SUMMARY REPORT OF THE NCHRP 20-68A – US Domestic Scan Program Scan 11-02: Best Practices Regarding Performance of Accelerated Bridge Construction (ABC)

Slides:



Advertisements
Similar presentations
Precast Bent System for Bridges in Seismic Regions
Advertisements

Connection Details for Prefabricated Bridge Elements and Systems
ACCELERATED BRIDGE CONSTRUCTION (ABC): THE KEYS TO SUCCESS FROM AN OWNERS PERSPECTIVE Presented by James McMinimee, P.E., P.S.E. UDOT Chief Engineer, Director.
NCHRP Task 254 Project Vehicle Size & Weight Management Technology Transfer/Best Practices.
PCI Northeast Bridge Technical Committee Standards for Accelerated Bridge Construction Including the Northeast Extreme Tee (NEXT) Michael P. Culmo, P.E.,
SHRP2 Project R04 Bridge Designs for ABC
© GEO Secretariat The Group on Earth Observations – Status and Post 2015 Osamu Ochiai GEO Secretariat 41 st CGMS Tsukuba, Japan 8-12 July 2013.
Connection Details for Prefabricated Bridge Elements and Systems
Pavement Preservation Update By Shakir Shatnawi Chief, Office of Pavement Preservation PPTG Caltrans Co-Chair Gary Hildebrand and Casey Holloway PPTG Industry.
The Rocky Mountain Pavement Preservation Partnership Lloyd R. Neeley, P.E. Utah Department of Transportation RMPPP Vice-Chair.
District Team Training Seminar Opening Plenary Session.
Transportation leadership you can trust. presented to FHWA’s Talking Freight Seminar presented by Michael Williamson Cambridge Systematics, Inc. April.
Peggi Knight.   An AASHTO program administered by FHWA  Allows interested agencies to partner on studies of mutual interest  Sponsored/led by either.
 Project Delivery  Design Considerations  Lessons Learned.
3/10/2010 March 2010 ABC Pooled Fund Study TAC Teleconference 1.
“RAC 101” An Introduction to the AASHTO Research Advisory Committee 26 July 2010.
THE ADVANCED TECHNOLOGY ENVIRONMENTAL AND ENERGY CENTER (ATEEC) Summative External Evaluation July 1, 2013 – June 30, 2014 PRELIMINARY OUTLINE.
Schematic Design of an Accelerated Bridge Construction Project Michael P. Culmo, P.E. Vice President of Transportation and Structures CME Associates, Inc.,
Transportation Asset Management A Framework for Successful Performance-Based Planning Michael Bridges, P.E. Undersecretary – Office of Management and Finance.
Welcome to Webinar on Accelerated Bridge Construction Featured Presentation: Construction Contractor Series #3: Experiences with ABC Projects in Massachusetts.
Welcome to Webinar on Accelerated Bridge Construction Featured Presentation: Construction Contractor Series #2: Experiences with ABC Projects in Utah Sponsored.
Moving Research into Practice.  Implementation is the routine use of a SHRP 2 product by users in their regular way of doing business.  Users can include.
FHWA Next Generation Simulation (NGSIM) Program 2007 TRB Planning Applications Conference Daytona, FL May 7, 2007 James Colyar, P.E. Highway Research Engineer.
NE Regional statistics and discussion guide report Summary
By George C. Lee University at Buffalo
Welcome to Webinar on Accelerated Bridge Construction: National Perspective Sponsored by Center for Accelerated Bridge Construction (ABC) Center At Florida.
AASHTO’s Cooperative Software Development Program AASHTOWare ® Transportation Software Solutions Trnsport User Group Meeting October 2004 Mobile, Alabama.
Unit 5:Elements of A Viable COOP Capability (cont.)  Define and explain the terms tests, training, and exercises (TT&E)  Explain the importance of a.
Participating from a Distance Bringing the TRB Annual Meeting Home to the Washington State Department of Transportation Leni Oman Director Office of Research.
SCOHTS STRATEGIC PLAN Goal 5 – Workforce Development.
SHRP 2 - FIRST DEMO PROJECT KEG CREEK, IOWA R04 – “BRIDGE DESIGNS FOR RAPID RENEWAL” Sandra Larson, P.E. Iowa Department of Transportation Research and.
AASHTO and the Highway Safety Manual (HSM) A Strategic Approach to Implementation Priscilla Tobias, PE State Safety Engineer Illinois Department of Transportation.
Welcome to Webinar on Accelerated Bridge Construction Featured Presentation: 2012 Domestic Scan on ABC Connections Findings & Recommendations Sponsored.
