CUTTING ROOM… A STUDY FOR PROBLEM IDENTIFICATION AND SOLUTION.

Slides:



Advertisements
Similar presentations
STOCK CONTROL Inventory is often referred to as the graveyard of business because over investment in stock is a frequent cause of business failure.
Advertisements

1 Capacity Management Capacity has a cost, whether it is used or not.
Leather Goods Manufactory Department Distribution
Textiles – Jazzy Hat Project
NAME CLASS HOMEWORK. Collect a range of theme images depending on what images you want on your bag.
Operating the Harmonizer
Engineer Training Media Feeder TJ8300 / TJ8500 Media Feeder.
Quilting Vs. Patchwork H276 Ms. Haushalter. What is Quilting? Quilting: is the together of two layers of fabric and an in- between layer of padding with.
Lecture 11 Spreading. Spreading… 1. Shade sequence / Shade Card 2. Correct ply direction 3. Alignment of plies 4. Correct Ply tension 5. Fabric faults.
PRESENTED BY: NEHA SAMDANI PRAJJWAL DEWASKAR M.ftech-3 rd sem PRESENTED BY: NEHA SAMDANI PRAJJWAL DEWASKAR M.ftech-3 rd sem.
Sharp CV Multifunction cutter for Tensile Membrane Fabrics
Parts and Functions of a Conveyor System ©2012 Dr. B. C. Paul Note- These slides include figures and tables taken from the Conveyor Equipment Manufactures.
Cleaning, sorting and grading of Potato
STRIP LAYOUT for BLANKING TOOL.
Pattern Layout, Pinning & Cutting
Unwinding module is designed for unwinding of laminate tape, for its steering, for the cutting of the necessary width and for the easy feeding of material.
Ventura Automation Services Inc.  Loop Length/Production DAQ System  Server  RS-485 to RS-232 Converters  KnitForce  KnitForce Software.
QC in Knitted Production Part 2: Process Control
LADDER SAFETY.
TOOL: Radial Arm Saw NEXT STEP: Radial Arm Saw RESULTS: Finish Top Apron Pieces at 9” L x 4” W x ¾ “ Th PROJECT Square Plant Stand PART Top Apron # NEEDED.
Chapter 2 Lumber.
Mantle Clock. Beginning Steps Cut 2 piece 20 x 5 to make the 2 sides and top/bottom Cut 1 10 ¾ and 1- 9 from each 20 piece. This will make a side and.
Teen Living Notes Competency: Basic fashion construction procedures to produce personal clothing & home accessories.
Gages Unit 14.
Basic Tool Safety and Equipment
Support Programs version 2 March 2010 Cleaning and Sanitation
Engineering Statistics Chapter 4 Hypothesis Testing 4B Testing on Variance & Proportion of Variances.
Name: ___________________
Lecture 17 Cutting Department. Marker making….  Efficiency of marker = (Area of patterns in marker plan / Total area of the marker plan) X 100.
Left side Right side Note pad Roll block. The Plan.
BASICS OF PRODUCTION SYSTEMS
Darkroom and Film Processing Rad Tech A – Week 9 Fall 2010.
Preproduction Operations: marker making, spreading, and cutting
Example Two identical point sources produce water waves with a wavelength of 0.04 m. The sources are 0.1 m apart. What is the maximum angle for a line.
Manufacturing Solutions- Weaving TexManage. Modules TexManage Manufacturing Solutions- Weaving Manufacturing Modules Production Management Grey Ware House.
Charging Cart Instruction & User Manual EnTrans Technology Co., Ltd.
IET 330 Industrial Design Group 4 Improving Efficiency and Productivity at SealMaster Elizabeth McClain Richard Cantrell.
1 Part 3 Getting Ready to Sew. 2 Stay Organized Gather all your notions and supplies Double-check the steps to take Press after each construction step.
GCSE Textiles Exam The Basics…
BY Sajan Moharana Ashwani Rao. Problems……………… Checks is that the repeating size is not constant but variable. If the repeat is not constant, we cannot.
1 64 Using a Pattern Chapter 64 Page Steps to Sew  1- Prepare the pattern  2- Prepare the fabric  3- Lay out the pattern pieces and cut the.
MH...CH LECT-021 SYSTEMS CONCEPT Adopting a materials handling systems from overall optimization point of view. Adopting a materials handling systems.
CAD CAM. 2 and 3 Dimensional CAD: Using 2-dimensional CAD software, designers can create accurate, scaled drawings of parts and assemblies for designs.
PICTURE BASED PRESENTATION. Prepared By : Mazadul Hasan sheshir ID: th Batch (Session : ) Department : Wet Processing Technology.
Basic Slide Show Under Tile Spooled Heating Installation Guide.
Kaeser Compressors, Inc.
by Mr. JP Salimäki Area Sales Manager
Winch Dyeing machine.
Knit Dyeing Machines.
Industrial Machinery.  The machine opposite is a lock stitch machine.  It only does a basic straight stitch.  Different specialist machines do other.
WORK STUDY HOW THE TOTAL TIME OF A JOB IS MADE UP (IE411)
Dr. Subhash Technical Campus
What is a Planer? A Planner is used to bring the thickness of a work pieces to a desired size and to surface the top and bottom faces of a board smooth.
MSME  Micro small and medium enterprises
Rip vs. Cross-Cut Rip – cuts along the wood grain
Lecture on THE QUALITY CONTROL PROCEDURE
Process Layout Chapter #6.
Cutting.
Basics of Garment Manufacturing
“GARMENT PRODUCTION SYSTEM”
Marker Making Definition:
Seacork® instalation 07/11/2018.
PRODUCTION PLANNING AND CONTROL
Electric braking Powerpoint presentation by:- Poonam sharma
Machine parts and Functions
CAD CAM.
COMMERCIAL MANUFACTURING PRACTICES
Apparel Production Overview
Presentation transcript:

CUTTING ROOM… A STUDY FOR PROBLEM IDENTIFICATION AND SOLUTION

CUTTING ROOM

P ROCESS FLOW FOR SOLIDS CUTTING CUT PARTS SEND TO WAREHOUSE INSPECTION WORK ON CUT PARTS (OPTIONAL) BUNDLING TICKETING CAM CUTTING SPREADING ON AUTOMATIC SPREADER

P ROCESS FLOW FOR YARN DYED CUTTING SENDING TO WAREHOUSE INSPECTION CUTTING TRACING OF PATTERN ON BLOCK LAYING CUTTING OF BLOCKS OPENING OF FABRIC ROLL

I MPORTANT STEPS & OBSERVATIONS I N C UTTING ROOM

F ABRIC INSPECTION & AUDIT DEPARTMENT OBSERVATIONS :  Fabric inspection is done for each and every roll from a batch. Inspection is done for the fabric faults and to check the width of each roll of fabric. But it was observed that every bundle was not being checked for the width.  Mostly due to workers being uneducated about faults many times roll with faults are passed over to audit department.  Sometimes due to lac of knowledge defected fabric is passed and for the same reason less defected fabric is bundled under defected category.  No humidity and temperature measuring instruments are available.  GSM of fabric is taken without drying it.  No instruction is given to rolling operator about the dimension of fabric to be cut for GSM measurement.  GSM of roll is taken from very localized fabric area i.e. from the same part of roll instead of taking from different areas of roll.

SUGGESTIONS : o Proper lighting should be provided. o Improper inspection table. o Insure fault highlighting stickers are properly sticked to the fabric of roll.

. E ACH AND EVERY FABRIC ROLL MUST BE CHECKED FOR WIDTH AT LEAST TWO TIMES ; AT START OF ROLL AND AT MIDDLE OF IT.

C ORRECT INFORMATION REGARDING ROLL MUST BE FED IN SLIP.

I T MUST BE TRIED TO CHECK THE GSM OF EACH ROLL OF FABRIC. UNDER STRICT SUPERVISION.

E MPLOYEE EDUCATION IS VERY NECESSARY HERE.

S AMPLES OF DEFECTED FABRICS OR PHOTOGRAPHS OF THEM SHOULD BE MADE AVAILABLE TO OPERATOR.

D UE TO EXCESS HUMIDITY AND TEMPERATURE, THERE IS MORE RELAXATION ALLOWANCES FOR WORKER WHICH DECREASES OVERALL ON STANDARD TIME.

D UE TO MOISTURE CONTAMINATION OBSERVED GSM OF FABRIC MAY VARY FROM ACTUAL ONE.

D UE TO UNSPECIFIED DIMENSION OF CUT PART WHICH IS UTILIZED FOR GSM MEASUREMENT LEADS TO FABRIC WASTAGE.

F ABRIC AUDIT DEPARTMENT : OBSERVATIONS :  In fabric audit department 3-4 rolls are checked for width and gsm of the fabric along with the fabric fault.  Many time GSM of the fabric changes from roll to roll and also in the same roll.  Same thing happens with the width of the fabric.  But as each bundle is not checked these faults pass unnoticed to cutting room

S UGGESTION :  Cut part which is choosen for GSM measurement should be taken from different location of fabric roll and avg of different measurement should be marked as GSM of fabric.  Width of the fabric should be taken from different phases of fabric roll ie 1 st check when 15 mts are roll is finish. 2 nd measurement should be taken at middle of rolling process and third at last.

