0 CCG Meeting Angaston 3 rd December 2008. Penrice CCG Meeting Action Arising BLAST MONITORING Chris Linke Monitor Site Blast Data 21/11/09 60 holes located.

Slides:



Advertisements
Similar presentations
Bewdley Flood Alleviation Scheme. Bewdley, November 2000.
Advertisements

SOUTHERN FRINGE DEVELOPMENTS –CONSTRUCTION MANAGEMENT STRATEGY JUNE 2011 Outline /Full Planning Permissions –provisions 1. Strategic Construction Environmental.
DustScan Ltd Planning Consent for Mineral Works Oliver Puddle 25 September 2013.
Chris Raykos Project Director Infrastructure Delivery Directorate
1 Terramin TSF Base Lining Examining the design criteria :– a risk based design process Agenda for Strathalbyn CCC Meeting Review of the relevant components.
® Steve Pyne & Paul West 20th September 2012 Building something great™ ‘Creating Certainty in an Uncertain World’ Concurrent Session 1 - Development Approvals,
Impacts of crushed rock quarries on historic villages and cultural landscapes Gemma Marchant 1, Nigel Blades 1 and Paul Greening 2 1 UCL Centre for Sustainable.
INSPECTION PENRICE ANGASTON QUARRY OPERATION Thursday 19 February 2009.
Dr Chris Boomer Development Plans Manager (DoE Northern Ireland)
| pg 1 NSW Planning & Environment Upper Hunter Mining Dialogue Presentation th October 2014 Presented by Scott Brooks, Team Leader, Compliance.
Current Trends in Mining Finance: Strategic and Financial Challenges Roy Hinkamper, KPMG LLP April 2013.
BWEA OFFSHORE CONFERENCE 17 – 18 APRIL 2002 Offshore Consents Planning for the Future Nigel Peace Director, Energy Regulation Department of Trade & Industry.
DEPARTMENT OF HUMAN SETTLEMENTS- SANITATION INPUTS ON NATIONAL WASTE MANAGEMENT STRATEGY 29 MAY 2012 By Mandisa Mangqalaza.
0 CCG Meeting Angaston 1 st April Mine Operation Update Eastern area  Shaping and topsoil addition continuing  Preparation for planting of trees.
Pertemuan Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
Lecture(3) Instructor : Dr. Abed Al-Majed Nassar
1 Assessment Process for new Mining Leases (SA Mining Act 1971) May,2006.
I n t e g r a t I n g C S S Practitioner Module 4 1 Module 4: CSS in Corridor and Sub-area Planning.
Community Reference Group Meeting #3 MITCHELL FREEWAY EXTENSION Burns Beach Road to Hester Avenue Chris Raykos Project Director Infrastructure Delivery.
3 Dec 2003Market Operations Standing Committee1 Market Rule and Change Management Consultation Process John MacKenzie / Darren Finkbeiner / Ella Kokotsis,
Jilin Provincial Transport Scientific Research Institute & PEECE Pty Ltd Environmental Management Plans Presented by Phil Hawley & Steve O’Rourke P E E.
A division of Holcim (Canada) Inc. Public Information Session Proposed Extension of the Acton Quarry May 5, 2009.
OSU Airport – Overview of Master Plan and Draft Environmental Assessment Purpose of an Airport Environmental Assessment (EA) Identify environmental impacts.
U.S Department of Transportation Federal Highway Administration Federal Transit Administration MAP-21 Moving Ahead with Progress in the 21 st Century Linking.
TERRAMIN AUSTRALIA Limited Angas Zinc Project. The Angas Zinc Project: noise Noise issue is a “work in progress” –Final noise outcomes and decisions awaiting.
Western Australian Regional Freight Transport Network Plan- Implementation Priorities Presentation to the Freight and Logistics Council Steve Beyer, Executive.
ISA 562 Internet Security Theory & Practice
Atlin/Taku Land Use Planning Forestry Chapter Presentation to Multiparty Workshop #4 June 19, 2009.
Screen | 1 EPA - Drivers for Regionalisation Max Harvey Director Operations Environment Protection Authority Presentation, reference, author, date.
Eccles Housing Market Report Community Committee Meeting 25 th January 2005 Shahla Zandi Strategy and Planning (Partnerships and Planning)
Current and future challenges in disposing of LLW – the LLWR perspective SAFESPUR WORKSHOP 29 April 2009 Presented By: Chuck Conway, Head of Consignor.
SA Power Networks Strategic Vegetation Management Alexandra Lewis, Vegetation Strategy Lead LGA Roads and Works Conference – 28 August 2014.
Penrice – CCG Meeting Overburden Options OptionImpactEffectComment 1. Stop removing schist and low grade limestone Will stop extraction of high grade limestone.
TERRAMIN AUSTRALIA Limited Angas Zinc Project. Angas Zinc Project: traffic Raised as a concern through Stakeholder consultation process Dominant source.
DEPARTMENT OF REGIONAL DEVELOPMENT, PRIMARY INDUSTRY, FISHERIES AND RESOURCES Mining Management Act Security
1 Short Term MPL – Western Area PCCG Meeting 3 rd December 2008.
Review of the implementation in England of the Habitats and Wild Birds Directives Nature Directors 23 May 2012 Robin Mortimer, Defra.
LIFE AFTER LANDFILL – THE TRANSITION FROM LANDFILLS TO RESOURCE RECOVERY AND TRANSFER STATION 27 September 2007 "Planning – Guidance on Planning Issues.
2006 Noise EIS Health Canada Technical Review  WHO Community Noise Guidelines threshold for bedrooms is 30 dBA L eq  Predicted ambient noise levels outside.
1 South Australian Mining Act requirements for Angaston Quarry 5 th November 2008.
TERRAMIN AUSTRALIA Limited
Planning for the future of our district Core strategy options Presentation to C4B Associates February 2010.
WEC MADRID 18 TH MARCH 2004 ASTRAZENECA’S APPROACH TO SUPPLIER RISK MANAGEMENT.
A96 Fochabers Bypass Moray Council 15 August 2007.
Community Development Department APPLICATION #2457 GRAND HAVEN PUD AMENDMENT APPLICATION #2411 GRAND HAVEN NORTH: SMALL SCALE FLUM AMENDMENT APPLICATION.
The National Forest to 2014 Consultation June to September 2008 Dinah Nichols, Chair National Forest Company.
Core Strategy Dublin City Development Plan
The Second Annual Medical Device Regulatory, Reimbursement and Compliance Congress Presented by J. Glenn George Thursday, March 29, 2007 Day II – Track.
ASPEC Damaging Energies New Staff Induction What is this course about? This course is designed to talk through the major damaging energies on site. It.
Expert Group Meeting on the Revision of the Handbook on the Management of Population and Housing Censuses New York, 14 – 17 December 2015 Overview of the.
Communities M40 J12-J14 – Data Analysis, Modelling and Scheme Development.
EASTSIDE ACTIVITY CENTER DRAFT MASTER PLAN Board of County Commissioners January 22, 2008.
True Open Pits ©Summer 2003 Dr. B. C. Paul. Telling a True Open Pit Strip mines advance across the deposit backfilling pits with new overburden as they.
Energy Policy Act – 2005 West-Wide Energy Corridors.
Waterdown Road Corridor Class Environmental Assessment (Phase 3 & 4) Community Services Committee May 9, 2012.
Council Improvement Plan Council Meeting 1 June
Neighbourhood Planning in Haringey Myddleton Road Strategic Group 7 th November 2013.
Santiago Hills II East Orange General Plan Noise Assessment Matthew B. Jones, P.E. Mestre Greve Associates.
EIAScreening6(Gajaseni, 2007)1 II. Scoping. EIAScreening6(Gajaseni, 2007)2 Scoping Definition: is a process of interaction between the interested public,
Tailings Dam Stability
OPEN SPACE/ CONSERVATION
Upland Landfill Waste Discharge Application 7295 Gold River Highway
IAEA C2G Working Group 1 (Import / Export Controls, Repatriation, and National inventories / Registries) Outcome / Recommendation Summary Paul Gray & Dariusz.
Second Quarter Audit Committee
Hung Shiu Fung, Thomas Fischer
Enterprise Content Management Owners Representative Contract Approval
CARE Country Office Training 2016
Contracts and Procurement
Manilla Low Level Crossing Project
Western Orbital: M11 J11 Park and Ride Provision
Presentation transcript:

