Plum Creek Reservoir Water for a Better Tomorrow Kickapoo Tribe in Kansas January 13, 2003.

Slides:



Advertisements
Similar presentations
Division of State Lands’ Wetlands Program. Issues That Spawned State Wetlands Program (SB 3) Lack of detailed wetlands inventory information or guidance.
Advertisements

Tour of Five Small Flood Control Dams in Iowa and Nebraska Rehabilitation Needs of Aging Small Flood Control Dams.
Dam Removal in Rhode Island: Present and Future David Chopy, DEM July 16, 2009.
Floyd County Board of Commissioners Special Town Hall Meeting Topic: Update on status of Georgetown WWTP.
BOARD OF COUNTY COMMISSIONERS DECEMBER 11, 2012 CELEBRATION POINTE COMMUNITY DEVELOPMENT DISTRICTS.
Watershed Dams in Georgia 1. –357 Total –195 High Hazard (NRCS) –NRCS constructed – owned by local sponsors –Most built between 1950s-1970s for flood.
EWP Emergency Watershed Protection1 N R C S Emergency Watershed Protection Program.
FDOT R/W Guidelines Use of License Agreements
Photo Courtesy of the Vermont Land Trust The Berlin Pond Watershed Conservation Project.
Mississippi Soil & Water Conservation Commission.
US Army Corps of Engineers BUILDING STRONG ® Suburban Flooding: Finding regional solutions to a growing problem Imad Samara Project Manager and Silver.
Bloomington’s Water Supply: System Overview and Planning by: Rick Twait, Superintendent of Water Purification City of Bloomington Mahomet Aquifer Consortium.
HR A 1 © Copyright 2004 The Trust for Public Land.
Rivanna Water & Sewer Authority Community Water Supply Mitigation Plan Public Meeting November 2, 2006.
Northeast Corridor Greenway Acquisition – Mitigation Feasibility Study Results City Council Workshop June 24, 2014.
Single Family Development in City of Austin Since Passage of Watershed Regulations Neighborhood Planning and Zoning Department April, 2008.
Protecting Working Lands: Through USDA Conservation Programs Denise Coleman National Farm and Ranch Lands Protection Program Manager USDA, Natural Resources.
Lecture(3) Instructor : Dr. Abed Al-Majed Nassar
ANRC AACD Arkansas Conservation Districts Training Program Power Point 12 Arkansas Natural Resources Commission.
Drought and the Central Valley Project August 2014.
Platting Update Orange County BCC January 27, 2015.
1 Status Report on H. Ligarde Elementary School Parking Lot Facility Construction Department August 16, 2002.
Bureau of Indian Affairs Southern Plains Regional Office National Budget Meeting – FY 2010 Water Resources Budget Request.
Department of Natural Resources and Conservation, Water Resources Division State Water Projects Bureau Kevin B. Smith, P.E., Chief
U.S Conference of Mayors August 2004 Mayor’s ’04 Metro Agenda Bipartisan Priorities Statement Directed for candidates in Presidential and Congressional.
NRCS Watershed Rehabilitation
1 U.S. ARMY CORPS OF ENGINEERS AND ST. JOHNS RIVER WATER MANAGEMENT DISTRICT Indian River Lagoon North Restoration Feasibility Study Public Meeting September.
Water & Waste Disposal Loans and Grants The funding purpose is to construct, enlarge, extend or improve water, wastewater and solid waste systems in rural.
Virginia Department of Conservation & Recreation Virginia Dam Safety & Floodplain Programs William G. Browning, Director Dam Safety & Floodplain Management.
Columbia River Water Management Program (CRWMP) Review of Year One Upper Crab Creek Planning Unit Meeting April 17, 2007.
Rick Swanson USDA Forest Service U.S. Forest Service: C&I’s for: The World’s Largest Water Company U.S. Forest Service: C&I’s for: The World’s Largest.
IRRPCC Meeting Albuquerque, NM November 8,  Clarification needed on applicability of these roads into the IRR Inventory  Assignment given to IRRPCC.
NRCS NRCS Watershed Program In Texas. Water Resources AuthoritiesAuthorities Project ActivitiesProject Activities RehabilitationRehabilitation FundingFunding.
Kathy Alexander, Ph.D. Technical Specialist Water Availability Division Texas Commission on Environmental Quality.
