Topic 3: Variety Postponement September 2006. Agenda for the day: 1. Review assignment and lecture on postponement. 2. Hewlett Packard Case.

Slides:



Advertisements
Similar presentations
Dr. Ron Tibben-Lembke SCM 461
Advertisements

What other terms can you think of when talking about Procurement and Inventory Management?
Strategic Decisions (Part II)
Delayed Product Differentiation
Global Sourcing, or “What’s a ‘Supply Chain?’”
Strategy & Strategy into Action.
Hewlett-Packard: DeskJet Printer Supply Chain
Location Strategy and Layout Strategy
1 Process Management and Strategy Introduction 1Ardavan Asef-Vaziri Sep-09 Process -1 Business Process Management Building block of Operations Management.
Enterprise Business Processes and Applications (IS 6006) Masters in Business Information Systems 9 th Dec 2008 Fergal Carton Business Information Systems.
Operations Management & Performance Modeling
Building Competitive Advantage Through Functional-Level Strategy
Supply Chain Management Managing Material Waiting Time
Generalizations from Polaroid
Design for Supply Chain Management Phil Kaminsky David Simchi-Levi Philip Kaminsky Edith Simchi-Levi.
Coordinated Product and Supply Chain Design
Supply Chain Enablers Organizational Infrastructure
Reasons for Inventory To create a buffer against uncertainties in supply & demand To take advantage of lower purchasing and transportation cost associated.
INVENTORY AND WAREHOUSING PL201 FUNDAMENTAL OF LOGISTICS MANAGEMENT
Functional Versus Innovative Products
OPSM 301 Operations Management Class 3: Process selection Koç University Zeynep Aksin
1 Managing Flow Variability: Safety Inventory Centralization and ROP At- Ft; Decentralized vs. Centralized.
1 Managing Flow Variability: Safety Inventory Centralization and ROP.
Consumer Retailer Manufacturing Material Flow VISA ® Credit Flow Supplier Wholesaler Retailer Cash Flow Order Flow Schedules The Supply-Chain.
Manufacturing Planning and Control
Manufacturing Processes
9. Coordinated Product and SC Design Case: HP Desk-jet Printer Supply Chain (Read pages ) HP-founded in 1939 Electronic test and measurement equipment.
Chapter 9 Design for Supply Chain Management
McGraw-Hill/Irwin  The McGraw-Hill Companies, Inc. 2007, All Rights Reserved PROCESS SELECTION Chapter 4.
Design for Logistics Chap 08 王仁宏 助理教授 國立中正大學企業管理學系 ©Copyright 2001 製商整合科技中心.
Designing & Managing The Supply Chain
Postponement How to respond to demands for –Customized products –Rapid delivery –Competitive prices in the face of short product lifecycles.
Utdallas.edu/~metin 1 HP DeskJet Printers Supply Chain A case on Basestock Levels and Postponement.
Supply Chain and Logistics Management
Inventory/Purchasing Questions
Slides 6 Distribution Strategies
INVENTORY IS BAD. DIRECT FINANCIAL EFFECTS Pay money to get Place to Store Equipment to move DAMAGE - OBSOLESCENCE INCREASED CYCLE TIME Less flexibility.
Global Supply Chain Management and Uncertainty Sources: Dornier et al., GOL, 1998 Flaherty, GOM, 1996.
Giving Yourself Options – Using Oracle Assemble To Order (ATO) Bob Collins, CFPIM, CIRM SSI North America Chicago, IL August 15, 2003.
Accurate Response Technique that allows companies to match supply and supply in a uncertain environment.
HP DeskJet Case: Background  High volume, high speed manufacturing in Vancouver  Many different models, all completed in Vancouver  Three distribution.
FACILITIES PLANNING ISE310L SESSION 5 Chapters 2_3, September 8, 2015 Geza P. Bottlik Page 1 OUTLINE Questions? Comments? Quiz Stories or experiences with.
Toney L Ferguson M.B.A.,M.PM..  Demand  Forecasting  Inventory Management.
SCM-INTRODUCTION P.CHANDIRAN. What is a Supply Chain? Supply chain is a network of suppliers, manufacturing plants, warehouses, distribution centers,
ElecComp Case Large contract manufacturer of circuit boards and other high tech parts. About 27,000 high value products with short life cycles Fierce competition.
PUSH, PULL AND PUSH-PULL SYSTEMS, BULLWHIP EFFECT AND 3PL
Real-time management of inventory for items Inventory Concept LOGISTIC & WAREHOUSING.
Real-time management of inventory for items Inventory Concept LOGISTIC & WAREHOUSING.
Logistics Management LSM 730 Lecture 8 Dr. Khurrum S. Mughal.
1 Managing Flow Variability: Safety Inventory Centralization and ROP A key component has a cost c = 10, holding cost h (for the period) = 1, salvage value.
Introduction to Supply Chain Management Designing & Managing the Supply Chain Chapter 1 Byung-Hyun Ha
Intelligent Supply Chain Management Strategic Supply Chain Management
Modeling the Costs and Benefits of Delayed Product Differentiation Eren Anlar.
Drum –Buffer-Rope Skorkovský Based on : R. Holt, Ph.D., PE.
Delayed Product Differentiation
Main Function of SCM (Part I)
FACILITIES PLANNING ISE310L SESSION 4 January 25, 2016 Geza P. Bottlik Page 1 OUTLINE Questions? Comments? Quiz Stories or experiences with supply chains?
MIS Topic # 2 1 Demand Management. MIS Topic # 2 2 Definitions: Demand Management: the function of recognizing and managing all demands for.
Homework 1- Gateway.
BIA 674 supply chain analytics Lecture 2b
Chapter 10: Coordinated Product and Supply Chain Design
The Desk Jet Supply Chain
Shorter life cycles make timing crucial
Challenges in Managing Supply Chains
Drum –Buffer-Rope Skorkovský Based on : R. Holt, Ph.D., PE.
Topic 6 – Logistics and Supply Chain Management
GEOP 4355 Distribution Networks
Drum –Buffer-Rope Skorkovský Based on : R. Holt, Ph.D., PE.
OUTLINE Questions? Comments? Quiz next Tuesday Assignments reminders
Global Sourcing, or “What’s a ‘Supply Chain?’”
Presentation transcript:

