Vibration issues for SuperKEKB M. Masuzawa, R. Sugahara and H. Yamaoka (KEK) Vibration issues for SuperKEKB (IWAA2010)

Slides:



Advertisements
Similar presentations
1 Vibrations studies at KEKB/Belle KEK Hiroshi Yamaoka.
Advertisements

Alexander Temnykh Cornell University, Ithaca NY, USA
Recent observations of collective effects at KEKB H. Fukuma, J. W. Flanagan, S. Hiramatsu, T. Ieiri, H. Ikeda, T. Kawamoto, T. Mitsuhashi, M. Tobiyama,
Nano-Beam Scheme for SuperKEKB Andrew Hutton Slides taken from talks by Haruyo Koiso, Yukiyoshi Ohnishi & Masafumi Tawada.
Development of a mover having one nanometer precision and 4mm moving range Y. Morita, S. Yamashita ICEPP, University of Tokyo Y. Higashi, M. Masuzawa,
IR Magnets for SuperKEKB KEK, Norihito Ohuchi 1.IR Magnets (ES, QCS, QC1) 2.Interference between Magnet-Cryostats and Belle 3.Summary SuperB.WS05.Hawaii.
1 IR Vacuum M. Sullivan MAC Review Jan , 2006 M. Sullivan for the Machine Advisory Committee Review January 18-20, 2006 IR Vacuum.
Super-B Factory Workshop January 19-22, 2004 Beam pipes M. Sullivan 1 Detector Beam Pipe Diameter Discussion M. Sullivan Super-B Factory Workshop Hawaii.
Super-B Factory Workshop January 19-22, 2004 Accelerator Backgrounds M. Sullivan 1 Accelerator Generated Backgrounds for e  e  B-Factories M. Sullivan.
Beam-beam studies for Super KEKB K. Ohmi & M Tawada (KEK) Super B factories workshop in Hawaii Apr
Super-B Factory Workshop January 19-22, 2004 Super-B IR design M. Sullivan 1 Interaction Region Design for a Super-B Factory M. Sullivan for the Super-B.
Vibration of the Support Tube: Luminosity Lost and Found Alan Fisher, Jim Turner, Franz-Josef Decker, Mike Sullivan, Clive Field
1 Optics and IR design for SuperKEKB Y.Ohnishi 1/19-22, 2004 Super B Factory Workshop in Hawaii.
Radiation-protection experience at Belle / summary of beam abort system 22 September, 2003 T.Tsuboyama (KEK)
Analysis of ATF EXT/FF Orbit Jitter and extrapolation to IP (Data of ) ATF2 Project Meeting K. Kubo.
Vibration measurements on the final doublets and the Shintake Monitor Benoît BOLZON7th ATF2 project meeting, 16/12/08.
Update of the ground motion generator of A. Seryi for ATF2 thanks to ground motion measurements in the ATF2 beam line 1 Benoît BOLZONATF2 software task.
Concepts for Combining Different Sensors for CLIC Final Focus Stabilisation David Urner Armin Reichold.
Alignment and Beam Stability
Quad-to-quad correlated motion in FLASH Ramila Amirikas, Alessandro Bertolini DESY Hamburg XFEL beam dynamics meeting, February 25 st 2008.
Supports and Movers for ATF2 Magnets R. Sugahara KEK France and Japan Collaboration Meeting Feb , 2006.
October 4-5, Electron Lens Beam Physics Overview Yun Luo for RHIC e-lens team October 4-5, 2010 Electron Lens.
J. Turner 02/07/05 SLAC PEPII Accelerator Physics LER WIGGLER PLAN J. Turner, M. Donald, M. Sullivan, U. Wienands, J. Yocky Motivation and Concerns Details.
1 H. Yamaoka R. Sugahara M. Masuzawa IR stability at SuperKEKB June 14, ‘10 H. Yamaoka.
1 BROOKHAVEN SCIENCE ASSOCIATES Stability Issues NSLS-II PAC Meeting May 24, 2007 S. Krinsky.
QF1 vibration status A.Jeremie A.Jeremie, N.Geffroy, drawings by Araki-san.
Experience on Vibration Isolation System R. Sugahara KEK and Mika Masuzawa (1), Hiroshi Yamaoka (1), Yasuo Higashi (1) Yuichi Morita (2) and Satoru Yamashita.
Vibration Stability Studies of a Superconducting XFEL/ILC Accelerating Module at Room Temperature and at 4.5K R. Amirikas, A. Bertolini, W. Bialowons.
NLC - The Next Linear Collider Project SLAC tunnel motion and analysis Andrei Seryi SLAC Originally given at The 22nd Advanced ICFA Beam Dynamics Workshop.
Tsukuba-hall webcam 1 Beam Pipe and Vertex Detector extraction: on Nov. 10, 2010 Belle Detector Roll-out: Dec. 9, 2010 End-caps, CDC, B-ACC, TOF extraction:
1 SiD Push-pull Plans Marco Oriunno, SLAC International Workshop on Linear Colliders 2010 Geneva, October 2010 M.Oriunno, IWLC10 – Geneva, Oct.2010.
NLC - The Next Linear Collider Project Mike Woods May 1999 Vibrations and the NLC IR Welcome to the NanoWorld !
How high frequency we care if we need the stabilization of 1nm level?
Main beam Quad Stabilisation: Status of the stabilisation test program at CERN CLIC-stabilization day S. Janssens Contribution to slides by:
1/13 Tatsuya KUME Mechanical Engineering Center, High Energy Accelerator Research Organization (KEK) ATF2-IN2P3-KEK kick-off meeting (Oct. 9, 2006) Mount.
Passive isolation: Pre-isolation for FF quads A. Gaddi, H. Gerwig, A. Hervé, N. Siegrist, F. Ramos.
Simulation on beam loss from radiative Bhabha process Y. Funakoshi KEK.
5m GM measurement at ATF-floor and the reference system Sep. 19,’03 KEK H. Yamaoka P1(x,y,z) P2(x,y,z) N.
Beam Dynamics IR Stability Issues Glen White / SLAC September IRENG07 Vibration tolerances for final doublet cryomodules Settlement of detector.
Superconducting final doublet Support A.Jeremie. SC magnet steps Motivation: have an active stabilisation as planned in ILC and CLIC => need to evaluate.
1 KEK Hiroshi Yamaoka Vibration analysis of the ILD QD0-support system Oct, 2 nd '09 KEK H. Yamaoka - Results of Vibration analysis - Coherency measurement.
Electron cloud study for ILC damping ring at KEKB and CESR K. Ohmi (KEK) ILC damping ring workshop KEK, Dec , 2007.
ATF2: final doublet support Andrea JEREMIE B.Bolzon, N.Geffroy, G.Gaillard, J.P.Baud, F.Peltier With constant interaction with colleagues from KEK, SLAC.
G.R.White: F.O.N. T. From Ground Motion studies by A.Seryi et al. (SLAC) ‘Fast’ motion (> few Hz) dominated by cultural noise Concern for structures.
Chigasaki Research Institute J-Power / Electric Power Development Co.,Ltd. Ground Motion Measurement in Accelerator Test Facility at KEK ・ KEK ・ ICEPP.
Transverse and Longitudinal Wave Behaviors Physics 7(C)
Compensation of Detector Solenoid G.H. Wei, V.S. Morozov, Fanglei Lin JLEIC Collaboration Meeting Spring, 2016.
Experimental study on heat transfer through a few layers of multilayer insulation from 300 K to 4.2 K Zhanguo Zong, Norihito Ohuchi, Kiyosumi Tsuchiya,
SUPERKEKB MAIN RING TUNNEL MOTION M. Masuzawa, T. Adachi, H. Iinuma, T. Kawamoto and Y. Ohsawa, KEK Tsukuba, Japan
1 Investigation of vibration properties of the KEKB tunnel after the Great East Japan Earthquake Contents Situations after the earthquake Geological survey.
Initial Study of Synchrotron Radiation Issues for the CEPC Interaction Region M. Sullivan SLAC National Accelerator Laboratory for the CEPC14 Workshop.
HLS Installation at KEKB Main Ring after the Great East Japan Earthquake Takashi Kawamoto, Mika Masuzawa, Ryuhei Sugahara High Energy Accelerator Research.
Polarized Proton Acceleration in the AGS with Two Helical Partial Snakes October 2, 2006 SPIN 2006 H. Huang, L.A. Ahrens, M. Bai, A. Bravar, K. Brown,
Alignment and stability session
From Beam Dynamics K. Kubo
ATF2 Status N.Terunuma, KEK
Yingshun Zhu Design progress of QD0 in CEPC Interaction Region
Beam jitter experiment of exchanging power supplies
KEK news ( ) S.Tanaka.
Laboratories in Annecy working on Vibration Stabilization
Large Booster and Collider Ring
Status of Vibration Analysis
Jim Crittenden Electron Cloud/Impedance Meeting 27 May 2015
Waves and Oscillation waves transport _________ along a medium without transporting ________.
1/10 prototype support tube
Interaction Region Design Options e+e- Factories Workshop
IP configuration session
Floor Movement Measurement at ATF Ring
Orbit Bumps in PEP-II to Maximize Luminosity
Some of the Points Raised During my JLAB Visit
Presentation transcript:

Vibration issues for SuperKEKB M. Masuzawa, R. Sugahara and H. Yamaoka (KEK) Vibration issues for SuperKEKB (IWAA2010)

Contents Vibration issues for SuperKEKB (IWAA2010) 1.What is SuperKEKB? See slides that I presented on Monday 2.Vibration measurements at KEKB Measurements at various locations & components since Some presented at IWAA2004. more recent data. 3.What to do

1. What is SuperKEKB Vibration issues for SuperKEKB (IWAA2010) Y (vertical) Z(Beam direction)  y ~ 1  m YZ view of the beam at the IP KEKB  z ~ 6 mm  y ~ 0.07  m  z ~ 6 mm Will such thin beams collide stably?? We’d better re-evaluate the vibration and take a closer look. SuperKEKB

2. Vibration measurements at KEKB tunnel Vibration issues for SuperKEKB (IWAA2010) Especially around the Interaction Region (IR) where the very small beams collide. Especially around the Interaction Region (IR) where the very small beams collide.

Purpose of the measurements To characterize the vibrations. Where is it that vibrates? – Magnets – Supporting table – Floor At which frequency? – Characteristic frequencies With what amplitude? – Will it cause a serious degradation in the machine performance? Vibration issues for SuperKEKB (IWAA2010)

KEK environment D3 D9

KEK environment Measured by R.Sugahara et.al (KEK Report ) D9 KEK >> Spring-8 KEK >> Spring-8 D3 (road side) > D9 (field side) D3 (road side) > D9 (field side) Clear day & night effects seen day > night 3Hz Clear day & night effects seen day > night 3Hz

Sensors We use six acceleration sensors (MG-102S, Tokkyo-kiki Corporation). Each sensor measures one direction, 3 sensors used to measure (X,Y,Z). 2 sets of sensors, one set usually on the floor and the other on the magnet, for example. Servo Accelerometer MG-102 Acc. 0.1 ~ 400Hz Acc. 60dB = 1gal/V Size40×40×50mm Max. input ±2G±2G Resolution 1/ 10 6 G Vibration issues for SuperKEKB (IWAA2010)

Measurements KEKB Interaction Region (IR) *Power Spectrum Density (PSD) plots *Integrated amplitude (vs frequency) plots Data taken in June 2009, when Belle solenoid, QCS and the ring magnets were turned off. Vibration issues for SuperKEKB (IWAA2010)

~3Hz : characteristic frequency of the soil, called “Kanto loam,” around KEK. Induced by human activities, mainly vertical vibration. Day & night effects and weekend effects have been observed. 0.2~0.3 Hz: Ocean waves & wind. Depends on the weather, mainly in horizontal vibration. Tunnel floor 0.3 Hz 3 Hz 0.3 Hz and 3 Hz peaks understood.

Tunnel floor ~8Hz peak PSD H.Yamaoka Vibration issues for SuperKEKB (IWAA2010) 500kg QC2RP 1250kg QC1RE 1370kg

Vibration issues for SuperKEKB (IWAA2010) 500kg QC2RP 1250kg QC1RE 1370kg Cryostat for Final Focusing Superconducting Magnets, supported by just one end. IR tunnel floor Movable table All the IR magnets on the movable table & the movable table vibrate at 8Hz. Most important final focus Q probable vibrates…

Vibration issues for SuperKEKB (IWAA2010) Cryostat for Final Focusing Superconducting magnets (QCS),supported by just one end. The vibration amplitude is probably larger Near the IP !! Displacement sensors To measure the distance Between cryostat and BELLE

