C. Rossi – L4 Project Meeting 3 March 2011 Status and Plans of 3 MeV Test Stand.

Slides:



Advertisements
Similar presentations
LINAC4 and 3 MeV test stand at CERN
Advertisements

Laboratori Nazionali di Legnaro (Italy) DTL design status A. Pisent.
Areal RF Station A. Vardanyan RF System The AREAL RF system will consist of 3 RF stations: Each RF station has a 1 klystron, and HV modulator,
Areal RF Station A. Vardanyan RF System The AREAL RF system will consist of 3 RF stations: Each RF station has a 1 klystron, and HV modulator,
Progress of the sub-harmonic bunching system (i.e. upgrading progress of BEPCII present bunching system) Pei Shilun for the SHBS team Accelerator center,
H. Haseroth July 26 – August 1, 2004 NuFact04, Osaka 1 The 3 MeV H - Test Stand at CERN - The first part of the SPL - H. Haseroth on behalf of the SPL.
Experience with Bunch Shape Monitors at SNS A. Aleksandrov Spallation Neutron Source, Oak Ridge, USA.
R. Corsini, CLIC Project Meeting - 24 th May 2013 CTF3 1 CTF3: Highlights of the 1 st run R. Corsini for the CTF3 Team 1.
MEBT & RT CH Section Thomas Page Fermilab Accelerator Advisory Committee May 10 th – 12 th, 2006.
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
Front End Test Stand Klystron Commissioning Alan Letchford UKNF Plenary Meeting 22 nd April 2009.
Managed by UT-Battelle for the Department of Energy SNS MEBT : Beam Dynamics, Diagnostics, Performance. Alexander Aleksandrov Oak Ridge National Laboratory.
ESS DTL beam commissioning
LINAC4 STATUS Alessandra M. Lombardi for the LINAC4 team 1.Motivation and goals 2.Status of Linac4 2 years after official start of the project ( )
Proton driver front end test stand Plans and organisation for 2004–05 David Findlay ISIS Accelerator Division STVLTVS EST QVI ACCELERATORIBVS CVRANDIS.
Low Emittance RF Gun Developments for PAL-XFEL
ASTRA Injector Setup 2012 Julian McKenzie 17/02/2012.
HINS 6-Cavity Test 3 Month Plan Jan 12, Current Schedule 2-3 day shutdown scheduled to start Jan 18 (Wednesday) to upgrade BPM system and reinstall.
STF status Mar.22,2005 H. Hayano, KEK. STF Phase 1 Test Accelerator DC gun : 200kV CsTe photocathode for quick start UV(262nm) Laser (337ns spacing, 2820bunches)
1 Linac4 Overview M. Vretenar, SLHC Meeting, Motivations 2.Layout 3.Main parameters 4.Schedule 5.Status.
Anders Sunesson RF Group ESS Accelerator Division
January 5, 2004S. A. Pande - CAT-KEK School on SNS MeV Injector Linac for Indian Spallation Neutron Source S. A. PANDE.
Alexander Aleksandrov Oak Ridge National Laboratory
PROTON LINAC FOR INDIAN SNS Vinod Bharadwaj, SLAC (reporting for the Indian SNS Design Team)
Ding Sun and David Wildman Fermilab Accelerator Advisory Committee
Project X Injector Experiment (PXIE) Sergei Nagaitsev Dec 19, 2011.
Accelerator Science and Technology Centre Extended ALICE Injector J.W. McKenzie, B.D. Muratori, Y.M. Saveliev STFC Daresbury Laboratory,
ICFA-HB 2004 Commissioning Experience for the SNS Linac A. Aleksandrov, S. Assadi, I. Campisi, P. Chu, S. Cousineau, V. Danilov, G. Dodson, J. Galambos,
Overview and Status of the Fermilab High Intensity Neutrino Source R&D Program Giorgio Apollinari for Bob Webber.
