Economic evaluation of the information provided by PRIMEFLO about the localization of obstructions in pipelines San Donato Milanese June 28 th 2004.

Slides:



Advertisements
Similar presentations
The Role of Pilots Alex Bryson Policy Studies Institute ESRC Methods Festival, St Catherines College, Oxford University, 1st July 2004.
Advertisements

LCC YUSUF OZ FATIH BOLUKBAS HUSEYIN ANIL KARABULUT.
9-0 Chapter 9: Outline Net Present Value The Payback Rule The Discounted Payback The Average Accounting Return The Internal Rate of Return The Profitability.
DSC 3120 Generalized Modeling Techniques with Applications
REMOTE MEASUREMENT OF STRESS IN FERROMAGNETIC PIPELINES Motivation Ageing global pipeline infrastructure Non-invasive, remote, pipeline integrity assessment.
Designing Influential Evaluations Session 5 Quality of Evidence Uganda Evaluation Week - Pre-Conference Workshop 19 th and 20 th May 2014.
Fiducianet, inc. tm 1 Presented by H. Michael Warren, President fiducianet, inc. VoIP Technology Perspectives Law Enforcement Concerns & CALEA Compliance.
Claims Reserving for Non Life Insurance Craig Thorburn, B.Ec., F.I.A.A. Phone
Engineering Economic Analysis Canadian Edition
Presenting DFA Results to Decision Makers Spring 2008 Midwest Actuarial Forum.
Chapter 10 Quality Control McGraw-Hill/Irwin
1 © 1998 HRL Laboratories, LLC. All Rights Reserved Construction of Bayesian Networks for Diagnostics K. Wojtek Przytula: HRL Laboratories & Don Thompson:
QM Spring 2002 Business Statistics Introduction to Inference: Hypothesis Testing.
Model Building and Simulation Chapter 43 Research Methodologies.
Lecture 10 Comparison and Evaluation of Alternative System Designs.
Chapter 14 Risk and Uncertainty Managerial Economics: Economic Tools for Today’s Decision Makers, 4/e By Paul Keat and Philip Young.
Steps towards low-risk pipeline inspection Alberto Di Lullo Flow Assurance Engineering Technologies Manager.
Copyright © 2003 Pearson Education, Inc. Slide 5-1 Chapter 5 Risk and Return.
Part III Exchange Rate Risk Management Information on existing and anticipated economic conditions of various countries and on historical exchange rate.
ERP DATA ACQUISITION & PREPROCESSING EEG Acquisition: 256 scalp sites; vertex recording reference (Geodesic Sensor Net)..01 Hz to 100 Hz analogue filter;
Sociology 3322a. “…the systematic assessment of the operation and/or outcomes of a program or policy, compared to a set of explicit or implicit standards.
National 4 Lifeskills Geometry and Measures Numeracy Managing Finance and Statistics N4.
National 5 Lifeskills.
Probabilistic Mechanism Analysis. Outline Uncertainty in mechanisms Why consider uncertainty Basics of uncertainty Probabilistic mechanism analysis Examples.
SIMULATION USING CRYSTAL BALL. WHAT CRYSTAL BALL DOES? Crystal ball extends the forecasting capabilities of spreadsheet model and provide the information.
Expandable Technologies –Economic evaluation of the installations
Methodological Problems Faced in Evaluating Welfare-to-Work Programmes Alex Bryson Policy Studies Institute Launch of the ESRC National Centre for Research.
Classification Overview. Hubbard Decision Research The Applied Information Economics Company Overview  A classification chart is one type of bootstrapping.
Linked NHA Tables-Examples Background The National Health Accounts (NHA) is a standardized methodology that describes flow of funds through the health.
Engineering Economic Analysis Canadian Edition
1 Managerial Economics Fundamental Economic Concepts Marginal analysis: Analyse the additional (marginal) benefit of any decision and compare it with additional.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Estimating Project Volatility Lecture.
© 2004 Veritec Solutions Inc. All Rights Reserved. Estimating the Impacts of Revenue Management Decisions 4 th Annual INFORMS Revenue Management and Pricing.
Investment Analysis and Portfolio Management First Canadian Edition By Reilly, Brown, Hedges, Chang 6.
Adviser: Frank, Yeong-Sung Lin Presenter: Yi-Cin Lin.
In Chapter 4: Budgeting the Project Budgeting: the process of forecasting what resources the project will require. Cost estimating process: evaluating.
Flow Margin Assumptions for NTS Planning and Development Transmission Planning Code Workshop 3 5 th June 2008.
Simulation is the process of studying the behavior of a real system by using a model that replicates the behavior of the system under different scenarios.
Capital Budgeting.
QM Spring 2002 Business Statistics Probability Distributions.
FIN 614: Financial Management Larry Schrenk, Instructor.
APC Opportunity Management Training1January 2006  Seven logical stages  Aligned with the Account’s buying stages  Illustrates how we sell, interact.
Rome, july 5, 2006 Observing project implementation and conducting project analysis (UVER) Presentation by Luigi Guerci.
Machine Design Under Uncertainty. Outline Uncertainty in mechanical components Why consider uncertainty Basics of uncertainty Uncertainty analysis for.
Author: Tadeusz Sawik Decision Support Systems Volume 55, Issue 1, April 2013, Pages 156–164 Adviser: Frank, Yeong-Sung Lin Presenter: Yi-Cin Lin.
Chapter 20 Classification and Estimation Classification – Feature selection Good feature have four characteristics: –Discrimination. Features.
FORECASTING METHODS OF NON- STATIONARY STOCHASTIC PROCESSES THAT USE EXTERNAL CRITERIA Igor V. Kononenko, Anton N. Repin National Technical University.
Summary of Previous Lecture Understand why ranking project proposals on the basis of IRR, NPV, and PI methods “may” lead to conflicts in ranking. Describe.
King Faisal University [ ] 1 Business School Management Department Finance Pre-MBA Dr Abdeldjelil Ferhat BOUDAH 1.
Approaches to quantifying uncertainty-related risk There are three approaches to dealing with financial and economic risk in benefit-cost analysis: = expected.
Computer Simulation Henry C. Co Technology and Operations Management,
QMT 3033 ECONOMETRICS QMT 3033 ECONOMETRIC.
CAPITAL BUDGETING TECHNIQUES
Factors for Decision Making
Quantitative Methods Varsha Varde.
Software Project Management
Decision Theory Dr. T. T. Kachwala.
Senato della Repubblica - Italy
12 Inferential Analysis.
Forecasting Exchange Rates
GDP growth estimates for Europe at 30 days
A. Mancusoa,b, M. Compareb, A. Saloa, E. Ziob,c
Chemical Reaction Engineering II Note 4
GDP growth estimates for Europe at 30 days
EPQ Learner Outcomes identify, design, plan and complete an individual project, applying a range of organisational skills and strategies to meet.
12 Inferential Analysis.
Decision Trees ADVANTAGES:
Chapter 7: Introduction to Sampling Distributions
When do we make decisions?
Presentation transcript:

