Manager of Mid Term Planning Dan Jones Director with Potomac Economics, the ERCOT IMM Board.
Constraint Management Plans (CMPs) An Ops Planning Perspective Nitika Mago Operations Planning, ERCOT.
NPRR514, Seasonal Generation Resource Wholesale Market Subcommittee April 12, 2013 Amanda Frazier.
ERCOT PUBLIC 5/20/ RTP Inputs and Assumptions May 20, 2014.
June 19, 2009 RPG Meeting ERCOT System Development Update Jeff Billo.
Proposed North – South Congestion Mitigation Plan Luminant Energy July 2008.
Economic Planning Criteria Question 2 1/7/2011 Joint CMWG/PLWG Meeting March 4, 2011.
Chad Thompson, ERCOT Special ROS PGRR011 Workshop October 21 st, 2011 SCED Overview and Results.
March 13, 2009 RPG Meeting ERCOT System Development Update Jeff Billo.
Jones Creek Project Submitted to RPG on July 7, 2014 July 22, 2014 Regional Planning Group Meeting.
April 16, 2010 RPG Meeting Lamesa Area Upgrades ERCOT Independent Review Jeff Billo.
© ABB Group August 23,2010 | Slide 1 MBPC Study – 1 st Load Pocket Preliminary Results for Discussion only Entergy Regional State Committee (ERSC) Southwest.
2008 Annual Five Year Plan Update 2 10/12/2007 Regional Planning: Jay Teixeira, Harry Liu, Brad Schwarz, Jeff Billo, Chris Ngai.
May 11, 2012 RPG meeting YTP Scope and Process – RPG Comments.
SPP.org 1. Status Update for Reliability and Economic Assessments Stakeholder Meeting September 16, 2008 Austin, TX.
SPP.org 1. Final Report: Reliability and Economic Assessments Stakeholder Meeting December 1, 2008 Austin, TX.
February 13, 2009 RPG Meeting ERCOT System Development Update Jeff Billo.
ERCOT Independent Review
SPP.org 1. Status Update for Reliability and Economic Assessments Stakeholder Meeting June 20 th, 2008 Austin, TX.
October 16, 2009 RPG Meeting ERCOT Independent Review of the Corpus Christi Improvements Project Jeff Billo.
Current Operational Challenges Computing the West – North Limits Potential IROLs Local Voltage & Thermal issue (OOME) High Voltage Outages.
ERCOT PUBLIC November RPG Meeting RTP – Study Scope November 20, 2015.
RPG: September 24, Long-Term System Assessment Introduction Jeff Billo, Manager, Transmission Planning September 2013 Regional Planning Group.
Coordinated Planning Concept (For Discussion Only) revised 11/30/04 07/01/04.
September 1, 2011 TAC Lower Rio Grande Valley Regional Planning Group Project Jeff Billo Manager, Mid-Term Planning.
OPSTF – Issue 7 Long-term unavailability of autotransformers.
Panhandle Renewable Energy Zone (PREZ) Study
June 3, 2010 Technical Advisory Group RMR Exit for Spencer 5 – Remedial Action Plans Jay Teixeira.
May14, 2010 RPG Meeting Houston Import Study Update Jeff Billo.
Estimating Available Capacity for New Generators Jonathan Rose Planning Engineer, Resource Integration Dept. Regional Planning Group September 24, 2013.
Capacity, Demand and Reserves Report Bill Bojorquez May 4, 2007.
Capacity, Demand and Reserves Report Bill Bojorquez Board of Directors Meeting May 16, 2007.
Transmission Services Report: North and West RPG Projects Bill Bojorquez TAC July 7, 2005.
ERCOT PUBLIC 3/25/ RTP Inputs and Assumptions March 25, 2014.
June 11, 2010 RPG Meeting Houston Import Study Update Jeff Billo.
CMWG Update to WMS Met 4/24 & 5/11 Continued Work on PRR 801 –Discussed outages as related to TCR Cases –ERCOT evaluates various outage combinations.
Impact of not including proposed generators lacking RARF data in the planning models Planning Guide Section 6.9 Issues February 17, 2016.
1 ERCOT 2015 West Texas Study November 18, 2014 Jeff Billo.
ERCOT – LP&L Study Status Update For Regional Planning Group Ben Richardson March 22, 2016.
RELIABILITY AND OPERATIONS SUBCOMMITTEE Report to TAC Austin, TX December 1, 2011 Kenneth A. Donohoo, P.E. Chairperson Oncor Electric Delivery Company.
Reliability Must Run Workshop Introduction May 24, 2016.
Reliability Must Run Workshop RMR Study Process May 24, 2016.
Freeport Area Master Plan Project -
Modeled Load Levels in the Valley
Transmission Planning in ERCOT- Overview
ERCOT 2011 Five-Year Transmission Plan Update
ERCOT 2009 Five-Year Transmission Plan Update
Southern Cross Directives Planning Items
RMR Exit for Spencer 5 – Remedial Action Plans
Study Scope - Quarterly Stability Assessment
Presentation transcript:

ERCOT RMR Study for Luminant NSO Jeff Billo RPG Meeting March 13, 2009

Luminant – Notice of Suspension of Operations On February 5, 2009 Luminant submitted Notice of Suspension of Operations (NSO) for: March 13, 2009 RPG Meeting