0 Plenty Energy Clean Environment Healthy Life Commissioning and Initial Operation of the KOMAC 100-MeV Proton Linac KOMAC / KAERI Kyung-Tae Seol
Linac4 Status 1 M. Vretenar sLHC public event
LIU Day – 11 th april 2014 ALESSANDRA LOMBARDI LINAC4 COMMISSIONING OVERVIEW.
Comparison of Fermilab Proton Driver to Suggested Energy Amplifier Linac Bob Webber April 13, 2007.
LINAC4 and the Upgrade of the LHC Injector Complex R. Garoby 26 February, 2013.
A Few Pointers from the Linac4 Beam Commissioning of Warm Linac Yngve Levinsen Beam Physics Section 05/02/16.
K.Hanke / TDR Meeting / 13 June 2006 Linac 4 Diagnostics L4: K. Hanke, M.Pasini (requirements, specifications, integration) AB/BI: U.Raich et al. (technical.
3 MeV test stand measurement plans A. Lombardi for the LINAC4 team 10/01/2013BCC MeV test stand measurements1.
F DOE Annual Program Review High Intensity Neutrino Source R&D in the Meson Detector Building Bob Webber & Giorgio Apollinari September 26, 2007.
1 CTF3 CLEX day July 2006 CLEX day 2006 Introduction G.Geschonke CERN.
THE LINAC4 RFQ – Experience with Design, Fabrication and Tuning C. Rossi and the RFQ Project Team GSI Review – 20 November 2013.
LINAC4 emittance measurements BI Day Divonne, 24 th November 11/24/2011 B.Cheymol, E. Bravin, D. Gerard, U. Raich, F. Roncarolo BE/BI 1.
Linac4 status and long-term schedule M. Vretenar, Project Meeting  status  timeline  open issues  status  timeline  open issues.
Wolfgang Vinzenz FAIR Proton Linac 10 th FAIR MAC November 25 th and 26 th 2013 Proton Linac 1 Status Buncher Design  Rectangular design, longitudinal.
PXIE Beam Instrumentation Status Update – Preparing for MEBT 1.1 Beam Vic Scarpine Feb. 9, 2016.
DTL prototype summary and production sequence F.Grespan LNL _06_22 CDR.
1. Baseline – from LMC  Presentation by F. Bordry at LHC Machine Committee 5.10 on LS1 Organisation: 1. Linac4 is not going to be connected.
M. Munoz April 2, 2014 Beam Commissioning at ESS.
Programme for the Physics Start-up Stable and radioactive beams Jose Alberto Rodriguez, BE-OP-PSB (167538)
PIP-II Beam Instrumentation Vic Scarpine PIP-II Machine Advisory Committee Meeting March 2016.
ILC R&D Activities at KEK Superconducting Linac Development Beam-handling Technology Development.
ESS Front End diagnostic
3 MeV Measurements at Lianc4 1 Veliko Dimov (for the source and linac team) (J-B Lallement, J. Lettry, A. Lombardi, D. Fink)
Bunch Shape Monitor for HINS Wai-Ming Tam Project X Collaboration Meeting September 11, 2009.
Areal RF Station A. Vardanyan
Linac4 & SPL Status of preparation and Opportunities M. Vretenar (R
Linac4 status and perspectives
Experience with beam instrumentation at Linac4
Linac4 M. Vretenar for the Linac4 design team
Linac4 Beam Characteristics
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
Physics design on Injector-1 RFQ
LINAC 4 source & LEBT measurement results
LINAC4 commissioning plans etc.
Pulsed Ion Linac for EIC
Advanced Research Electron Accelerator Laboratory
commissioning and measurements
FAIR pLinac RFQ Meeting pLinac RF Power Sources
RF systems introduction
(Beam) Commissioning Plan
Status of the JLEIC Injector Linac Design
Presentation transcript:

C. Rossi – L4 Project Meeting 3 March 2011 Status and Plans of 3 MeV Test Stand

C. Rossi – L4 Project Meeting 3 March 2011 The 3 MeV Test Stand is installed in the PS South Hall extension (building 152)

C. Rossi – L4 Project Meeting 3 March 2011 Activities at the Test Stand in 2010 Source Operation Impossible to operate the ion source with H - at 45 kV extraction voltage Characterize the source for p extraction at 45 kV to allow RFQ and partial MEBT commissioning

C. Rossi – L4 Project Meeting 3 March 2011 Activities at the Test Stand in 2010 Source Results with protons The energy spread of the beam is not larger than 400 eV (50 eV per mm) => ± 200 eV => ± 0.4 % Pictures from O. Midttun’s presentation Slit 1 mm Sol 600 A

C. Rossi – L4 Project Meeting 3 March 2011 Activities at the Test Stand in 2010 MEBT line completed With 3 rd buncher cavity

C. Rossi – L4 Project Meeting 3 March 2011 Activities at the Test Stand in 2010 RF installation progress 2nd buncher amplifier installed

C. Rossi – L4 Project Meeting 3 March 2011 Activities at the Test Stand in 2010 PIMS prototype tested

C. Rossi – L4 Project Meeting 3 March 2011 Activities at the Test Stand in 2010 PIMS prototype tested dayT RF com.P peak T pulse vacuumX-ray axis X-ray ext 2010[h][μs][mbar][mSv/h][μSv/h] klystron running stable, thermal test started kW7605 · kW8004 · kW8004 · Nominal gradient of 4 MV/m reached with 700 kW Table courtesy of R. Wegner

C. Rossi – L4 Project Meeting 3 March 2011 Activities related to the Test Stand in 2010 Movable Test Bench Design of Test Bench completed; Design of all components completed; Fabrication started for all components; Start of assembly in May.

C. Rossi – L4 Project Meeting 3 March 2011 Characterize the beam properties at 3 MeV: At the RFQ exit in the Linac4 Test Stand (late 2011 and beginning of 2012) At the chopper line output in the Linac4 Test Stand (during 2012) At the chopper line output in the Linac4 Tunnel (early 2013) Characterize the beam properties at 12 MeV: At the DTL tank1 output in the Linac4 Tunnel (first half 2013) Transverse planeLongitudinal plane  Beam profiles  Beam emittances  Beam position  Transverse halo  Transmission  Average beam energy  Energy spread  Bunch shape profile  Chopping efficiency (time resolved and integrated) From: G. Bellodi - User Specification for Linac4 Test Bench Diagnostics Activities related to the Test Stand in 2010 Movable Test Bench

C. Rossi – L4 Project Meeting 3 March 2011 Activities related to the Test Stand in 2010 RFQ fabrication and measurement

C. Rossi – L4 Project Meeting 3 March 2011 Module 1 completely brazed, final machining still to be performed: Activities related to the Test Stand in 2010 RFQ fabrication and measurement

C. Rossi – L4 Project Meeting 3 March 2011 Module 3 passed 1 st brazing, now is being machined for 2 nd brazing. Activities related to the Test Stand in 2010 RFQ fabrication and measurement

C. Rossi – L4 Project Meeting 3 March 2011 Planning to RFQ completion Activities related to the Test Stand in 2010 RFQ fabrication and measurement RF measurement stepweek T2 after assembly14-15 (2/04) T2 after 1 st brazing19-20 (9/05) T3 after 2 nd brazing19-20 (9/05) T2 after 2 nd brazing29-30 (18/07) RFQ assembly35-36 (1/09) Fittings (tuners, power coupler, end plates)tbd RFQ completely assembledas from 44 (31/10)

C. Rossi – L4 Project Meeting 3 March 2011 Continue measurements and development of the ion source; Complete the infrastructure for the RFQ and Movable Test Bench installation (cabling, cooling); Perform the interlock system installation; Assemble the Movable Test Bench; Complete equipment installation (buncher amplifier(s), LLRF equipment, beam diagnostics, power supplies); Equip the control room; Perform the RFQ final tuning; Perform the RFQ RF commissioning. The Test Stand equipment will be moved to Linac4 at the beginning of Activities at the Test Stand in 2011