Topic 3: Variety Postponement September 2006

Agenda for the day: 1. Review assignment and lecture on postponement. 2. Hewlett Packard Case

Key Ideas/Tools from Yesterday 1. Smart extrapolation method: regression analysis 2. Accurate Response 3. Managing uncertainty requires shorter lead times, inventory buffers and better forecasting.

The Pyramid of Supply Chain Excellence Customer Value Fast, Flexible Operations (Avoid Uncertainty) Inventory (Hedge Against Uncertainty) Accurate Forecasts (Reduce Uncertainty)

Effective postponement requires matching decouple points with product design. 1. Where do you locate the decouple point in the supply chain? 2. Can you redesign the product to match the decouple point?

Effective Postponement

Two Alternative Supply Chain Designs Production System RM Production System RM FG Make-to-Order Make-to-Stock RM = raw material & part inventories FG = finished good inventories Advantages: Disadvantages:

Two Alternative Supply Chain Designs Production System RM Production System RM FG Make-to-Order Make-to-Stock RM = raw material & part inventories FG = finished good inventories Minimizing production and transportation costs -Finished good inventory availability -Forecasting -Product variety -Product mix stability Minimizing supply and demand mismatch costs -Lead time -Raw material inventory availability -Order variability/seasonality/capacity -Set-up times Primary Advantage: Management Challenges:

Postponement is a hybrid approach Example: Assemble-to-Order WIP Decouple Point ? ? ? ? Component Production Sub- assembly Final Assembly Retailing Decouple point:the point at which the system changes from make-to-stock to make-to-order Customer name attached to order Inventory held to reduce lead time

Locating the decouple point Place decouple point after steps with: –Large scale economies –Long lead times –High set-up costs Place decouple point before steps with: –Variety fan-out –High variable cost content WIP

Examples of Decouple Points Component Manufacturing Sub- Assembly Final Assembly DistributionRetail

Steps to re-design the product.

Inventory-Service Crisis at HP The Crisis: Inventory Imbalance –excess inventory in some product options –shortages in other product options Contributing Causes –many product options due to geography –long DC replenishment lead time –highly uncertain market –inflexible design: difficult to rework one option to make it another –out of control inventory system –uncoordinated functional interests; conflicting incentives

Longer Term Alternatives for HP Alternatives: Air Shipment European factory Universal model Lower product variety Forecasting methods Shorter review period More inventory Driver: Leadtime Variability Review period Fill rate Effectiveness: Too expensive Volume? Design costs Lost revenue? Too difficult Transport costs Right trade-off?

What Happened at HP? Deskjet re-designed to be DC-localizable (postponement). Implementation in early Millions of dollars saved from inventory reduction, service improvement, and freight reduction. Innovative packaging won patents. All Vancouver products now DC-localizable (postponement). Vancouver as showcase for “Design for Localization/Postponement” -- Best practices spreads to other HP divisions.

HP Printers: Distributor Customization Partial Final Assembly Component Assembly Add Local Materials WIP Add Local Materials WIP Add Local Materials WIP Factory US Distribution Asian Distribution European Distribution Full Final Assembly Component Assembly Factory US Distribution Asian Distribution European Distribution Before Postponement After Postponement

Costs and Benefits of DC Localization Stocks of localization materials higher at DCs Potential freight reduction Investment to install localization capability at DCs Quality assurance Procurement of localization materials Value of local “manufacturing” Potential for other products Customs and duties implications Green effects

Implementation Issues R&D resistance –Product works, why change it? DC resistance –Requires new capabilities and objectives Additional costs –Product redesign –Increased cost of modular product –DC efficiency vs. plant efficiency –Shipping costs

Lutron: Different Views of Mass Customization Design Manufacture Components Assemble Manufacture Components Assemble WIP Assemble Rework Manufacture Components FG Assemble Manufacture Components FG Special Products Lighting Panels Flourescent Ballasts Standard Products

Apple Powerbook: User Customization Put your "personal cool" on your PowerBook 1400 Wood: Redwood burl, Corellian Birch burl, Walnut Brushed aluminium and Brushed copper Leather: black, grey boarskin, yellow, red, burgandy Blue denim We will have BookCovers for other PowerBooks in June!

Benetton: Process Reversal Knit & Assemble SpinDye Spin Knit & Assemble Before Process Reversal After Process Reversal Days Weeks Days Weeks Days

Tomorrow: Platform planning Pizza Postponement Assignment is due.