Development Contributions Witzenberg Municipality 30 October 2013.

Slides:



Advertisements
Similar presentations
 Review of Servicing Initiative Mandate  Sanitary Sewer Concept  Storm Sewer Concept  Water Main Concept  Principles of A Joint Servicing Agreement.
Advertisements

EMBU WATER & SANITATION CO. LTD (EWASCO) A BRIEF CASE STUDY ON COMMERCIAL FUNDING AND ITS IMPACTS CONTENTS BACKGROUND STATUS AS AT JULY 2005 PROJECT FUNDING.
Integrated Strategic Development Framework KNYSNA | STATUS QUO | OCTOBER 2013 CIVIL SERVICES, ROADS AND TRANSPORTATION KNYSNA | INTEGRATED STRATEGIC DEVELOPMENT.
1. 2 Municipal Management Districts (MMD) are special districts that are: Self governed, but must be approved by the host municipality; and have the.
Challenges of Urbanisation for Sanitation Infrastructure in Lesotho By : Palesa Monongoaha Project Manager - WASCO.
Central Massachusetts Regional Stormwater Coalition Part 2 Sump Pump Discharge Policy September 26, 2013 Community Innovation Challenge Grant 2013.
What do Civil Engineers do? Design Civil Infrastructure Roadworks Earthworks Stormwater Management.(Including Detention & Quality Measures) Sewer Water.
SERVICE TAX 1. As per Explanation to Section 65 (105) (zzzza) of the Finance Act, 1994, the term works contract” means a contract wherein,— (i) transfer.
DEVELOPMENT CONTRIBUTION PRINCIPLES APPLIED IN STELLENBOSCH By Vincent Harris Manager: Development Services Directorate: Engineering Services.
SAVANNA CITY - Gauteng’s largest privately initiated development Background information to the Premier.
________________________________________________________________________________________________________________________________________________________.
Some aspects of alternative and affordable housing in Poland Jarosław BYDŁOSZ, Piotr PARZYCH, Poland Department of Geomatics Faculty of Mining Surveying.
1 Water Services Planning J.McGowan Senior Engineer May 2014 Kildare County Council Water Services.
CONCEPTS of VALUE. FACTORS OF VALUE UTILITY –THE ABILITY OF A PRODUCT TO SATISFY HUMAN WANTS. RELATES TO THE DAMAND SIDE OF THE MARKET. SCARCITY –THE.
Lecture(1) Instructor : Dr. Abdelmajid Nassar Civil Engineering Dept. Master Program Civil Engineering Dept. Master Program
The Urban Infrastructure Challenge in Canada: Focusing on Housing Affordability and Choice Presentation by CHBA – [Name] to The Municipal Council of [Name]
Large-scale land development in Finland and in the Netherlands – comparative case study M. Sc. (Tech.) Eero Valtonen, Aalto University Prof. Erwin van.
Daniel C. Shapiro & Jessica M. Schramm August 30, 2011 APA Presentation.
The Role of Local Government in implementing Biogas Projects Barry Coetzee, Head: Integrated Waste Management, Strategy & Policy Solid Waste Management.
Statewide Community Infrastructure Program “SCIP”.
1 TOWN OF LOCKPORT FINANCIAL REVIEW Focus on the Sewer Plant and Sewer Collection Service.
Contributions In Aid of Construction Mark Beauchamp Business & Finance Workshop Utility Financial Solutions
FINANCING CITY GOVERNMENT SERVICES IN SOUTHERN AFRICA CITIESNETWORK WORKSHOP 26 MAY 2011 Presented By: RM Gertze – Strategic Executive: Finance And Piet.
Development Contributions George Municipality. BASIS FOR DETERMINING DEVELOPMENT CONTRIBUTIONS PSDFPSDF George Municipality’s SDFGeorge Municipality’s.
APPLYING POLICIES TO DEVELOPMENT APPLICATIONS PLANNING SCHEME POLICIES.
Presentation by: Alwyn Laubscher Pr. Eng. Pr. CPM REPORT TO MUNICIPAL WORKSHOP 31 OCTOBER 2013.
1 Impact Fees in Virginia Virginia Municipal League Annual Conference October 15, 2007 Jeffrey S. Gore Hefty & Wiley, P.C.
LOCAL GOVERNMENT INFRASTRUCTURE NEEDS vs DEVELOPMENT CHARGES.
WSNTG Annual Conference September 2006 Water Services National Training Group 10 th Annual Conference 7 th September 2006.
Sunshine Coast Regional District Development Cost Charges July 3, 2014 Infrastructure Services Committee Bob Twerdoff.