Welcome to Webinar on Accelerated Bridge Construction Featured Presentation: State-of-the-Art Full-Depth Precast Concrete Bridge Decks Sponsored by Center.
Toolkit for Mainstreaming HIV and AIDS in the Education Sector Guidelines for Development Cooperation Agencies.
Federal Transit Administration Transit Bus Safety and Security Program Primer for State Departments of Transportation.
Activities of the National Water Quality Monitoring Council Gail Mallard, USGS NWQMC Meeting Phoenix, AZ, December 10, 2002.
ABC POLICY DEVELOPMENT IOWA DOT Norman McDonald, PE Iowa Department of Transportation Office of Bridges and Structures MID-CONTINENT TRANSPORTATION RESEARCH.
Implementation Overview SHRP 2 Oversight Committee June 18, 2012.
1 Operations Academy Senior Management Program Next Offering September 16-26, 2008.
AASHTO Technical Committee on Cost Estimating AASHTO Subcommittee on Design Annual Meeting July 20, 2009 Lesly Tribelhorn, Chair, TCCE.
Managing a Research Program from Various Funding Sources Sandra Larson, P.E. Research and Technology (R & T) Bureau Director Iowa Department of Transportation.
Welcome to Webinar on Accelerated Bridge Construction Featured Presentation: Field-Cast UHPC Connections in Full-Depth Precast Bridge Decks Sponsored by.
AASHTO TIG Ananth Prasad Chief Engineer, Florida DOT.
Overview of the “Recommended LRFD Seismic Design Specifications for Highway Bridges” Ian M. Friedland, P.E. Bridge Technology Engineer Federal Highway.
Transportation Technology Exchange Globally Presented by: Kay Nordstrom U.S. Dept. of Transportation at U.S./East Africa Workshop Arusha, Tanzania August.
Systems Accreditation Berkeley County School District School Facilitator Training October 7, 2014 Dr. Rodney Thompson Superintendent.
Consultant Advance Research Team. Outline UNDERSTANDING M&E DATA NEEDS PEOPLE, PARTNERSHIP AND PLANNING 1.Organizational structures with HIV M&E functions.
TRANSPORTATION RESEARCH BOARD WATER SCIENCE AND TECHNOLOGY BOARD TRANSPORTATION RESEARCH BOARD TRB’s Vision for Transportation Research.
Planning for School Implementation. Choice Programs Requires both district and school level coordination roles The district office establishes guidelines,
A Strategic Plan for Pavement Engineering NCHRP 20-7(223) AASHTO Joint Technical Committee on Pavements Dan Dawood, P.E. Pennsylvania Department of Transportation.
Educational Strategies Presented by: Christina Worrall Vice President, The Lewin Group, Inc PHDSC Annual Meeting March 18, 2004.
TRB’s Cooperative Research Programs Crawford Jencks Manager, National Cooperative Highway Research Program ECTRI/TRB International Research.
NTOC National Summit November 7, 2011 Washington, DC Aliyah Horton Douglas E. Noble, P.E., PTOE Aliyah Horton Douglas E. Noble, P.E., PTOE Operations:
Welcome to the 2015 Annual Meeting.  Michael Bufalino ◦ Oregon Department of Transportation ◦ Research Director.
IAEA International Atomic Energy Agency. IAEA Outline LEARNING OBJECTIVES REVIEW TEAM AMD COUNTERPARTS Team Composition Qualification PREPARATORY PHASE.
Lead Agency Viability Assessment Consistent with OPPAGA Report 04-65, DCF contracted with FMHI to assist in the design and implementation of a centralized.
Systems Accreditation Berkeley County School District Accreditation Team Chair Training October 20, 2014 Dr. Rodney Thompson Superintendent.
National Cooperative Highway Research Program Andrew C. Lemer, SPO 1 NCHRP Project 20-68A/B/C U.S. Domestic Scan Program AASHTO Research Advisory Committee.
The Georgia Department of Juvenile Justice Board of Education Presentation May 26, 2011.
Leadership Guide for Strategic Information Management Leadership Guide for Strategic Information Management for State DOTs NCHRP Project Information.
PARTNERSHIP COMMUNICATIONS STRATEGY
Technical Operations Report Board of Governors Meeting May 7-9, 2015
FHWA Updates/News Benjamin Beerman, PE Federal Highway Atlanta, GA
Multi-state Corridor Pooled Fund Program
Using State Pooled Funds to Support TRB Conferences
Support for the AASHTO Committee on Planning (COP) and its Subcommittees in Responding to the AASHTO Strategic Plan Prepared for NCHRP 8-36, TASK 138.
Natural Gas is Moving Forward
IFTA, INC. STRATEGIC PLAN
Presentation transcript:

SUMMARY REPORT OF THE NCHRP 20-68A – US Domestic Scan Program Scan 11-02: Best Practices Regarding Performance of Accelerated Bridge Construction (ABC) Connections in Bridges Subjected To Multi- Hazard and Extreme Events Presented by: Alexander K. Bardow, P.E. State Bridge Engineer Massachusetts Department of Transportation

SPECIAL NOTE: The work described in this document was conducted as part of NCHRP Project 20-68A, the U.S. Domestic Scan program. This program was requested by the American Association of State Highway and Transportation Officials (AASHTO), with funding provided through the National Cooperative Highway Research Program (NCHRP). The NCHRP is supported by annual voluntary contributions from the state departments of transportation. Additional support for selected scans is provided by the U.S. Federal Highway Administration and other agencies. This report IS NOT an official report of the National Cooperative Highway Research Program, Transportation Research Board, National Research Council, or The National Academies. This report was prepared by the scan team for Scan Best Practices Regarding Performance of Accelerated Bridge Construction (ABC) Connections in Bridges Subjected To Multi-Hazard and Extreme Events, whose members are listed herein. Scan planning and logistics are managed by Arora and Associates, P. C.; Harry Capers is the Principal Investigator. NCHRP Project 20-68A is guided by a technical project panel and managed by Andrew C. Lemer, Ph.D., NCHRP Senior Program Officer.

Scan Team Members Scan Team Chair: Jugesh Kapur, PE, SE, Washington State DOT Scan Team Members: Alexander K. Bardow, PE, Mass DOT Waseem Dekelbab PhD, PE, TRB Michael Keever, Caltrans M. Saiid Saiidi*, PhD, PE, University of Nevada, Reno Joshua Sletten, SE, Utah DOT Dan Tobias, PhD, SE, Illinois DOT W. Phillip Yen, PhD, PE, FHWA *Subject Matter Expert preparing reports and presentations

Objective  Identify connection details that are used in the United States for ABC and which have performed well under extreme events, natural or man-made, such as waves and tidal action or storm-surges, seismic events, blast, and other large forces.

Scan Team Events  Several conference calls prior, in between, and subsequent to scans  Desk Scan  Organizational meeting: November 17, 2011

Desk Scan Objective  Further the efforts of the full scan team in acquiring information of value to the transportation community.  Increase the cost-effectiveness of a full scan by advising a team where best to commit its time during travel  Help to refine the scope of the scan by identifying relevant sources of information around the country and narrowing the focus of the scan as needed.

Desk Scan Tasks  Summary review of the most relevant reports, papers, and web materials  Collect and organize amplifying questions from scan team members  Extensive survey of nine states with one or more extreme events and a known history of activities and interest in ABC  Summarize desk scan findings in a report  Recommend list of states and institutions to be visited or included in the scan through conference calls

Organizational Meeting – Nov  Refined and finalized amplifying questions  Finalized list of states and institutions to be visited or participate through conference calls  Week 1: March 25-31, 2012 Visit Massachusetts* and Florida DOTs; Web conference participation by University of Buffalo and Texas and S. Carolina DOTs  Week 2: April 22-28, 2012 Visit Utah, Washington*, and Nevada DOTs; Caltrans engineers/researchers participation while team meets in Nevada Visit University of Washington, Seattle, and University of Nevada, Reno, laboratories * Several bridge site visits in Massachusetts and Washington