Governor’s Strategic Growth Plan Flood Protection and Clean, Safe, Reliable Water Supply Bond and Financing Acts of 2006 and 2010 Southern California Water.
Everglades Land Acquisition Project Carol Ann Wehle SFWMD Executive Director.
Improving Lives, Communities and the Environment Through Natural Resources Conservation.
Marin Coastal Permit Coordination Program. Why do we need a program? Called for in Watershed Plans: As many as 9 permits to consider for restoration.
Chapter 33 Dam Construction. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Give reasons why.
Anatomy of Iowa Floods: Preparing for the Future “How urban and rural Iowans work together to reduce flood impacts.” Wayne Peterson, Division of Soil Conservation.
US Army Corps of Engineers BUILDING STRONG ® Planning Principles & Procedures – FY11 AUTHORIZATION AND APPROPRIATION OR “It Takes Two to Tango"
Three Rivers Levee Improvement Authority June 8, 2007 Presentation to the State Reclamation Board Proposed Feather River Setback Levee.
Rivanna Water & Sewer Authority Community Water Supply Mitigation Plan Public Meeting November 2, 2006.
Soil and Water Conservation Act (SWCA) 1977 By: Kristen Wright.
Solano Habitat Conservation Plan 580,000 Acres 36 Covered Species; 4 Natural Communities 17,500 acres of Urban Development; 1,280 acres of other New Facilities.
Surface Water Supplies Joe Zulovich Extension Agricultural Engineer Commercial Agriculture Program.
Millbrook Dam Environmental Assessment Study Dan Marinigh CAO/Secretary-Treasurer Otonabee Region Conservation Authority October 20, 2015 Otonabee Conservation.
1. Land Conservation Act (LCA) * Public Agency Webinar Public Acquisition Notification Procedure – A Step by Step Guide * LCA, also known as the Williamson.
PREVENTING AGRICULTURE POLLUTION. Essential Question: What measures can be taken to prevent agriculture pollution? Objectives: 1. Identify sources of.
Three Rivers Levee Improvement Authority February 26, 2007 Presentation to the State Reclamation Board Subcommittee Proposed Feather River Setback Levee.
Mississippi Headwaters Board Land Protection Process Mississippi River Protection Through Partnership.
May 18, 2004 City Bond Election. MAY 2004 BOND ELECTION General Election May 18, 2004 Elections City Mayoral Election City Council Election City Bond.
GDEM Training June 2009 Emergency Watershed Protection (EWP) Program United States Department of Agriculture Natural Resources Conservation Service.
 What is EWP & How Does the Program Work? Emergency Watershed Protection Program.
Durham County Soil & Water Conservation District January 28, 2016 Michael Dupree.
US Army Corps of Engineers BUILDING STRONG ® Flood Fighting and Planning US Army Corps of Engineers Omaha District Joel Ames Tribal Liaison.
Regional Conservation Partnership Program Partnership Information Sherre Copeland, Partnership Liaison.
Overview of USDA - PL-566 Small Watershed Program - EWP Program Mahoning County FRM Informational Meeting August 16, 2016 Natural Resources Conservation.
STOCKTON DELTA WATER SUPPLY PROJECT (DWSP) Final Environmental Impact Report (EIR) Certification Hearing November 8, 2005 Mark J. Madison, Director Municipal.
Environmental Quality Board
Ontario’s Drainage Legislation
Kansas Experience in Technical Negotiations for Tribal Water Right Settlements Symposium on the Settlement of Indian Reserved Water Rights Claims, Great.
Land Use Challenges In Maryland Today
Potholes Supplemental Feed Route Project
Drought in Texas Texas Division of Emergency Management
“Keeping Water on the Land”
EAST MESABI JOINT WATER SYSTEM A JOINT VENTURE BETWEEN THE CITy OF AURORA & TOWN OF WHITE REQUEST A $8.6 million request for State Funding in 2018 for.
Nebraska Water Infrastructure Funding and Financing Programs
Federal Shutdown Impacts
EAST MESABI JOINT WATER SYSTEM A JOINT VENTURE BETWEEN THE east range communities REQUEST A $6 million request for State Funding in 2019 to build a comprehensive.
Presentation transcript:

Plum Creek Reservoir Water for a Better Tomorrow Kickapoo Tribe in Kansas January 13, 2003

Presentation Background Background Recent Events Recent Events Plum Creek Reservoir Plan Plum Creek Reservoir Plan Important Issues Important Issues Land Acquisition Land Acquisition

Background 1977 Low water impoundment dam constructed 1977 Low water impoundment dam constructed –1979: Water Plant and distribution system completed. –Temporary Solution –Serve the Tribe’s short-term needs until a reservoir could be built.

Background 1981Water Resources Investigation report 1981Water Resources Investigation report –Identifies 5 potential sites for multi-purpose reservoir. –No engineering, geological, or technical studies made. –Source: primarily from the 1978 General Plan

Background 1983Kickapoo Tribe and Nemaha-Brown Watershed Board co-sponsors of a Public Law 566 application. 1983Kickapoo Tribe and Nemaha-Brown Watershed Board co-sponsors of a Public Law 566 application. –BIA Funding received for planning. –PL 566 planning authorized by USDA in 1991

Background Public Law , The Watershed Protection and Flood Prevention Act of 1954 (Small Watershed Program) Public Law , The Watershed Protection and Flood Prevention Act of 1954 (Small Watershed Program) –Authorizes the Secretary of Agriculture to provide technical and financial assistance to local sponsors for planning and carrying out watershed projects. These watershed projects are for flood protection of agricultural lands and rural infrastructure, watershed land treatment, water quality, and agricultural water management. –Natural Resource Conservation Service (NRCS)

Background 1994Upper Delaware and Tributaries Watershed Plan 1994Upper Delaware and Tributaries Watershed Plan –Joint effort – Tribal, Local, and Federal –21 projects (20 non-tribal, 1 tribal) –Overriding purpose: Water supply for Tribe –KEY: Local sponsor with eminent domain Nemaha-Brown Watershed Board Nemaha-Brown Watershed Board

Background 1998Congress approves the Upper Delaware and Tributaries Watershed Plan. 1998Congress approves the Upper Delaware and Tributaries Watershed Plan. –BIA Funding key to approval

RECENT EVENTS Kickapoo Tribe in Kansas

Recent Events –Critical Water Shortage –Tribe installs temporary flashboards to increase the height of low water impoundment.

Background –20 of 21 projects completed within watershed. –Watershed Board refuses to assert eminent domain authority on behalf of tribe. –Frequent Critical Water Shortages

Recent Events July 17, 2003 July 17, 2003 –Kickapoo Tribe initiates Mandatory Water Conservation Measures in response to water shortage. Tribal Facilities on bottled water and sanitation only Tribal Facilities on bottled water and sanitation only No outside watering – lawns & gardens No outside watering – lawns & gardens Casino Casino –Paper products only –Adjustment of sanitation processes

Recent Events August 25, 2003 August 25, 2003 –Emergency Water Transportation Project BIA: $187,000 BIA: $187, ,000 gal/day 90 72,000 gal/day City of Sabetha identified as source to supplement Tribal Water Plant. City of Sabetha identified as source to supplement Tribal Water Plant.

Recent Events –Water Transportation Problems Mixing Problems Mixing Problems –Kickapoo Water Plant –Sabetha –Holton –Atchinson Daily Need Increased Daily Need Increased –Reason: Water Plant offline –Result: 72,000  90,000 to 120,000 gallons per day

Kickapoo Water Plant – August 27, 2003

Kickapoo Water Plant - August 27, 2003

Recent Events Maintenance / Flushing of Dam Maintenance / Flushing of Dam –September 25, 2003 –Performed by Water Plant staff. –Maintenance activities –2 years since last action.

