National Governors Association Meeting LM: Ensuring a Smooth Transition – Procedures and Examples June 21-22, 2005 Dave Geiser Office of Legacy Management.

Slides:



Advertisements
Similar presentations
The Challenge to Install 1,300 New Water Meters. Scope Install electromagnetic meters (mostly) + telemetry + solar power ~700 sites in Upper Murray Valley.
Advertisements

Project Cycle Management
Overview of Environment Agency Decommissioning and Clean up programme – delivering Nuclear site restoration Peter Orr, decommissioning and clean up programme.
EMS Checklist (ISO model)
SENIOR MANAGERS TRAINING FOR USE WITH
Department of Environmental Quality Environmental Management System Overview.
1 Best Practices for Risk-Informed Remedy Selection, Closure, and Post-closure Control for DOE’s Contaminated Sites October 30, 2013.
Environmental Management System (EMS)
Internal EMS Auditing at Naval Installations. 2 Title/Group/Section,etc. Navy EMS Overview  All “appropriate facilities” must implement an EMS that conforms.
Contractor Management and ISO 14001:2004
Environmental Management Systems Implementation. CH EMS Experiences CH conducted EMS audits of BNL’s EMS as required by a EPA MOU CH assisted the Yucca.
Small Projects & Tailoring Using the PPA 1:15 – 2:15 Teresa Kinley, OPHPR With Panelists: Susan Wilkin, NCCDPHP Andy Autry, NCBDDD Carol Waller, NCEH/ATSDR.
Mary Heyes HSSE Manager, Europe, Middle East & Africa
Project Management Process Project Description Team Mission/ Assignment Major Milestones Boundaries Team Identification Measures of Success Roles & Responsibilities.
ENVIRONMENTAL MANAGEMENT PLAN
Hanford Site: Long-term Stewardship Boyd Hathaway Realty Officer Department of Energy – Richland Operations Office Hanford Long-Term Stewardship (LTS)
Aust. AM Collaborative Group (AAMCOG) An introduction to ISO “What to do” guide 20th October 2014.
Presentation on CCELP. For more information: Presented to Bay Area Funders By: Members of.
Promoting Head Start and Preschool Collaboration: The Full Utilization Process Monday, June 16 3:30-5:00pm Bill Buchanan.
Opportunities for RAC Participation. Three Part discussion General presentation; Example of oil and gas decision making; and Panel Discussion of RAC involvement.
TRU Waste Processing Center Culture and Successful Implementation of an ISO Certified Environmental Management System Presented at the DOE ISM Conference.
ENVIRONMENTAL MANAGEMENT SYSTEMS EMS AWARENES TRAINING AT NOAA MARINE OPERATIONS CENTER - PACIFC JIM SCHELL, ENVIRONMENTAL COMPLIANCE OFFICER.
BS EN ISO 14001:2004 Madlen King BSc MSc MIEMA EMS Lead Assessor Lloyd’s Register Quality Assurance Ltd BS EN ISO 14001:2004.
ISO Standard is based on the management model of plan – do - check – act. Today we all be discussing the elements of the standard that deal with.
A case study of Quality Standards implementation in TASNEE Company ISO 9001: 2000, ISO 14001:2004 & OHSAS By Abdulgader Alharthi.
Risk Management & Liability Informa Brownfield Hospital Development Summit June 2009.
Copyright Course Technology Chapter 16: Closing.
Lessons Learned from Site Transition Presented by:Co-Contributor: Susan L. Smiley Frazer R. Lockhart, PMP Site Transition CoordinatorFederal Project Director.
GWAC Ordering Procedures Overview
Legacy Management Strategic Plan 2010 David Geiser Director, U.S. Department of Energy (DOE or Department) Office of Legacy Management (LM) November 2010.
Scott Surovchak Rocky Flats Site Manager U.S. Department of Energy (DOE) Office of Legacy Management (LM) Cleanup and Remedy Implementation at the Rocky.
1 Los Alamos Legacy Cleanup Completion Project (LCCP) Post Fiscal Year 2016 Contract(s) Industry Day Request For Information & Capability.
1 DOE IMPLEMENTATION WORKSHOP ASSESSING MY EMS Steven R. Woodbury
Nursing Home Incident Command System
Balancing Institutional Controls and Beneficial Reuse at U.S. Department of Energy Office of Legacy Management Sites Steven R. Schiesswohl U.S. Department.
1 Enterprise and Global Management of Information Technology.
Copyright Course Technology 1999
1 Office of Legacy Management FY 2007 Budget U.S. Department of Energy February 6, 2006.
National Centers for Coastal Ocean Science Environmental Management System Implementation August 2005.
National Cleanup Workshop Managing Large Capital Projects Ken Picha Deputy Assistant Secretary for Tank Waste and Nuclear Material.
1 BULGARIA PUBLIC- PRIVATE PARNERSHIP FOR REMEDIATION OF HISTORICAL POLLUTION Dr. Vania Grigorova Ministry of Environment and Water Bulgaria Managing for.
Environmental Management Plan (EMP) Required for: Full EIA based on Palestinian EIA Policy Category A projects based on World Bank Policy.
State and Tribal Government Working Group November 12, 2008 FERNALD NATURAL RESOURCE DAMAGES SETTLEMENT.
Component 8 Installation and Maintenance of Health IT Systems Unit 4 Structured Systems Analysis and Design This material was developed by Duke University,
Using an Environmental Management System for Managing DOE’s Legacy DOE Order Workshop 26 February, 2003.
Stewardship Planning & Local Governments: What’s Next? David M. Abelson Executive Director, Rocky Flats Stewardship Council Principal, Crescent Strategies,
Environmental Management Systems National Ocean Service National Centers for Coastal Ocean Science March 1, 2006.
River Corridor Closure Project Safety People Results End State and Final Closure Jeff A Lerch Manager, Long Term Stewardship June 1 and 2, 2006.
Planning for FY08: Managing the Transition of the LM Organization December 2004.
ARCHITECTURE ENGINEERING COMMUNICATIONS TECHNOLOGY AVIATION | CIVIL | CONSTRUCTION SERVICES | DATA SYSTEMS | ENVIRONMENTAL FACILITIES ENGINEERING | GEOSPATIAL.
International Atomic Energy Agency Regulatory Review of Safety Cases for Radioactive Waste Disposal Facilities David G Bennett 7 April 2014.
ORDER ENVIRONMENTAL PROTECTION PROGRAM WORKSHOP OVERVIEW OF ORDER Larry Stirling
National Center for Coastal Ocean Science Environmental Management System Implementation August 2005.
February 26 – March 1, 2012 ♦ Phoenix, Arizona Session # 90 Long–Term Stewardship at DOE’s Hanford Site Abstract #12575 Authors & Affiliation : Rick Moren:
Post Closure Aspects WG5. Post-Closure What does it mean ? UK – after period of institutional control France – after ceasing operations.
Company LOGO. Company LOGO PE, PMP, PgMP, PME, MCT, PRINCE2 Practitioner.
ICAJ/PAB - Improving Compliance with International Standards on Auditing Planning an audit of financial statements 19 July 2014.
PRE-PLANNING FOR CONSTRUCTION PROJECTS. OVERVIEW ASSESSING OWNER CAPABILITIES ANALYSIS OF RESOURCES REGULATORY REQUIREMENTS SITE DEVELOPMENT REVIEWING.
Green Remediation through Optimization Douglas Sutton, PhD, PE Tetra Tech GEO April 4, 2011.
Long-Term Stewardship: Institutional Controls on Department of Energy Sites Steve Schiesswohl, Senior Realty Officer November 2006.
American Recovery & Reinvestment Act Office of Environmental Management Presentation to Regulators March 6, 2009 Cynthia V. Anderson, EM Recovery Act Program.
1 DEPLOYMENT AND OPERATIONS MODULE 23 ECM SPECIALIST COURSE 1 Copyright AIIM.
Environmental Management Division 1 NASA Headquarters Environmental Management System (EMS) Michael J. Green, PE NASA EMS Lead NASA Headquarters Washington,
BLM Decision Making Process
Oak Ridge Office of Environmental Management Update
E-Business Suite Migration: from AIX to Exadata in 7 Months
EMS Checklist (ISO model)
What is Project Management?
Making the Business Case for Conversion
Savannah River and You: Partnering for Success
Presentation transcript:

