9-12 April 2007 International Linear Collider DR electron cloud R&D effort: Clearing electrode and triangular fin M. Pivi T. Raubenheimer, J. Seeman, T.

Slides:



Advertisements
Similar presentations
KEK Update on the status of the electron cloud studies at KEKB Contents Brief review of our studies Updates Clearing electrode Groove structure SEY measurement.
Advertisements

Study of a Clearing Electrode at KEKB - First beam test - Y. Suetsugu, H. Fukuma (KEK), M. Pivi, W. Lanfa (SLAC) 2008/3/3-61TLC08 Sendai.
R&D Plan on Clearing Electrode using the KEKB LER Y. Suetsugu and H. Fukuma, KEKB M. Pivi and L. Wang, SLAC at KEK.
Test Chamber Assembly, 1.5M Long (59.00”) Vacuum Tube, 4.00 OD x 3.50 ID Vacuum Tube, 3.75 OD x 3.51 ID 3.375” CFF, Non-Rotatable Feedthrough, Ceramtec.
KEK Recent results of beam tests on clearing electrode and grooves 2010/1/191ILC DR WebEx Meeting Y. Suetsugu, KEK.
Damping ring K. Ohmi LC Layout Single tunnel Circumference 6.7 km Energy 5 GeV 2 km 35 km.
9-12 April 2007 International Linear Collider DR electron cloud R&D effort 1 st part: Tests in PEP-II M. Pivi L. Wang, D. Arnett, G. Collet, R. Kirby,
Latest ILC DR wiggler simulations M. Pivi, T. Raubenheimer, L. Wang (SLAC) July, 2005.
Using Tune Shifts to Evaluate Electron Cloud Effects on Beam Dynamics at CesrTA Jennifer Chu Mentors: Dr. David Kreinick and Dr. Gerry Dugan 8/11/2011REU.
E-Cloud Effects in the Proposed CERN PS2 Synchrotron M. Venturini, M. Furman, and J-L Vay (LBNL) ECLOUD10 Workshshop, Oct Cornell University Work.
First approach to the SuperB Rings M. Biagini, LNF-INFN April 26th, 2006 UK SuperB Meeting, Daresbury.
LEPP, the Cornell University Laboratory for Elementary-Particle Physics, has joined with CHESS to become the Cornell Laboratory for Accelerator-based Sciences.
ILC Damping Ring update on collective effect electron cloud R&D Mauro Pivi SLAC ILCDR06 Cornell Workshop September 26-28, 2006.
Sep 29 – Oct 3, 2009 LCWA 09 Linear Collider Workshop of the Americas Sept 29 – Oct 4, 2009 Damping Ring R&D updates SLAC Mauro Pivi SLAC Allison Fero.
Electron Clouds at SLAC Johnny Ng ILC Damping Rings Collaboration Meeting March 4, 2009.
KICKER LNF David Alesini LNF fast kickers study group* * D. Alesini, F. Marcellini P. Raimondi, S. Guiducci.
25-26 June, 2009 CesrTA Workshop CTA09 Electron Cloud Single-Bunch Instability Modeling using CMAD M. Pivi CesrTA CTA09 Workshop June 2009.
Webex Electron Cloud Evaluations for ILC DR Mauro Pivi on behalf of the ILC Electron Cloud Working Group - by Webex - KILC12 – Daegu Korea April 25, 2012.
Updates of Electron Cloud Studies at KEKB Topics in 2008 Measurement of electron density in solenoid and Q field Mitigation using clearing electrode in.
ILC damping ring Workshop, Dec 19, 2007, KEK, L. WANG Ecloud simulation 2007 ILC Damping Rings Mini-Workshop December, 2007 Lanfa Wang, SLAC.
FAST KICKER STATUS Fabio Marcellini On behalf of LNF fast kickers study group* * D. Alesini, F. Marcellini P. Raimondi, S. Guiducci.
SuperKEKB Vacuum System - for the positron ring - Y. Suetsugu KEKB Vacuum Group Outline Design and production status of key components Beam pipes for arc.
ILC08 Chicago November 2008 Summary of Recent Results from SLAC M. Pivi, J. Ng, D. Arnett, G. Collet, T. Markiewicz, D. Kharakh, R. Kirby, F. Cooper,
March 23, 2010 CMAD a tracking and e-cloud beam instability parallel code (M.Pivi SLAC) Taking MAD(X) optics file at input, thus tracking the beam in a.
1 CERN 1 Mar E-CLOUD Build-up in Grooved Chambers Marco Venturini Center for Beam Physics, LBNL ECL2 -- CERN, 1-2 March 2007.
Electron cloud in the wigglers of ILC Damping Rings L. Wang SLAC ILC Damping Rings R&D Workshop - ILCDR06 September 26-28, 2006 Cornell University.
CesrTA EC Build-Up and Mitigation Program - Introduction Mark Palmer June 25, 2009.
1 Proposal for a CESR Damping Ring Test Facility M. Palmer & D.Rubin November 8, 2005.
ILC Damping Ring Collective Instability update: Electron Cloud Mauro Pivi SLAC ILC Vancouver Meeting July 19-22, 2006.
Study Plan of Clearing Electrode at KEKB Y. Suetsugu, H. Fukuma (KEK), M. Pivi, W. Lanfa (SLAC) 2007/12/191 ILC DR Mini Work Shop (KEK) Dec.
October 13,2010 WG Meeting Cornell U. Recommendation for Electron Cloud Mitigations in the ILC Damping Ring ILC DR Working Group October 13, 2010 Cornell.
E-cloud studies at LNF T. Demma INFN-LNF. Plan of talk Introduction New feedback system to suppress horizontal coupled-bunch instability. Preliminary.