3TB Project Review Tax Increment Financing (“TIF”) Overview January 25, 2013.
European Territorial Co-operation Eligibility of expenditure for co-operation programmes (Art. 17(1) ETC Reg. 18th meeting of the Expert Group on Delegated.
A DISCUSSION AROUND POTENTIAL FOR DISTRICT SYSTEMS IN THE CITY OF CAPE TOWN Spatial Planning and Urban Design : Marco Geretto.
Pennsylvania Municipalities Planning Code - MPC State enabling legislation for all municipalities except Pittsburgh and Philadelphia Newly Elected Officials.
Public Presentation of 2013 – 2017 Financial Plan March 25, 2013.
Development Charges June BACKGROUND Presently new external infrastructure costs for new and upgraded capacity for developments are in the main subsidised.
Commissioners’ Briefing on Front Foot Benefit and House Connection Rates November 16, 2011.
How to Read Site Plans and Development Plans Mary Pennock, Principal Planner Lee Garman, Principal Planner 2014 Commonwealth Planning and Zoning Conference.
Ordinance Amending Chapter 37 Orange County Code Utilities Department October 21,
PALERANG COUNCIL Proposed Special Rate Variation 2016/ /21 Public Exhibition : Draft Long Term Financial Plan and Draft Delivery Program (as amended)
“ Grand Landings North” Comprehensive Plan Amendment & Rezoning City Council Public Hearing March 3, 2015.
URBAN SETTLEMENT DEVELOPMENT GRANT PRESENTATION TO PORTFOLIO COMMITTEE ON HUMAN SETTLEMENTS /13 FINANCIAL YEAR 27 February 2013 NELSON MANDELA BAY.
GOVERNMENT OF THE KINGDOM OF LESOTHO Water and Sewerage Company (WASCO) Greater Maseru Water Supply Feasibility Study & Preliminary Design Results of Financial.
________________________________________________________________________________________________________________________________________________________.
BULK WATER TARIFFS OF BUSHBUCKRIDGE WATER Presented By: Ms. TP Nyakane Maluka - Chairperson Mr. MA Letswalo- Acting Chief Executive.
City of Pitt Meadows Taxation 101– Townhall Meeting February 4, 2016.
IAS 17 (revised) A lease is an agreement whereby the lessor conveys to the lessee in return for a payment or series of payments the right to use an asset.
CIL vs S106 The Regulation 123 list. The levy cannot be expected to pay for all of the infrastructure required: – 10-30% – Consider CIL as just one part.
1 Trends and Challenges of Local Finance Management in Malaysia by National Budget Office Ministry of Finance Malaysia 1 st Asian Public Governance Forum.
“State Road 100 MPC Lots” Comprehensive Plan Amendment & Rezoning City Council Public Hearing November 17, 2015.
INCOME FROM HOUSE PROPERTY. INTRODUCTION This lesson deals with income, which falls under the head ‘Income from house property’. The scope of income charged.
PRESENTED AND PREPARED BY CITY OF MISSOULA PUBLIC WORKS DEPARTMENT.
Regional Policy Requirements and application of ARTICLE 55 Lisbon, 19 April 2013 Michaela Brizova DG REGIO.F1: Operational Efficiency.
@ContentsExecutive Summary Annexures A M A J U B A Umkhandlu Wesifunda District Municipality Distrik
Community Infrastructure Levy S106 vs CIL July 2014.
“Is User Pays Possible for a Remote Town Water Supply – Case Study”
New Customer Contributions for the Water Sector: Workshop 4 August 2004.
Presented by Kelsey Lang, Planning Associate June 27, 2016
Water & Wastewater Capacity Charge Work Shop
LAND USE PLANNING Does It Work? Or Is It Self Defeating?
Overview of the CoJ Water & Sanitation Master Plan
Mangawhai Wastewater Strategy and Options 7 August 2017.
Capital Financing Strategy
City of Madras System Development Charges
SEWER SERVICE FEE RATE STRUCTURE ALTERNATIVE
Development Charge Public Meeting October 23, 2017
Local Government Climate Change Support Program 2016
STREET LED APPROACH IN SLUM UPGRADATION
MASILONYANA LOCAL MUNICIPALITY
The Role of Local Government in implementing Biogas Projects Barry Coetzee, Head: Integrated Waste Management, Strategy & Policy Solid Waste Management.
Presentation transcript:

Development Contributions Witzenberg Municipality 30 October 2013

Definitions "External / Bulk Services” means all primary engineering services, i.e. engineering services that serve the town as a whole or, alternatively, that serve the major part of the town/suburb and include raw water storage dams, water source developments, reservoirs, water purification works, main water supply and feeder pipelines together with main pump stations, waste water treatment works, sewer mains together with main pump stations, classes 1, 2 and 3 roads, main stormwater channels/pipelines, main sub- stations together with associated works and equipment;

"Internal Services” all engineering services found within the bounds of the development such as water reticulation, sewerage, roads and stormwater drainage, together with all associated services and equipment. "Link Services” which means all engineering services that are necessary to connect the internal services to the external or bulk services.

Fixed costs (an average tariff based on infrastructure need. Because it would be complicated, impractical and time-consuming to calculate the exact contribution for each development on a case-by-case basis) Actual / Direct costs (the cost to upgrade or establish infrastructure either because no bulk services available or only partly available. Calculated on case-by-case basis.)

Principles Council’s programme in terms of the IDP is aimed at basic human needs and hence it does not necessarily develop additional services capacity for private developments. There is no legal obligation on Council to provide municipal services to land simply because the owner wishes to develop his or her land. Private developments need to carry the cost of infrastructure provision.

Policy Engineering service contributions are financial or equivalent contributions made to a municipality by an applicant, usually a property developer, who has been granted enhanced land use rights (re zoning) in order to develop a piece of land. Contributions pay towards the increase impact on municipal services such as roads, water, stormwater and sewerage, which have either already been provided or which must still be provided by the municipality.

The developer may connect to the external (bulk) services provided that there is sufficient capacity. The developer is responsible for the installation of all the internal and link services required for the development. The developer pays engineering service contributions according to the municipalities approved tariffs for the increased demand on bulk services (fixed cost). In the event that external (bulk) services are not available or insufficient the developer has the option to construct/upgrade the service at his own cost and to a standard agreed with the municipality (actual/direct cost).

Development contribution triggers a)Subdivisions All subdivisions resulting in an increase in the number of units and/or erven. a)Rezonings Any rezoning that will have an impact on bulk services i.e. Re-zonings from residential to business/industrial, from Agricultural to commercial, from commercial to residential, etc. a)Increase in land-useApplication for additional bulk / GLA / Coverage a)Subsidised housing 100% discount on engineering service contributions. a)Social (GAP) housing Social housing aims to provide housing opportunities to a specific lower income group (R3 500 – R15 000). The levy will be charged at 50% of a residential unit levy. *refers to the number of additional units/erven allowed as a result of the rezoning/subdivision.

Practical Example – Ceres Golf Estate Development 296 units over 3 phases 1 st phase 83 units GLS Report showed bulk water items that needs upgrading (to accommodate the golf estate together with other development areas):

Incremental cost to developer (whole development): Cost for phase 1 (83 units) Capital Contribution as on for Ceres Golf Development Fixed CostActual CostTotal Cost DescriptionFixedNumber of stands Amount (incl vat) Storage Capacity needed (m3) Estimated Cost (incl vat) Water Sewer Roads Storm water Total

Points needing clarification How do we deal with offsets? When does offsets apply? Is our approach in line with section 49(4) of SPLUMA in terms of offsets? Our contributions only deal with civil services, what about social services? Agree on certain principles and standard calculation method. Simplicity required as far as possible.

THE END