0 CCG Meeting Angaston 3 rd December 2008

Penrice CCG Meeting Action Arising BLAST MONITORING Chris Linke Monitor Site Blast Data 21/11/09 60 holes located in south east pit face Vibration 0.53 mm/sec (Aust Std 5.0 mm/sec) Overpressure 95.4 dBL (Aust Std 115 dBL) Salem Road Monitor Site (near Linke driveway entrance) Vibration 1.32 mm/sec Overpressure dBL Further monitoring - 3/12/08 and the next week then relocation to south west of the mine

Penrice – CCG Meeting Blasting – Draft Environmental Outcome No nuisance to adjacent residents and sensitive receptors per definition of the relevant Australian Standard, currently AS (2006) Blasting will occur on weekdays (excluding Public Holidays) between 9.00 am and 4.30 pm. Where the number of blasts in any year is estimated to be more than 20% above the average of the last 5 calendar years annual blast number, this will be communicated to the PCCG and community. Environmental Criteria for Measurement Blasting complies with Australian AS (2006) for overpressure (noise) (115dB environmental limit with 5% to a maximum of 120dB) and vibration levels (environmental limit 5 mm/s with 5% to a maximum of 10 mm/s) Not more than 1% of the annual blasts will be out side these times Strategies for Management Compliance with Penrice Mine Operating Manual (procedure reference QFM2) Overpressure and vibration levels will be measured during all scheduled blast activities Blast modelling will be introduced using available industry technology. Penrice will engage with community on alleged blasting damage to private infrastructure and investigate. Any mitigation measures will be determined and implemented based on investigation outcomes. Ongoing review of new blasting technology to reduce vibration and air pressure Ongoing training of blast technicians Visual blast records and monitoring data maintained for each blast event Annual audit of blast procedures by external parties

