TMT Presentation March 31, 2010 Scott English Water Quality Program Manager NWD Reservoir Control Center.

Slides:



Advertisements
Similar presentations
Dworshak Integrated Rule Curves/M&E Project Status Review David P. Statler – Nez Perce Tribe Project Leader.
Advertisements

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N System Condition Update Spring Operations Review Forum June 15, :00 – 2:00 p.m. To participate.
US Army Corps of Engineers BUILDING STRONG ® Mid-West Electric Consumers Association September 16, 2014 Corps of Engineers US Army Missouri River Mainstem.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Balancing an Over-Supply of Generation October 12, 2010 Public Meeting.
1 Managing Uncertainty in Generation, Inventory and Revenue January 23, 2011 AMS Meeting AMS SHORT COURSE: HYDROLOGIC PREDICTION AND VERIFICATION TECHNIQUES.
Preliminary Review of July 24 th Extreme Temperature Event & Implications for Pilot Capacity Standard Mary Johannis & Wally Gibson PNW Resource Adequacy.
US Army Corps of Engineers BUILDING STRONG ® Weather, Runoff, and Water Quality Summary Water Year 2010 Steven B. Barton, P.E. Chief, Reservoir Control.
April Runoff Forecasts for the Columbia Basin and Power Supply Implications Jim Ruff and John Fazio Council Meeting April 14, 2010 Boise, ID.
Modeling Flood Control Flexibility using the GENESYS Hydro Model Kyle Martin Mainstem Hydrologist Columbia River Inter- Tribal Fish Commission Portland,
Alan Hamlet Dennis P. Lettenmaier JISAO Climate Impacts Group and the Department of Civil Engineering University of Washington March, 2001 CIG Water Resources.
Coming Attractions from the Washington State Climate Impacts Assessment Lara Whitely Binder Alan Hamlet Marketa McGuire Elsner Climate Impacts Group Center.
31 DECEMBER VARIABLE FLOOD CONTROL DRAFT FOR LIBBY RESERVOIR U.S. Army Corps of Engineers Northwestern Division, North Pacific Region.
Yellowtail Dam & Bighorn Lake Potential Revisions to Draft Criteria Based on Comments and Operating Experience Billings, MT October 13, 2011 RECLAMATION.
Reservoir and Diversion Data CBRFC Stakeholder Forum July 31, 2012.
Overview of the draft Pend Oreille River Total Dissolved Gas Total Maximum Daily Load Paul J. Pickett, P.E. Transboundary Gas Group Castlegar, BC October.
Federal Columbia River Power System Operations Planning.
Lower Snake Modeling and LGR Monitoring Year 1 Report Summary Christopher Cook BPA Project
Canadian Columbia River Basin Forum Stephen Oliver VP Generation Supply Bonneville Power Administration November 10, 2005.
U.S. Army Corps of Engineers TMT Annual Review Weather and Water Summary Presented by Karl Kanbergs USACE, Water Management Division December 7, 2011.
Confidential – ENSR Update on Total Dissolved Gas Mitigation Measures for Boundary Dam by Kim Pate P.E. and Keith Moen P.E.
1 Mainstem Passage Strategies In The Columbia River System: Transportation, Spill and Flow Augmentation Presented By: Albert Giorgi, Ph.D.
Hydrosystem Operations and Fish Recovery in the Columbia River Basin U
Capacity Forecast Report Sean Chang Market Analysis and Design Suresh Pabbisetty CQF, ERP, CSQA Credit CWG/MCWG September 16, 2015 ERCOT Public.
Climate Change and The NW Power Supply Climate Impacts on the Pacific Northwest University of Washington April 21, 2009.
BUILDING STRONG ® PORTLAND DISTRICT 1. BUILDING STRONG ® PORTLAND DISTRICT 2 BiOp Performance Standards for Dam Passage Survival RPA RM&E Actions - Strategy.
Bonneville Spillway Flow Discrepancy TMT – August 4 th 2004 Laurie Ebner Hydraulic Engineering – Portland District US Army Corps of Engineers.
Hydro Power 102. Hydroelectric Models in the Northwest.
BUILDING STRONG ® Dworshak SOR # Transition to Refill Stephen Hall P.E., Reservoir Regulation Walla Walla District USACE.
The Louis Berger Group, Inc. A Transboundary Approach to Mitigating Total Dissolved Gas in the Columbia River Basin Mark W. Killgore, P.E.
IMPROVING MILLERTON LAKE FLOOD CONTROL OPERATIONS TO INCREASE WATER SUPPLY Mr. Antonio M. Buelna, P.E. Mr. Douglas DeFlitch Ms. Katie Lee October 29, 2009.