F ABRIC WAREHOUSE OBSERVATIONS :  Fabric comes to warehouse from audit department with audit report.  Fabric is stored according to buyer’s name  There is no check of fabric prior to storage in the warehouse.  Fabric is not segregated according to width or gsm of fabric.  Rolls of fabric do not have ‘width’ and ‘gsm’ information on them

R ELAXATION OBSERVATIONS : No proper relaxation machine. Machine that is used does not have proper attachments. Fabric handle is done manually. This causes fabric disturbance and relaxed fabric gets ruffled.manually. No accountability in this department. No standard way of fabric storage after relaxation processfabric storage

S UGGESTIONS : Spiral rollers should be used instead of plain rollers. Tray should be used in which fabric is collected and loaded to spreading machine along with the tray,in order to avoid distortion in fabric structure. Proper accounting of relaxed rolls should be done.

P ROPOSED E ASING M ACHINE VIDEO

process video of ideal spreader machine Oshima Serkon F.N

S PREADING – SOLIDS ( AUTOMATIC ) ( OBSERVATIONS ) Used speed of machine is very low in the range of 7m/min; running speed being higher. Target is not achieved even after excess operators being implied on spreader. More than optimum lay length being laid. Lack of attachments Lack of attachments in the spreading machine. Lack of specific data of rolls leads to off time. Improper handling of fabric. On table no 3 lays are aligned from one side of table only because of its more widthone side of table only

S PREADING – YARN DYED Excessive manpower allocated in this department. Hand shears is used instead of end cutters leading to increase of manpower need. In yarn dyed spread length is generally for a single piece of shirt leading in the need of excessive manpower for laying

S HIFTING OF THE LAY TO CUTTING TABLE : While shifting of lay from spreading table to the cutting table air floatation table is not used properly. On table number 3 plies are aligned from only one sideby the operator which causes difference in size of patterns.

Suggestions:

D ECREASE RUNNING SPEED OF SPREADER TO AVOID TURNING OF PLIES UPSIDE DOWN.

K EEP LENGTH OF SPREAD BETWEEN 7-8 M. T HIS WILL HELP IN FASTER AND PRECISE LAY.

O NE OPERATOR SHOULD ALWAYS TRAVEL ALONG WITH THE MACHINE TO FIX ANY BLOCKAGE IN THE PASSAGE OF LAYING. A T THE BEGINNING ITSELF. BLOCKAGE

S PIRAL ROLLERS SHOULD BE USED INSTEAD OF PLANE SURFACE ROLLERS. T O INSURE EVEN LAY

. T WO DIFFERENT LAYS OF TUBULAR KNITS CAN BE SPREAD AT A TIME TO UTILIZE MAXIMUM WIDTH LAYING CAPACITY OF SPREADER

C ONTINUES … Spreading operator have no data about width of roll which causes spreading of rolls with different widths,this will createloss of fabric as marker is made according to roll of minimum width.different widths loss of fabric Due to this sometimes whole plies related to one role has to be taken off which decreases efficiency of spreaderplies related to one role has to be taken off which decreases efficiency of spreader Replace hand shears with end cutters. This will decrease labor requirement from 4 to 2.and will also increase efficiency of lay. Instead of laying for single piece one can make a block for two piece and after laying block can be cut and operated separately. Beforeshifting of lay make sure that air flotation is on and running at highest level. This will decrease tension in lay due to pulling and also distortion in lay.

C UTTING – SOLIDS & YARN DYED All the previous process have an impact on cutting of the fabric. Machine stoppage due to lack of feed is high. Many times change in the width and gsm of the fabric leads to increase in idle time of auto cutter. Machine stoppage for maintenance is high and frequent. Cutting of yarn dyed fabric is done by straight knife & shears

S TUDY CONSIDERING WORKER & OPERATOR

1 st / Improper water supply. ie chilled water is not available which sometime increases relaxation allowance and worker rating decreases so as production.

U NHYGIENIC CONDITION NEAR WAREHOUSE AND WORKER PLACE OF EATING WHICH INCREASES ABSENTEEISM % DUE TO FREQUENT DISEASES DUE TO URINALS IN VICINITY

N O TEMPERATURE AND HUMIDITY MEASURING INSTRUMENTS IN FABRIC PROCESS DEPARTMENT.

C LASSES SHOULD BE ORGANIZED TO MAKE WORKERS AND OPERATORS REALIZE THAT STAKE OF THEM AND COMPANY IS ’ NT DIFFERENT.

M OTIVATIONAL AND RECREATIONAL CAMPS SHOULD BE ORGANIZED IF FEASIBLE.

C UT PARTS INSPECTION For checking of prints instead of measuring with tape we can have pattern of print to insure its right alignment. panel print pattern