National Governors Association Meeting LM: Ensuring a Smooth Transition – Procedures and Examples June 21-22, 2005 Dave Geiser Office of Legacy Management

2 Current Sites in Legacy Management

3 Worker Activities Worker Activities During Remediation Worker Activities After Remediation

4 Environmental Management/ Legacy Management Transition

5 Transition Goals Achieve zero service disruption for critical activities Achieve zero negative impact to closure mission or LM mission Identify programs and activities requiring transition versus termination Bring together separate EM and LM organizational initiatives Identify schedule drivers and develop an action plan for each transition element Manage actions and logic ties as a project Actively engage stakeholders in transition Complete transfer of functions as logically and early as possible

6 LM Transition Approach Establish early communications –DOE to DOE –Expand to contractor to contractor, as appropriate Site visit by LM team Establish transition plan that includes scope, cost, and schedule –An integrated EM–LM effort to the greatest extent possible –Flexible along the way, but firm end points RUN THE TRANSITION AS A PROJECT!

7 Legacy Management Transfer Tasks for “Complex” Sites

8 Weldon Spring Site – In the 1950s during Full Scale Operations

9 Weldon Spring: Disposal Cell, Interpretive Center, Prairie, and University Campus

10 Rocky Flats: Recent aerial view - prior to Final Remediation

11 Rocky Flats– Conceptual End State as the Rocky Flats National Wildlife Refuge

12 Fernald – Recent Aerial Photo (2004) during Active Remediation

Fernald – Conceptual aerial view after active remediation including GW P&T is complete.

14 LM will be ready for the EM Closure Sites to Transfer Post-closure work scope is generally within LM’s current capabilities, i.e., cell maintenance, ground water and surface water monitoring, and limited pump and treat. EM and LM have agreed to the amount of funds currently expected for post-closure operation. Management of records and information (environmental data in particular) is a significant aspect of transition and post-closure operation. Post-closure regulatory agreements and CERCLA O&M plans are tailored to the needs of the individual sites and regulators. Everyone needs to make the transition: post-closure operation means a greatly reduced workforce, fewer and less important decisions, and opportunity for controlled beneficial reuse.