By : Soukata Vichit The Feasibility of NCF The case of Environment Protection Fund, Lao PDR.

Slides:



Advertisements
Similar presentations
Workshop on Options for an Innovative Climate Finance Regime for South Asia Maldives Green Fund Ministry of Environment and Energy Maldives.
Advertisements

Regulatory Cooperation in Practice
European Union Strategy for the Danube Region (EUSDR) -- A World Bank Perspective High-level Meeting on Financing Belgrade, September 27 th, 2010.
PRESENTATION OUTLINE Introduction Climate change initiatives Capacity Challenges.
Final Report Presentation By Mohammad Saber Sakhizada March,26 – 2009.
Greater Mekong Subregion Core Environment Program and Biodiversity Conservation Corridors Initiative ADB TA 6289 Executing Agency: ADB Implementing Agency:
Page 1 Regional Institutional Capacity Building in the Implementation of Clean Development Mechanism in ASEAN Countries March 2004 Jakarta, Indonesia.
Third Meeting of the Heads of ECO National Statistical Offices May, Kabul, Afghanistan 1 Strengthening the National Statistical System of Afghanistan.
The Treaties, Institutions and Policies of the EU
Public Procurement in The Rep. of Maldives
GEF and Environmental & Conservation Funds Presentation for the Workshop on “Management of Environmental Funds for the Financial Sustainability of Biodiversity.
1 Roles of UNEP, GEF & CBD in the Environment 2 nd Training Workshop for BCH Regional Advisors May 2006 Bangkok, Thailand.
Asian region workshop on “capacity development for the clean development mechanism” October 2005, AIT, Bangkok, Thailand VIETNAM DNA INSTITUTIONAL.
A project implemented by the HTSPE consortium This project is funded by the European Union SUSTAINABLE GROWTH LIFE
Ministry of Education and Religious Affairs General Secretariat for Research and Technology EEA Financial Mechanism Research within Priority.
| Regional Workshop on CDM and NAMAs for Latin America and the Caribbean Roles and Structure of Designated National Authorities (DNAs) Bogota, Colombia.
WMIG AND LIMPOPO REGIONAL OFFICE LIAISON MEETING Lessons Learnt – Inkomati CMA Establishment and Development 12 December 2006.
Climate Change and CDM in Thailand
Investment Policy of Lao PDR Thamma PHETVIXAY Deputy Director General Investment Promotion Department (IPD) Ministry of Planning and Investment, Lao PDR.
Identify the institutions which have a stake in the
LOCAL SELF- GOVERNMENT IN SLOVENIA. Legal context Slovenia is a "territorially unified and indivisible State“ (art. 4 of the Constitution). It has a bicameral.
Highlights and Visions May 24,  Since joining the GEF as an Executing Agency in 2004, the Bank has developed a portfolio that amounts to nearly.
The Project Governance Inception Workshop and the First Steering Committee Meeting of the UNEP/GEF Project “Piloting Integrated Processes and Approaches.
Supervision and regulation of banking system duty is given to a autonomous organization called Banking Regulation and Supervision Agency. BRSA is public.
Session 13 CPIP Formulation Process Project for Capacity Development for Implementing the Organic Law at the Capital and Provincial Level (PILAC 2)
CDM Status in Pakistan Dr. Syed Sajidin Hussain Clean Development Mechanism Cell Ministry of Environment, Government of Pakistan
MINISTRY OF FINANCE STATE TREASURY. 2 Management, accounting and reporting of externally financed projects.
Dr. Le Van Minh SPRCC Program Deputy Coordinator Adviser to NTP-RCC Regional Clinic on the Design and Management of National Climate Funds – Bangkok, September.
IGES-URC Regional Workshop in Asia on Capacity Development for the Clean Development Mechanism March 2004 Siem Reap, Cambodia CDM INSTITUTIONAL FRAMEWORK.
Kick-off Meeting Belgrade, 4-5 December 2008 Network of Centres for Project Development and Management.
Prasetyadi Utomo Ministry of Environment of Indonesia CD4CDM Workshop Pathumthani, Thailand 19 – 21 October, 2005 Indonesia’s Policy on CDM Implementation.
Regulatory Institutions in Turkey. Regulatory Institutions Central Bank of Turkey Banking Supervision and Regulatory Institutions Capital Markets Board.