Luminant – Notice of Suspension of Operations The units were grouped and analyzed in two group based on the proposed suspension dates Group 1: May 2009 Group 2: September 2009 Analysis was done to determine if absence of the units violated any planning criteria as outlined in the Operating Guides Transfer study performed using MUST Voltage Stability study performed using VSAT Study results were reviewed and verified by Operations Staff March 13, 2009 RPG Meeting

Luminant – Notice of Suspension of Operations The following study assumptions were used: 2009 summer peak case (SSWG DSA December 2008 Update) used for Group 1 units All Group 1 units turned off All Group 2 units were available (unless otherwise specified) All wind generation was turned off 2010 summer peak case (SSWG DSB December 2008 Update) used for Group 2 units All Group 1 and 2 units were turned off For each unit a second scenario was modeled where a nearby unit was modeled as unavailable; for some units a third scenario was modeled where a different nearby unit was modeled as unavailable [to meet Operating Guide 5 requirements] March 13, 2009 RPG Meeting

Luminant – Notice of Suspension of Operations Justification for turning off wind generation in RMR analysis using 2008 wind data 348 hours when wind generation was less than 10% of installed capacity (roughly one hour each day) 179 hours when all wind generation in ERCOT was less than 30 MW total (roughly one hour every 2 days) 55 hours when all wind generation in ERCOT was less than 10 MW (roughly one hour each week) 1 hour when all wind generation in ERCOT was 0 MW March 13, 2009 RPG Meeting

Luminant – Notice of Suspension of Operations Permian Basin 5 Results With a nearby unavailable the following constraints could not be resolved: Transfer Limit (MW) Limiting Element Limiting Contingencies -483 Odessa (138/345) kV Auto-transformer – 1 Auto-transformer – 2 -118 Ackerly Vealmoor – Ackerly 69 kV Line Sharon Ridge – Bluff Creek 138 kV Line March 13, 2009 RPG Meeting

Luminant – Notice of Suspension of Operations Permian Basin 6 Results The following constraints could not be resolved: Transfer Limit (MW) Limiting Element Limiting Contingencies -56.1 1027 ODESEHV_ 138 1028 ODESEHV_ 345 1 1027 ODESEHV_ 138 1028 ODESEHV_ 345 2 412.3 March 13, 2009 RPG Meeting

Luminant – Notice of Suspension of Operations Permian Basin 6 Results With a nearby unit unavailable the following constraints could not be resolved: Transfer Limit (MW) Limiting Element Limiting Contingencies -122.5 1356 ACKRLYVE 69.0 1362 ACKERLY_ 69.0 1 1300 EXSHARNR 138 1309 BLUFCKTA 138 1 150.2 1362 ACKERLY_ 69.0 1363 ACKRLNTC 69.0 1 210.5 1300 EXSHARNR 138 1301 WILLOWVA 138 1 201.8 1308 GAILLYNT 138 1301 WILLOWVA 138 1 280.0 272.2 401.4 1363 ACKRLNTC 69.0 1364 SPARNBRG 69.0 1 409.9 1164 LAMESA_9 69.6 1364 SPARNBRG 69.0 1 1027 ODESEHV_ 138 1028 ODESEHV_ 345 1 1027 ODESEHV_ 138 1028 ODESEHV_ 345 2 346.1 459.2 1054 OLFNNSHL 138 1055 NYLONTAP 138 1 1051 HUNTSMAN 138 1052 REXALL_8 138 1 269 1322 BIGSPRIG 138 1324 BIGSPGWE 138 1 1028 ODESEHV_ 345 11016 QUAILSW_ 345 1 1030 MRGNCRK_ 345 1058 LONGSHOR 345 1 March 13, 2009 RPG Meeting

Luminant – Notice of Suspension of Operations Decordova Results With a nearby unit unavailable the following constraints could not be resolved: Transfer Limit (MW) Limiting Element Limiting Contingencies -981 2427 WATMLL_W 345 3123 TRINDAD1 345 1 Limestone 345 kV to Water Mill 345 kV 1 Limestone 345 kV to Water Mill 345 kV 2 -57.2 3380 BIGBRN__ 345 3391 JEWETT_N 345 1 -287 2432 TRICRN1_ 345 3124 TRINDAD2 345 1 228.5 2420 CHILSW1_ 345 2428 WATMLL_E 345 1 2398 WLEVEE1_ 345 2997 WATMLL_2 345 1 2427 WATMLL_W 345 2946 SARGT1_5 345 1 2427 WATMLL_W 345 2997 WATMLL_2 345 1 473.1 1906 VENUS_S5 345 3380 BIGBRN__ 345 1 March 13, 2009 RPG Meeting

Luminant – Notice of Suspension of Operations Further analysis is being done to determine if Permian Basin 5, Permian Basin 6, and Decordova are needed as Reliability Must Run (RMR) units. Uplan analysis being performed to determine if security constrained dispatch is possible Working with Oncor to verify results and possibly determine if RAPs or SPSs can be developed to resolve constraints Initial analysis determined that all other units proposed in the NSO did not qualify for RMR status. March 13, 2009 RPG Meeting

Questions? March 13, 2009 RPG Meeting