Dam of the Day Bonneville Dam Duffy Dessalines September 27, 2001.
The Columbia River Basin Where we’ve been. Where we’re going. October 18, 2005.
1 The Sustainability Network of Washington County January 27, 2010 Jason Eisdorfer Bonneville Power Administration.
Northwest Power and Conservation Council slide 1 The Columbia River Treaty John Shurts General Counsel Northwest Power and Conservation Council Portland,
James VanShaar Riverside Technology, inc
Status of Columbia River salmon and links to flow: What we do and do not know Presentation to Northwest Power Planning Council December 11, 2002
Howard Schaller PSMFC Annual Meeting September 24, 2013 Comparative Survival Study Outcomes – Experimental Spill Management 1.
CSS Oversight Committee ISAB November 15, 2013 Comparative Survival Study Outcomes – Experimental Spill Management 1.
Libby Dam June 2006 Spill: Total Dissolved Gas Monitoring.
Yellowtail Dam & Bighorn Lake Water Supply & Operations Meeting Billings, Montana October 9, 2008 RECLAMATION Managing Water in the West.
Fairy Lake Annual General Meeting Dave Macpherson Water Management Technical Specialist Parry Sound District Ministry of Natural Resources.
Findings of Congress The Endangered Species Act is the last resort for species at risk of extinction. Under the ESA, the National Marine Fisheries Service.
October 29, Organizational role of Short-Term Planning and Hydro Duty Scheduling Relationship to other groups in BPA Planning and analysis job.
Cost and Energy Impacts of Fish and Wildlife Operations NW Power Planning Council April 3, 2002 Boise, Idaho.
Winter Power Supply Adequacy/Reliability Analysis Power Committee Briefing October 17, 2001.
Humidity Characteristics of water Humidity Condensation.
HMTF Update TAS Nov 3-4, 2015 Kevin Harris, ColumbiaGrid TEPPC\Hydro Modeling Work Group - Chair.
NON-TREATY STORAGE AGREEMENT “Introduction to Operations and the Non Treaty Storage Scenarios” Presenter: Jim Gaspard.
Evaluation of Columbia River Sustained Hydro Peaking Capacity Eric King / Mary Johannis PNW Resource Adequacy Technical Committee Meeting May 31, 2006.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N June 2011 Non-Treaty Storage Agreement non-Binding Terms for Storage Accounts.
Progress Report Snake River Measurement Technical Committee Presented by Sean Vincent March 12, 2012.
Embankment Dam and Spillway Relative Risk Procedures (for Asset Management/Maintenance) Luc Chouinard – McGill University.
Northwest Power Planning Council Fish and Energy Impacts Resulting from Reductions in Summer Bypass Spill July 16, 2003.
Colorado Basin River Forecast Center Greg Smith Senior Hydrologist National Weather Service Colorado Basin River Forecast Center January 25, 2011 Navajo.
Group Members Tevin Walker Deidre Brown. Objectives Define the term HYDROELECTIC ENERGY To identify the use/importance of this energy source To explain.
Wanapum Dam Total Dissolved Gas Characterization Evaluation of the Wanapum Dam Fish Bypass (WFB) 2008.
TGG – History or how in …. did we get here? TGG meeting – Grand Coulee Dam October 27 th and 28 th, 2009.
1 Bonneville Power Administration. 2 BPA markets power from 31 federally owned dams, one non-federal nuclear plant, and wind energy generation facilities.
Flow Meeting 2004 Biop Litigation September 29, 2005 Jim Litchfield Montana.
Relationships Between River Variables and Salmon Survival Correlation Analysis and Box and Whisker Plots.
Water Quality Modeling of the Lower Columbia and Snake River During the 2001 Drought U.S. Army Corps of Engineers, Northwestern Division.
Northwest Fisheries Science Center Technical Management Team
Libby Flows and Kootenai River White Sturgeon
Mid-West Electric Consumers Association
Upper Snake Reservoir Operations October 13, 2015
2017 TMT Year-end Review December 12, 2017 Brandon R. Chockley
Albeni Falls Dam Operations
Winter Climate Forecast
2017 Flow, Debris, spill and TDG
Modifications to TDG Monitoring and Tracking
Presentation transcript:

TMT Presentation March 31, 2010 Scott English Water Quality Program Manager NWD Reservoir Control Center

Introduction Water Quality Standards Exemptions (Waiver & Rule Adjustment) TDG Instances Reporting

Water Quality Standards Total Dissolved Gas (TDG) & Temperature are the primary water quality parameters monitored on the mainstem Columbia & Snake Rivers in Idaho, Montana, Washington and Oregon

Water Quality Standards The state water quality standards for TDG are defined in terms of Total Maximum Daily Loadings (TMDL) USACE policy is to comply with state water quality standards to the extent practicable regarding nationwide operation of water resources projects

Water Quality Standards During the fish migration spill season (April 1 through August 31) USACE receives a waiver to the Oregon State TDG standard & a rule adjustment to the Washington State TDG standard

Water Quality Standards In 2007 both Oregon and Washington states changed their water quality standards which effect the TDG instance tracking information during spill season However, these changes to the state water quality standards were not implemented in 2009 spill season due to the 2008 BiOp litigation This condition holds true again in 2010 spill season due to roll-over operations

Water Quality Standards There are situations during the spill season when the percent TDG levels exceed these state water quality exemptions we are operating to The NWD Water Quality Team track these situations and report them to the states as instances The definitions of the causes (types) of instances has been evolving since 2003

TDG Instance Reporting From 2002 – 2008 fourteen instance types were used In 2009 the definitions were condensed from fourteen to three instance types which include all of the previous fourteen This approach will continue for the 2010 spill season reporting

TDG Instance Reporting

Type 1 Condition TDG levels exceed the TDG standard due to exceeding powerhouse capacity at run-of-river projects resulting in spill above the BiOp fish spill levels. This condition type includes: High runoff flows and flood control efforts BPA load requirements are lower than actual powerhouse capacity Involuntary spill at Mid Columbia or lower Snake river dams resulting in high TDG levels entering the lower Columbia River

Type 1a Condition Planned and unplanned outages of hydro power equipment including generation unit, intertie line, or powerhouse outages

Type 2 Exceedance TDG exceedances due to the operation or mechanical failure of non-generating equipment. This exceedance type includes: Flow deflectors unable to function for TDG abatement with tailwater elevations above feet at Bonneville Dam Spill gates stuck in open position or inadvertently left open Increased spill in a bulk spill operation to pass debris Communication errors, such as teletype were transmitted but change was not timely made or misinterpretation of intent of teletype by Project operator

Type 2a Exceedance Malfunctioning FMS gauge, resulting in fewer TDG or temperature measurements when setting TDG spill caps

Type 3 Exceedance TDG exceedances due to uncertainties when using best professional judgment, SYSTDG model and forecasts. This exceedance type includes: Uncertainties when using best professional judgment to apply the spill guidance criteria, e.g., travel time, degassing, and spill patterns Uncertainties when using the SYSTDG model to predict the effects of various hydro system operations, temperature, degassing, and travel time Uncertainties when using forecasts for flows, temperature and wind. Unanticipated sharp rise in water temperature (a 1.5 degree F. or greater change in a day) Bulk spill pattern being used which generated more TDG than expected

Reporting Mechanism The NWD Water Quality Team will track TDG instances through out the 2010 spill season. Appendix F of the Annual Dissolved Gas & Temperature Monitoring Report provides the reporting details to the states and stakeholders.

Questions?

Thank you!