Recent Events Clarifier Repairs Clarifier Repairs –EPA Set-aside funds –Work began Oct. 20, 2003 –Approx. 4 weeks –Timing Issue

Kickapoo Water Plant – October 24, 2003

PLUM CREEK RESERVOIR Kickapoo Tribe in Kansas

Plum Creek Reservoir Plan Plum Creek Multi-Purpose Structure Plum Creek Multi-Purpose Structure Flood Control39.4% Flood Control39.4% Municipal & Individual Water57.1% Municipal & Individual Water57.1% Recreation 3.5% Recreation 3.5%100% -Compare to Banner Creek Flood Control 36.7% Flood Control 36.7% Recreation44.4% Recreation44.4% Agricultural Water 6.3% Agricultural Water 6.3% Municipal & Individual Water12.6% Municipal & Individual Water12.6%100%

Plum Creek Reservoir Kickapoo Tribe will be responsible for operation and maintenance of the dam after completion Kickapoo Tribe will be responsible for operation and maintenance of the dam after completion

Estimated Costs Land Rights $1,462, acres real property Engineering, $ 875,000 Soils, permits Construction (66/34)$3,165,000 General development costs Water Distribution System$1,400,000 ========= ========= TOTAL BUDGET$6,902,500 Kickapoo Tribe’s Responsibility$4,951,400

Size of Development Permanent surface water pool – 475 acres Permanent surface water pool – 475 acres Permanent surface water pool with dam/spillway – 770 acres. Permanent surface water pool with dam/spillway – 770 acres. Potential recreational improvement/facilities – 485 acres. Potential recreational improvement/facilities – 485 acres. Total project area – approximately 1200 acres Total project area – approximately 1200 acres

Benefits of Plum Creek Water Supply Water Supply –Reliable and Improved water supply –Over 1,000,000 gal/day Flood Control Flood Control –Cropland, Stream bank stabilization, Road Recreation / Economic Development Recreation / Economic Development

Land Acquisition Multi-Purpose Reservoir Plum Creek Site 21-14

Initial Steps Identification of Owners/Land Descriptions Identification of Owners/Land Descriptions Obtained Title Certifications Obtained Title Certifications Obtained Appraisal Information Obtained Appraisal Information Obtained IRS information regarding condemnation Obtained IRS information regarding condemnation

Land Acquisition Actions Taken Actions Taken –Identified ownership –Determined land descriptions –Obtained Title Certificates –Requested Appraisal Information –Obtained IRS Information regarding condemnations

Land Acquistion 05/12/03 – General Information Letters to Landowners 05/12/03 – General Information Letters to Landowners 05/23/03 – 1 st Contact with Landowner – (Exchange) 05/23/03 – 1 st Contact with Landowner – (Exchange) 07/24/03 – Nemaha Brown Watershed Board Meeting 07/24/03 – Nemaha Brown Watershed Board Meeting 08/04/03 – Emergency Water Planning Meetings 08/04/03 – Emergency Water Planning Meetings 08/18/03 – Nemaha Brown Watershed Board to view Water Plant 08/18/03 – Nemaha Brown Watershed Board to view Water Plant 08/29/03 – Transporting of Water Begins 08/29/03 – Transporting of Water Begins 11/25/03 – End to Transporting of Water 11/25/03 – End to Transporting of Water 12/09/03 – Tax Information Letter to Landowners 12/09/03 – Tax Information Letter to Landowners

LANDOWNER SESSIONS 9 of 12 major owners contacted 9 of 12 major owners contacted Clarify misunderstandings (Funding Source - Tribe) Clarify misunderstandings (Funding Source - Tribe) Offer options (Replacement/Exchange) Offer options (Replacement/Exchange) Eminent Domain Eminent Domain News Articles – Pro & Con News Articles – Pro & Con Does not affect homesites Does not affect homesites