Economic evaluation of the information provided by PRIMEFLO about the localization of obstructions in pipelines San Donato Milanese June 28 th 2004

2Introduction PRIMEFLO is a new technology for the internal inspection of pipelines and tubings capable of localizing deposits and obstructions in a non-invasive, low cost and low risk way PRIMEFLO measurements are performed by generating fast flow-rate transients at one end of the pipe, recording the resulting pressure signals and applying mathematical processing Processing Unit Flow rate Transient Pressure sensors Eni E&P EniTecnologie

3 Application considered in the analysis Push or disperse the deposit Push by solvent injection (S) Build-up of a complete obstruction in a pipeline Some possible solutions Pipeline cut and substitution (T) C = 0.2 M€ t = 20 gg C = 4.4 M€ t = 100 gg Eliminate the (section of) line containing the deposit

4 Common economic evaluation: “a posteriori” Complete obstruction S Complete substitution Selective substitution Movable Non movable Effective Not effective Obstruction not localizable or distributed Obstruction localized X X C = 0.2 M€ t = 20 d C = 4.4 M€ t = 100 d C = 3.9 M€ t = 90 d C = 4.4 M€ T = 100 d C = 0.2 M€ T = 20 d C = 4.2 M€ T = 80 d ? ? Decision points supported by PRIMEFLO ? Solvent Injection Line cut Without PRIMEFLOWith PRIMEFLO IS IT RIGHT ?

5 Limits of the economic evaluation “a posteriori” The economic evaluation “a posteriori” (comparison between the repair costs with and without PRIMEFLO) is not meaningful or appealing when the information provided by PRIMEFLO: 1.simply confirm the planned intervention procedure 2.lead to the worst case, e.g. the pipeline abandonment owing to the repair costs 3.(for monitoring) indicate the absence of anomalies and, therefore, no need for intervention Need to develop a quantitative methodology for the evaluation of the information provided by PRIMEFLO independently from the outcome of any particular case

6 Logic of the economic evaluation New methods to perform ACTIVITIES Impact on ACTION Economic evaluation A POSTERIORI New methods to obtain INFORMATION Impact on DECISION Economic evaluation A PRIORI Evaluate AFTER performing actions Evaluate BEFORE making decisions PRIMEFLO

7 “Practical” Decision maker w/o PRIMEFLO Complete obstruction Solvent injection Line cut S Complete substitution Selective substitution Movable Non movable Effective Non localized obstruction Localized obstruction X X C = 0.2 M€ t = 20 d C = 4.4 M€ t = 100 d C = 3.9 M€ t = 90 d C: Repair costs t: Time to repair time Non effective 100%  50%  50% 100%

8 “A priori” economic evaluation Value of the information estimated “a priori” = 0.9 M€. Considering the investment for developing PRIMEFLO (0.7 M€), the analysis indicates a positive R&D return even for the application to this single “average” case. Value of INFO = (Costs w/o INFO - Costs w INFO) when who decides makes MISTAKES P INTRINSIC (S)  P W/O PRIMEFLO (T | best=S)  Cost (T, W/O PRIMEFLO) – P INTRINSIC (S)  P W PRIMEFLO (T | best=S)  Cost (T, W PRIMEFLO) P W PRIMEFLO (T | best=S) = (1)  P W/O PRIMEFLO (T | best=S)   PRIMEFLO information completeness:  = 1  impossible mistaking ! Value= P INTRINSIC (S)  P W/O PRIMEFLO (T | best=S)  (  Cost (T, W PRIMEFLO) + COSTS) = 50%  50%  [90%  3.9 M€ + 50%(0.5 M€)] = 0.94 M€

9Conclusions An economic evaluation of the PRIMEFLO information has been applied, based on the residual probability to make mistakes, without reference to the outcome of any particular case This also allows to estimate the economic value of the level of completeness/accuracy of the provided information To be quantitative, the method requires statistical data about possible system states in order to define their intrinsic probabilities We still have to ascertain the possibility of extending this methodology to other cases related to information-providing technologies

10 Corso Magenta, Milano - Italy phone fax webhttp://