LX RX ± 1  m The ~4 Hz motion is in phase.  BELLE is the one that is vibrating, not cryostat. The ~8 Hz motion is not in phase. >Cryostat is moving. 1 second Vibration issues for SuperKEKB (IWAA2010) 1 second ± 1  m LX RX 4Hz (R&L in phase) 8Hz Cryostat motion with respect to BELLE has 4 Hz and 8Hz peaks. Displacement sensors To measure the distance Between cryostat and BELLE

Out of phase In phase ± 15  m “1” in Japanese seismic Intensity scale. I did not feel anything. Vibration issues for SuperKEKB (IWAA2010) A good collision condition maintained by orbit FB system was lost, resulting in beam loss. A good collision condition maintained by orbit FB system was lost, resulting in beam loss. Earth quake!

Measurements on BELLE (1300 ton!) and indeed BELLE was shaking at 4Hz Vibration issues for SuperKEKB (IWAA2010) Cryostats (& therefore final focusing superconducting quad) vibrate a lot when earth quake hits the area at 8Hz at 4Hz (Left side and right side cryostat modules vibrate in phase)

Measurement locations (12/28/2009) 1300 tons H.Yamaoka Vibration issues for SuperKEKB (IWAA2010)

4 Hz peak grows toward the top BELLE PSD H.Yamaoka Vibration issues for SuperKEKB (IWAA2010)

9nm 12nm 18nm 196nm 301nm 93nm 25nm 17nm 20nm 248nm 354nm 80nm 14nm 27nm 19nm 204nm 254nm 121nm 10nm 12nm 9nm 102nm 68nm 72nm 3nm 2nm 8nm 67nm 52nm 82nm BELLE Amplitude 4 Hz peak grows toward the top H.Yamaoka Vibration issues for SuperKEKB (IWAA2010)

Measurement results - First resonance is around ~3-4Hz. - Amplitude on the barrel is bigger than on the table. - Amplitude on the End-Yoke increases toward the top. 150tonnes - The Belle detector is not fixed to the floor. - The barrel yoke is just placed on the table. - Top of the end-yoke is not fixed. Improvements/modification are being discussed. H.Yamaoka

Summary QC1RE QCS-boat Movable table KEKB tunnel floor Belle-stand B4 floor KEKB tunnel at the IP vibrates at ~ 0.3 Hz in the horizontal direction (micro- seismic) ~3 Hz in the vertical direction & horizontal direction (resonance of the “Kanto loam” soil around KEK) In addition, magnets, the movable table and the cryostat vibrate at ~ 8Hz. Vibration issues for SuperKEKB (IWAA2010)

Summary BELLE detector vibration First resonance is measured around ~3-4Hz, mainly in horizontal directions. -Amplitude on the barrel is bigger than at the table. - Amplitude on the End-Yoke increases going towards the top. Vibration issues for SuperKEKB (IWAA2010)

Summary (vibration amplitude) The vibration amplitudes of the IR magnets are much smaller than the size of the colliding beams (~1  m vertically & ~ 100  m horizontally) for KEKB but comparable for SuperKEKB. Vertical vibration of ~0.1 μm at QC1 ⇒ COD of ~σy at the IP The two beams will not collide well at SuperKEKB if we do not do anything. Summary table by H.Yamaoka

3. Strategy : What to do Progress in understanding the characteristics of the IR vibration are being made. We understand where the 8 Hz (IR) and 4 Hz (BELLE) come from. How to reduce the vibration of IR components & BELLE? ⇒ Being discussed/investigated. Support structure of the final focusing superconducting magnets. Single-arm support is a bad idea but easier when assembling. ⇒ Work with the BELLE-II group is necessary. ⇒ The SuperKEKB IR design has not been finalized yet, which makes our evaluation more difficult. Vibration issues for SuperKEKB (IWAA2010)

3. What to do Feedback system to maintain a good collision condition! ⇒ There was a collision orbital FB system called “iBump system” at KEKB, which worked very well. But it was a slow system (1Hz at most, which is limited by the BPM speed). Faster vibration was not a problem as beam size >> vibration amplitude at higher frequencies. At SuperKEKB, a faster orbital (collision) feedback system is needed. ⇒ From the vibration measurements at KEKB, the required speed of the orbital FB system is around 50 Hz. (Not as fast as bunch-by-bunch FB system.) FB is our present choice, not an active (or passive) anti- vibration system. Vibration issues is critical. Vibration issues for SuperKEKB (IWAA2010)