Change Management (with an IT perspective). MBA2004222 Statement of Objective The object of undergoing this study-project is to develop an understanding.

Slides:



Advertisements
Similar presentations
Managing Risk CHAPTER SEVEN Student Version Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Advertisements

The Value of a Project Management Office Copyright: Kathy J. Lang, 2004.
Copyright 2010, The World Bank Group. All Rights Reserved. Statistical Project Monitoring Section B 1.
GRC SUMMIT 2013 Apr 30 - May 1, 2013 | Mandarin Oriental, Las Vegas, NV © MetricStream, Inc. |All Rights Reserved ENGAGE | INSPIRE | TRANSFORM GRC SUMMIT.
ITIL: Service Transition
Six Steps to Implementing Change Management that Works Arvind Parthiban.
Configuration Management Managing Change. Points to Ponder Which is more important?  stability  progress Why is change potentially dangerous?
Chapter 7: Managing Risk
Improving IT Governance Through Formal Change Management
McGraw-Hill/Irwin ©2008 The McGraw-Hill Companies, All Rights Reserved SECTION 12.1 PROJECT MANAGEMENT.
SE 555 Software Requirements & Specification Requirements Management.
Managing the Information Technology Resource Jerry N. Luftman
Best Practices – Overview
Remedyforce Value Enablement Kit – Change Management
Performance Monitoring All All Contracts require basic monitoring once awarded. The Goal of contract monitoring is to ensure that the contract is satisfactorily.
Remedy, a BMC Software company Change Management Maximize Speed and Minimize Risk in the Change Process.
1 Change Management FOR University Medical Group Saint Louis University Click this icon for Audio.
Problem Management Overview
ITIL: Why Your IT Organization Should Care Service Support
Problem Management ISD Division Office of State Finance.
Change Management Initiative. Definitions What is a change? – A change is the addition, modification or removal of anything that could have an effect.
Configuration Management for Transportation Management Systems Establishing and Maintaining System Integrity.
Change Advisory Board COIN v1.ppt Change Advisory Board ITIL COIN June 20, 2007.
How the Change Control Process Affects Project Quality
What is Business Analysis Planning & Monitoring?
3 Dec 2003Market Operations Standing Committee1 Market Rule and Change Management Consultation Process John MacKenzie / Darren Finkbeiner / Ella Kokotsis,
Continuing Review VA Requirements Kevin L. Nellis, M.S., M.T. (A.S.C.P.) Program Analyst Program for Research Integrity Development and Education (PRIDE)
McGraw-Hill/Irwin © 2006 The McGraw-Hill Companies, Inc. All rights reserved. BUSINESS DRIVEN TECHNOLOGY Business Plug-In B10 Project Management.
BUSINESS PLUG-IN B15 Project Management.
SERVICE MANAGER 9.2 CHANGE PRESENTATION JUNE 2011.
OSEP National Early Childhood Conference December 2007.
HOTLINE: The Value of internal Audit at Georgia Tech 1 Department of Internal Auditing.
Event Management & ITIL V3
Software Project Management
SacProNet An Overview of Project Management Techniques.
ISM 5316 Week 3 Learning Objectives You should be able to: u Define and list issues and steps in Project Integration u List and describe the components.
Quick Recap Monitoring and Controlling. 2 Monitor Project Progress and Make Corrections.
Subcommittee on Design New Strategies for Cost Estimating Research on Cost Estimating and Management NCHRP Project 8-49 Annual Meeting Orlando, Florida.
McGraw-Hill/Irwin © 2003 The McGraw-Hill Companies, Inc., All Rights Reserved. 6-1 Chapter 6 CHAPTER 6 INTERNAL CONTROL IN A FINANCIAL STATEMENT AUDIT.
M ONITOR & C ONTROL Focus is on Integrated Change Control 1.
Managing Risk CHAPTER SEVEN Student Version Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
SOFTWARE PROJECT MANAGEMENT
Project management Topic 7 Controls. What is a control? Decision making activities – Planning – Monitor progress – Compare achievement with plan – Detect.
Maintaining and Sustaining System Integrity Configuration Management for Transportation Management Systems Configuration management (CM) describes a series.
Copyright 2010, The World Bank Group. All Rights Reserved. Recommended Tabulations and Dissemination Section B.
Evaluate Phase Pertemuan Matakuliah: A0774/Information Technology Capital Budgeting Tahun: 2009.
Change Management & ITIL V3
© The Delos Partnership 2005 Dairygold Workshop Strategic Sourcing Process.
Protocol Revision Subcommittee Report to ERCOT Technical Advisory Committee September 4, 2003.
Overview PRINCE Hogeschool Rotterdam. 2 Project definition  A project is a temporary organization that is created for the purpose of delivering.
1 SCR756 – Enhancements to the MarkeTrak application –Fondly called - MarkeTrak Phase 3 –ERCOT CEO determined that SCR756 is not necessary prior to the.
GRC: Aligning Policy, Risk and Compliance
ITIL Project Change Management Workshop 7 February 2007
Configuration Control (Aliases: change control, change management )
Changing IT Managing Networks in a New Reality Alex Bakman Founder and CEO Ecora Software.
ITIL: Service Transition
Change Management Change Management.
An oil company in Canada
Software Configuration Management
BUSINESS DRIVEN TECHNOLOGY
Citrix: Proactively Addressing Enterprise Wide Access Compliance with SAP® Access Violation Management Company Citrix Systems Inc. Headquarters Ft. Lauderdale,
ITPD ISSUE MANAGEMENT PROCESS SEPTEMBER 5, 2008
The Features of a Product or System
ITIL: Why Your IT Organization Should Care Service Support
ITIL: Why Your IT Organization Should Care Service Support
GENERAL SERVICES DEPARTMENT Facilities Management Division PROOF –NM (Process Reengineering & Optimization of O&M Functions for New Mexico) Phase II.
ITIL: Why Your IT Organization Should Care Service Support
Quarterly Enterprise Collaboration Meeting
Principles of Change Management
Evaluating a Form Project Request
Presentation transcript:

Change Management (with an IT perspective)

MBA Statement of Objective The object of undergoing this study-project is to develop an understanding and orientation towards the process of Change Management; and how we can make use of Information Technology as a leveraging factor. The focus of this study project was directed towards how software-system and information technology can be used and is being applied for planning change management; and implementing it in a productive way with minimum risk involved.

MBA Change Management Change Management is the process of developing a planned approach to change in an organization. The objective is to maximize the collective benefits for all people involved in the change and minimize the risk of failure of implementing the change. It is a procedure to ensure that proposed changes are merited and will not adversely affect other elements of the plan or interdependent plans. Change must be realistic, achievable and measurable.

MBA Change Management (ITIL) Ensure there is a business reason behind each change Identify the specific services affected by the change Plan the change Test the change Formulate a back-out plan should the change result in an unexpected state

MBA Steps in Change Management process 1.Filtering requests for change 2.Assessing the impact of changes 3.Authorizing changes 4.Reviewing changes 5.Closing change requests RFC Identification Number Related Documents Affected Areas/Services Reason for Change Name of Requester

MBA Perspectives in Change Management  Financial  Technical  Business Change Management Process Control  Start  Detection  Diagnosis  Repair  Recovery  Restoration

MBA Remedy Change Management Suite Key Features  Assess the impact, risk, resource requirements  Create change plans  Automate approval functions High Visibility Change Planning Global impact of change Business services being affected Simplified Change Process Management Create change plans Track changes Monitor service levels

MBA Borland Change Management Solution Benefits of Borland Change Management Solutions  Reduced costs  Faster time to value  Lower total cost of ownership  Global impact  Increased business efficiencies & agility Key types of changes being addressed Managing requirements changes Managing processes & methodology changes Managing technology adoption changes

MBA CSC - Change Management System: GCARS Global Change Activity Request System (GCARS) is a web based Change-Toolset for Change Management procedures. Key features Define the change Track changes Formulate contingency plans Capture & qualify the business, technical, financial risks Capture appropriate levels of authorization

MBA Change Request Types and Timeline Create Provisional GCAR Submit GCAR GCAR must b submitted X business days prior to start date Draft CGAR START DATE GCAR must be approved X business days prior to start date

MBA Status of Change Request in GCARS Cancelled Changes Needing Approval Closed Completed Draft Provisional Rejected Rejected by System Reviewed Pending Scheduled

MBA Risk Assessment GCARS calculates Risk using values from the pick list items - Scope, Impact, Complexity, Severity, Users, and Location Affected. Risk values are automatically assigned when the GCAR is submitted or saved. Risk is designated as High, Medium, or Low. GCARS Search Functions  Simple Search  Structured Search

MBA Special Features in GCARS Same Server Record Locking Automatic Record Time-out GCARS Record Archiving Dynamic Change Form Close Compliance Verification Period A period of verification occurs to allow for the reporting of any post implementation problems or incidents linked with the change. Low and Medium Risk GCARS remain in Completed status for a verification period of seven consecutive days. High Risk GCARS remain in Completed status for a verification period of fourteen consecutive days. The GCARS system automatically moves the Completed GCARS to Closed status once the verification period has concluded.

MBA Recommendation When a problem errupts major services will have an immediate and severe business impact, an “emergency change” is needed. The emergency process would differ from standard process in three areas: Approval An emergency change advisory board should be developed which should act rapidly when needed. Testing The emergency change process must delay or eliminate testing of change. Failure In an emergency, change management should allow repeated attempts to make a successful change if the initial attempt fails. In an emergency restoring service is the first priority.