Scan Meeting Participants  DOT Management Officials  Engineers  Contractors  Fabricators  Suppliers  Researchers at selected institutions studying ABC connections under extreme events

Summary of Amplifying Questions  General Issues on Design for Multi-Hazard Loading  ABC Design for Multi-Hazard Loading  Decision and Design Tools for ABC Use  Past ABC Application  Partnership with Industry and Research Institutions  ABC Inspection and Maintenance

Summary of Initial Findings 8 Topic Areas: 1. Extreme load consideration for bridges and ABC connections 2. ABC connection details 3. ABC connection maintenance 4. Standardization of ABC connection details and processes 5. ABC connection research 6. Innovative ABC connections 7. Monitoring ABC connections and prefabricated bridge elements and systems 8. Other findings

1 - Extreme Load Consideration for Bridges and ABC Connections  MH load combination considered only to a limited extent even in conventional bridges due to limited guidance and because of low probability of simultaneous occurrence  No information specific to ABC connection design under MH loading  Despite maturity of seismic design of conventional bridges, no AASHTO seismic design guidelines for ABC.  Current AASHTO Guide restriction on splicing in SDC C and D– major hurdle on ABC use in high seismic zones

1 - Extreme Load Consideration for Bridges and ABC Connections (Cont’d)  FHWA funded study to develop MH design guidelines for bridges in progress at U. of Buffalo - not specific to ABC.  AASHTO LRFD framework is used as a platform to develop MH LRFD  Examples of current MH load combination used in practice: Combined seismic and scour loads Wave action, wind, anchorage breakage, and vessel collision for floating bridge  Advanced materials should allow for higher performance levels than conventional bridges under MH loading

2 - ABC Connection Details  Many ABC connection types have been and continue to be developed  Several states use FHWA-HIF (Nov. 2011): Accelerated Bridge Construction - Experience in Design, Fabrication and Erection of Prefabricated Bridge Elements and Systems.

2 - ABC Connection Details (Cont’d)  Superstructure connection examples: Unrestrained joints under lateral loads Unrestrained joints under uplift due to storm surge Various concrete or grout mixes for closure pours for partial or full depth precast decks CIP concrete at closure pours between precast girders and at abutments. Continuous superstructure/approach slabs in SPMT moves or slides

2 - ABC Connection Details (Cont’d)  Substructure connection examples : I. Precast column embedded into drilled shaft, footing, or cap beam

2 - ABC Connection Details (Cont’d)  Substructure connection examples (Cont’d) : II. Grouted couplers embedded in precast column or in pile shaft, footing, or cap beam

2 - ABC Connection Details (Cont’d)  Substructure connection examples (Cont’d) : III. Precast columns with extended bars inserted in grouted metal sleeves

3- ABC Connection Maintenance  Insufficient history to make a call (if maintenance issues are different for ABC connections)  General perception: should not be different if ABC connections are emulative (verified by a few ABC projects built in the 1990’s)  In one state ABC projects are inspected annually to address any issues and develop performance data base

3 - ABC Connection Maintenance (Cont’d)  Precautionary measures to avoid maintenance problems, e.g. “greased and sheathed” tendons, plastic ducts, post- tensioning of deck panels, etc.  Importance of grout quality, application, and consolidation is recognized.  Deck slabs post tensioned together  States are aware of the need for inspection and maintenance manuals when using unconventional materials and details.