Penrice CCG Meeting Action Arising Barossa & Light Landscape Study 2005 Study recommendations will be a part of a regional/council consultation process in 2009 Particular emphasis of quarry impact Importance of specific areas/features Recommendations 5, 6, 7, 8 Geotechnical Report Initially supplied to PIRSA

Penrice – CCG Meeting Key Overburden Issues 2007 recognized insufficient space for overburden Storage overburden in the east area since early 1990 ’ s Mostly for low grade limestone in future years Space impacted by height cap of the eastern storage area 2M mt behind minimum extraction plan (Maptek) requirements 4M mt planned in 2008 of both schist & low grade limestone to economically match out the internal haul fleet capacity Storing low grade limestone in the north end of pit that will increase in coming years as the west face storage area is crushed to consume this inventory – 3M mt. Extraction volumes limited in the last 5 months due to space issues Consistent at all meetings with space issue and time constraints

Penrice – CCG Meeting MAPTEK 30 year Mine Plan Increased overburden requirements due to geology & ore quality of high grade limestone, 2008/09 plan 4m mt with less in later years Of the 12.5M mt extracted in 4.4 years, 10m mt is schist Actual & Proposed Material Movements mt Period High Grade LS Plan Maptek Schist & LGLS Plan Cumm. Actual Schist & LGLS Cumm FY 04/051,200,0002,455,590 2,101,369 FY05/061,200,0003,002,2515,457,8412,612,7734,714,142 FY06/071,200,0003,312,0648,769,9053,091,3487,805,490 FY07/081,200,0003,312,06412,081,9693,847,17811,652,668 FY08/091,200,0002,445,73314,527,702884,05812,536,726 FY09/101,200,0001,579,40316,107,10512,536,726 FY10/111,200,0001,579,40317,686,50812,536,726 FY11/121,200,0001,579,40319,265,91112,536,726 FY12/131,200,0001,206,48920,472,40012,536,726 FY13/141,200,0001,206,48921,678,88912,536,726

Penrice – CCG Meeting Schist Overburden Extraction Volume (M mt)

Penrice – CCG Meeting CCG - MPL and Whole of Mine review Gerlach land purchase contracted in December 2007 In discussions with PIRSA since March 2008 on the MPL and the process with statutory consultation completed in August 2008 Agreed with PIRSA for CCG to review environmental outcomes for whole of mine operation (not just the west MPL area) This process will take another 6 -9 months

Penrice – CCG Meeting Visual Amenity Penrice is: Completing the profiling of the whole east and north faces to fit the hill line land form Looking to find a temporary visual solution to the west face of east while crushing the low grade limestone inventory It is not standing still and has limits on the capacity to remedy all areas of concern

Penrice – CCG Meeting Visual Amenity In the meantime Penrice is: Completing the profiling of the whole east and north faces ( see photos) Looking to find a temporary visual solution to the west face while crushing the low grade limestone inventory It is not standing still and has limits on the capacity to remedy all areas of concern

Penrice – CCG Meeting Visual Amenity In the meantime Penrice is: Completing the profiling of the whole east and north faces ( see photos) Looking to find a temporary visual solution to the west face while crushing the low grade limestone inventory It is not standing still and has limits on the capacity to remedy all areas of concern

Penrice – CCG Meeting Strategic Visual Amenity Plan Development  Visual Amenity is established through land form and vegetation, Oxigen are working up a strategic plan for the site covering Existing Mine Area  Increase plantings and renew poor or dead vegeatation and under-story plantings to increase wildlife habitat – see map Eastern Area  Estimated 30,000 trees/shrubs required for completion of eastern face at 12000/annum  Plantings on the north & east faces to RL400 in progress  Grass west face of eastern mound - low grade limestone and iron stone road benches Western Area  Interim MPL proposal Outside Mine Boundary  In conjunction with council/residents/land owners agree a tree planting regime. (Suggested areas include areas of Stockwell Road & Penrice Road)

Penrice – CCG Meeting Interim WEST MPL (South-block) This will allow PSP to continue mine operations for 9 – 12 months This time will be needed to review all the environmental outcomes for the whole of mine site by the CCG and To investigate other OB disposal options that are economical operationally practical and do not limit the ability to extract high grade limestone OXIGEN plan Lease conditions are as detailed by PIRSA A MARP with environmental outcomes and criteria are being finalized to match the newly issues lease conditions Penrice is committed to finding solutions to community concerns