PLAN AND BUDGET COMMITTEE AND THE OVERALL BUDGET PROCESS Yüksel KARADENİZ Legislative Expert.
Ministerul Mediului si Gospodaririi Apelor Session 6 - Enhancing National GEF Coordination, Communication and Outreach Developing the National Capacity.
HONDURAS AND ITS HISTORICAL INSTITUTIONALITY IN MIGRATION MATTERS.
Arnsburger Str. 64, Frankfurt, Germany Tel , Fax Internet:
Thailand’s Preparation for Starting a Nuclear Power Program Mr. Pricha Karasuddhi Technical Advisor Nuclear Power Program Development Office(NPPDO) Ministry.
Extractive Industries Transparency Initiative: Civil Society Participation October 21, 2005, Ulaanbaatar, Mongolia Bermet Sydygalieva.
1 REPUBLIC OF MOZAMBIQUE MINISTRY OF WOMAN AND SOCIAL ACTION “A policy dialogue and a south-south learning event on long term social protection and inclusive.
The International Financial Institutions and Nam Theun 2 International Stakeholder Workshops Bangkok, Tokyo, Paris, Washington, Vientiane 31 August-24.
Definition of objectives, guidelines, and thematic areas of the Secretariats Ad Hoc Working Group on the Strategic Vision of the OAS October 2015.
Revisions Proposed to the CIS Plan by the Global Office Misha V. Belkindas Budapest, July 3-4, 2013.
Baghdad 4 Dec  Related to MDG ◦ MDG 1: Eradicate extreme poverty ◦ MDG 8: Develop a global partnership for development  National Vision: ◦ Increase.
EU Politics CHAPTER 13: Other Institutions. Outline 1) European Economic and Social Committee (EESC) 2) Committee of the Regions (CoR) 3) European Agencies.
Fiscal transparency in Mongolia Fiscal transparency 1.1 Legal framework of Mongolia; 2. Implementation of the Law 3. Challenges Outline.
Preparation of a Strategic Pilot Program for Climate Resilience (PPCR) Project - Phase I (November January 2013) Climate Investment Funds (CIF) Grant.
Lecturer: Lina Vladimirovna Zhornyak, associated professor.
New approach in EU Accession Negotiations: Rule of Law Brussels, May 2013 Sandra Pernar Government of the Republic of Croatia Office for Cooperation.
M O N T E N E G R O Negotiating Team for the Accession of Montenegro to the European Union Working Group for Chapter 32 – Financial control Bilateral screening:
M O N T E N E G R O Negotiating Team for the Accession of Montenegro to the European Union Working Group for Chapter 32 – Financial Control Bilateral screening:
Coordination mechanisms Examples and possible coordination mechanism for the conduct of the ABND in Lao PDR.
Planning and Coordination in Environmental Governance: Indonesian Way of Undoing Thing Laode M. Syarif, Ph.D Hasanuddin University Makassar - Indonesia.
Western Balkans Climate Resilience Workshop, Vienna, 11 – 12 May 2016.
Assist. Prof. Dr. Özer KÖSEO Ğ LU ADMINISTRATIVE ORGANIZATION.
WORKSHOP ON THE ESTABLISHMENT OF A NATIONAL COMPETITIVENESS AND PRODUCTIVITY COUNCIL FOR SAINT LUCIA Presentation by Laura del Castillo Saviñón, Technical.
PUBLIC FINANCE IN THE REPUBLIC OF MOLDOVA: REFORMS AND THE DEVELOPMENT STRATEGY PLENARY SESSION OF THE TREASURY COMMUNITY OF PRACTICE JUNE 1-3, 2015, KISHINEV,
1 LAW On Public Finance and Budget and Tax Responsibility; Competences and Roles of Participants of the Budget Process # 181, of July 25, Plenary.
Kishinev 2016 MINISTRY OF FINANCE OF THE REPUBLIC OF TAJIKISTAN.
Project Debriefing Debriefing meeting on the implementation status of two ADB- JFPR funded projects: (i) Technical Assistance Strengthening Coordination.
Treasury of the Republic of Kazakhstan
Kenya Forest Working Group Meeting
Implementation of the IPS MDTF
Ministry of Industry and Commerce
Table of contents Foundation for support of reforms in Ukraine. Initiation……………………….3 Structure of the Foundation …………………………………………………………4 Areas of Activities …………………………………………………….5.
The Republic of Iraq .
MCA-MALI FOSTERS GOOD GOVERNANCE & TRANSPARENCY
INGONYAMA TRUST BOARD’S ANNUAL PERFORMANCE PLAN
Forum on National Plans as Poverty Reduction Strategies in East Asia National Strategic Development Plan (NSDP), & Public Investment Program.
Coordinated Engagement
Article 5 Setting up the rules guaranteeing Users protection that will
Presentation transcript:

By : Soukata Vichit The Feasibility of NCF The case of Environment Protection Fund, Lao PDR

Fund name: Environmental Protection Fund Country: Lao PDR Objective: to strengthen environmental protection, sustainable natural resources management, biodiversity conservation and community development in Lao PDR

Board of Directors (August 2012) 1.Deputy Prime Minister as Chairperson 2.Minister of Finance as Vice-Chairperson 3.Vice Minister of Ministry of natural resources and Environment (Member),, 4.Vice Minister of Ministry of Energy and Mining (Member), 5.President of Lao Women Union (Member),, 6. Vice Governor of province (Member), 7.Vice President of Chamber of Commerce and Industry (Member), 8.President of the Association for Agricultural Production and Processing, 9.Vice President of Science and technology Council. Governing body

–The EPF has been established as an autonomous organization, both financially and administratively, operating under the laws in Lao PDR. The EPF was established through the issuance of Prime Ministers Decree No146/PM dated 6 June –The EPF can absorb all kinds of contributions from donors and the private sector, although it cannot access a direct fiscal transfer from line ministries due to its off-budget nature. Legal status:

Income of ​Sources of income​US$LAK (million) Grant7,023,00056,184 World Bank sinking fund7,000,00056,000 UNESCO sinking fund23, ADB endow​ment fund5,798,19446,386 Contributions from businesses265,8782,127 Interest from the capital896,7567,174 Total13,983,828111,871

Beneficiaries Any person, Commercial entities, Government organizations, Civil society entities (NGOs) [1] [1] Note: US$ 1 = LAK 8,000

Rationale To secure stable source of income for the environmental protection efforts

EPF fund and climate finance Article 17of EPF Decree –EPF shall establish Specialized Financing Windows (SFW) for activities for environmental protection, sustainable exploitation, use and management of natural resources within any sector. –Government ministries, organizations and entities may propose the establishment of a SFW.

EPF fund and climate finance –SFW may elect to establish their own managerial structure, or let the Executive Office operate and manage the window per agreement with the entity providing the capital contribution.. –The creation of other funds for environmental protection, natural resources, and/or biodiversity conservation separate from the EPF is not permitted. Such funds shall be established only as SFW under the umbrella of the EPF..

EPF Financing Windows and Access to AF 10 PC PICE CBI PC WRM End. Fund Interes t - 20 % -Sub grant £¤¡¾­- Contribution WB Grant WB Grant CC & A ອື່ນໆ ? AF Sub grant -£¤¡¾­- Sub grant Others Land M E P F Sub grant

Process of establishment The EPF establishment is provided by the environmental protection Law (1999) and was initiated as one of the conditions of the ADB Environment and Social Program (ESP) program loan (US$ 20 million) to the Government of Lao PDR; The Prime Minister Decree 146 on the EPF establishment and operation was issued on 6 June 2005;

Process of establishment The Prime Minister Decree 72/PM appointing the EPF board of directors was issued on 1 November 2005, In January 2006 the EPF board adopted and approved the EPF charter, The Executive Director was appointed by mid April, and the World Bank grant was effective. The process take more than 5 years

Political support The EPF BOD appointment was on 1 November 2005 and and the director of the executive office the fund provided by April The EPF is an autonomous organization established by the Government and chaired by the Deputy Prime Minister.

Resources invested in the establishment 5 years ~ 6 men month (Supported by ADB) Budget allocated (if any)

Legal process The establishment of a fund in Lao PDR has to be provided by a law under which a specific Prime Minister Decree on the establishment and operation of the fund will be issued.

Legal tools –EPF Decree –EPF Chapter –EPF Operation Manual –Technical Guideline and application form –Financial and procurement Manual –Sub grant Implementation Manual

Institutional Framework Board of Directors Executive Director Assistant to the ED (2) Office Cleaner (1) ​ Drivers (2) Inter. Advisor (where is needed IT (1) Project(s) Accountant (2) Procurement Officer (1) Financial Unit Manager (1) Financial Unit Manager (1) Technical unit Admin Assistant Cash (1) Planning Manager (1) Provincial facilitator (s) PSC of Window/project Window & M&E manager

Human and institutional For the management of the EPF, the EO has actually 15 staff with about 20% of the total annual budget for the operation cost.

Lesson-learned: Success Factors Different types of funds – The EPF has proven that it is beneficial to create a structure of a national fund that can accommodate different types of funds. –T he EPF can serve as an institution that provide financial service –T he EPF can directly receive the financial assistance by a creating of a specific window

Lesson-learned: Success Factors Standards The EPF manage fund according to international standard in financial integrity as well as social and environment safeguard –inclusion of detailed procedures of financial management and social environment safeguard in the Charter and Operations Manual –most of the grants have been managed according to the World Bank’s standards

Lesson-learned: Success Factors Reaching local beneficiaries –The EPF and the Small Grant Project have been the only initiatives that channel financial resources to local stakeholders in the field.

Lesson-learned: Challenges Different types of funds –An endowment fund was created to ensure sustainable income to finance the operations of the EPF, but a sustainable source of capital has not been identified. –Without sustainability the turn over rate of staff occurred and may reduce confidence of donor agencies in providing contributions to the fund.

Lesson-learned: Challenges Standards –there has been a concern about the high turn over rate. –However, with the established system in place, building the capacity of human resources would be faster compared to the process of establishing the system from scratch.

Address EPF Executive Office POBox: nd Floor, MONRE Building, Sidamduan Road, Vientiane Tel: (856 21) Fax: (856 21) http: //