4 - Standardization of ABC Connection Details and Processes  Standard ABC connections: There is a strong push from stakeholders to standardize ABC connections Philosophical differences: well-defined details vs. versatile details  Standard decision making process for selecting ABC over conventional construction Consistent application of user costs

4 - Standardization of ABC Connection Details and Processes (Cont’d)  Examples of manuals for standard details: PCI – Northeast Several states utilizing FHWA 2011 ABC report Manuals for each precast element type Manuals for SPMT moves List of preapproved grouted couplers

4 - Standardization of ABC Connection Details and Processes (Cont’d)  Standard decision making process for selecting ABC over conventional construction  National effort: Oregon study  Many states have or are developing their own process  User costs are generally included and can help justify ABC  Initial ABC cost may be higher because of financial risk to contractors; could become lower over time because of saving in duration- dependent costs

5 - ABC Connection Research  On-going studies on high-early strength concrete for closure pours  Other ABC connection research focused on seismic performance  Seismic studies may serve as a guide for other extreme load studies  Two categories of seismic ABC connection research: emulative and non-emulative

5 - ABC Connection Research (Cont’d)  Successful emulative ABC connections Precast columns embedded into footings, piles, or cap beams Large diameter column bars embedded in corrugated metal ducts Various standard couplers Various methods to convert multi-girder pier cap connections to integral pier caps  Research continues

5 - ABC Connection Research (Cont’d)  Successful non-emulative ABC connections Motivated by versatility of precast members Performance level exceeds conventional construction Post-tensioned segmental columns

5 - ABC Connection Research (Cont’d)  Successful non-emulative ABC connections (Cont’d) Energy dissipation with advanced materials and details: e.g. shape memory alloys, HPC, built-in rubber, FRP wrapping, and concrete-filled steel and FRP tubes  Research continues FRP WrapConc.-Filled FRP TubeBuilt-in Rubber

6 - Innovative ABC Connections  ABC is innovation in CONSTRUCTION  Other innovation possible through ABC  Innovative precast double-T precast girders  Folded plate girders  Concrete-filled tube arches  Post-tensioned bridge decks, abutments, cap beams  Base isolation to simplify ABC connections  FHWA-HFL good mechanism to bring innovation to practice

7- Monitoring ABC Connections and Prefabricated Bridge Elements  Done on a selected basis for non- emulative connections  May not be necessary for emulative ABC connections  Short-term monitoring common in SPMT moves  Frequent (annual, in addition to NBIS biennial) inspection of ABC bridges

8 - Other Findings  High enthusiasm and interest in ABC  Key to success in ABC: COMMUNICATION among top management, designers, contractors, fabricators, industry and public  Early involvement of contractors and fabricators in design and planning - design-build projects provide such an opportunity  Site casting has to be used when precast plants are remote  Shift of role: from CONSTRUCTION to INSTALLATION - contractors need to be open

8 - Other Findings (Cont’d)  Education and training needed for ABC connection design and inspection  ABC design manuals are being integrated into state bridge design manuals  Documenting ABC lessons is essential. Examples: Convert circular columns to octagonal shape to cast on the side Avoid multi-segment columns unless necessary Transport issues of short heavy segment (load has to be spread over many axles)

Recommendations  Continue research into MH load combinations and ABC connections. Initiate NCHRP project to synthesize this research, fill knowledge gaps and develop design procedures for AASHTO LRFD.  Establish a full time national center on ABC under MH as a central resource for collecting on-going research, detailing, construction and ABC performance both long term and after MH  Build on FHWA Everyday Counts vision to reach out to AGC, decision makers, and others to promote ABC

Recommendations (Cont’d)  Expand demonstration ABC projects through the FHWA IBRD program in areas with extreme event loads  Continue research on emulative ABC connections to facilitate ABC use in areas of high seismicity and other extreme events  Continue and expand research on ABC connections with advanced materials and details under MH loading  Collect and interpret field data of ABC connection performance. Explore integration of effort with FHWA LTBP

Implementation Actions  Seminars and webinars at venues attended by bridge engineers, contractors, suppliers, fabricators, etc., such as AASHTO SCOBS, TRB Annual Meeting and TRB conferences, and websites (FHWA, NCHRP , Florida IU ABC site)  Identify champions in relevant AASHTO Technical Committees and follow up on implementation of recommendations  Form an ABC user group to bring together various stakeholders  Express support for current FHWA MH loading studies to FHWA management

Implementation Actions (Cont’d)  Problem statement to develop Performance Based Design guidelines of emulative and non-emulative ABC connections  Garner support for a national center on ABC under MH loading  Technical articles summarizing the scan findings for publication in the TRB TR News and other industry journals  Coordinate with FHWA and others to help implement the scan recommendations