Compare options: simulations recent history Cloud density near (r=1mm) beam (m -3 ) before bunch passage, values are taken at a cloud equilibrium density.
Compare options: simulations recent history Cloud density near (r=1mm) beam (m -3 ) before bunch passage, values are taken at a cloud equilibrium density.
ILC DR Workshop - KEK December, A new resonance in wiggler simulations: Christine Celata Use POSINST code.
Midwest Accelerator Physics Meeting. Indiana University, March 15-19, ORBIT Electron Cloud Model Andrei Shishlo, Yoichi Sato, Slava Danilov, Jeff.
Motivation and Overview David Rubin Cornell Laboratory for Accelerator-Based Sciences and Education.
C ESR TA Status Report July 22, 2010 Mark Palmer for the C ESR TA Collaboration.
Cesr-TA Simulations: Overview and Status G. Dugan, Cornell University LCWS-08.
Nov 17, 2009 Webex Assessing the 3.2 km Ring feasibility: Simulation parameters for electron cloud Build-up and Instability estimation LC DR Electron Cloud.
Electron cloud measurements and simulations at CesrTA G. Dugan, Cornell University 4/19/09 TILC09 4/18/09.
Recent Electron-Cloud Mitigation Studies at KEK E-cloud mitigation mini-workshop on November at CERN Kyo Shibata (for KEKB Group)
SKEKB Mini Work SKEKB Vacuum System – Arc Section – Contents Y.Suetsugu KEKB Vacuum Group 1.Beam Chambers 2.Pumps: Pump, Pressure,
3 rd INSTALLATION: chicane magnetic field tests PEP-II e+ ring 1 st and 2 nd Feb 2008 Electron cloud installation studies at SLAC ILC tests - SLAC Cherrill.
Electron cloud in Final Doublet IRENG07) ILC Interaction Region Engineering Design Workshop (IRENG07) September 17-21, 2007, SLAC Lanfa Wang.
ILC GDE - ILCDR08 Cornell 8-11 July 2008 Electron Cloud Mitigation R&D at SLAC M. Pivi, D. Arnett, G. Collet, T. Markiewicz, D. Kharakh, R. Kirby, J. Seeman,
Electron Cloud R&D at SLAC Johnny Ng SLAC DOE HEP Review July 7 – 9, 2008.
E-cloud Remedies and PS2 vacuum design J.M. Jimenez AT Department – Vacuum Group CARE-HHH-APD BEAM’07 Thursday 04 October Session 2: PS2 E-cloud.
UPDATE ON KICKERS LNF David Alesini for the LNF fast kickers study group* * D. Alesini, F. Marcellini P. Raimondi, S. Guiducci.
R&D GOALS AND MILESTONES TOWARDS A TECHNICAL DESIGN REPORT TDR (2008) First Intnl. Teleconference Ecloud, Impedance/Instabilities - M. Pivi, SLAC 31 October.
Possible solutions for the e- cloud problem – SPS upgrade meeting - Frank Zimmermann, 21 March possible solutions for the electron-cloud problem  suppress.
Updates of EC Studies at KEKB 1.EC studies at KEKB 2.Recent results 1.Clearing Electrode 2.Groove surface 3.TiN coating 4.Measurement of EC in solenoid.
3 February 2010 ILC Damping Ring electron cloud WG effort Mauro Pivi SLAC on behalf of ILC DR working group on e- cloud ILC DR Webex Meeting Jan 3, 2010.
Recent ECLOUD07 Workshop in Daegu, S. Korea (~50 participants) –Highlights: Measurements of the surface Secondary Electron Yield (SEY) of samples inserted.
Electron Cloud in the International Linear Collider ILC Mauro Pivi work performed while at SLAC and the ILC Damping Ring Working Group High.
2007/03/1-2 ECL2, CERN 1 SEY and Clearing Studies at KEKB Contents Contents Introduction Studies Beam duct with Ante-chambers Coatings with Low SEY Clearing.
Recent Studies on Electron Cloud at KEKB 1.EC studies at KEKB 2.Recent results –Clearing Electrode –Groove surface –EC measurement in Q and solenoid field.
PEP-II test chambers installation
International Linear Collider R&D on electron cloud (SLAC)
Groove Mitigation and Plans
Electron Cloud Effects in SuperB
Electron cloud and collective effects in the FCC-ee Interaction Region
Why Study Electron Clouds? Methods and Tools to Study Electron Clouds
Work In January 2007, we installed 5 chambers in a straight Field Free region of PEP-II Low Energy Ring (LER). Closest bend at ~18 meters upstream: 1 stainless.
Single-bunch instability preliminary studies ongoing.
SuperB General Meeting June , Perugia (Italy)
M. Pivi PAC09 Vancouver, Canada 4-8 May 2009
ILC Damping Ring electron cloud WG effort
Electron Clouds at SLAC
R&D GOALS AND MILESTONES TOWARDS A TECHNICAL DESIGN REPORT TDR (2008)
Presentation transcript:

9-12 April 2007 International Linear Collider DR electron cloud R&D effort: Clearing electrode and triangular fin M. Pivi T. Raubenheimer, J. Seeman, T. Markiewicz, R. Kirby, F. King, B. McKee, M. Munro, D. Hoffman, G. Collet, L. Wang, A. Krasnykh, D. Arnett, (SLAC) M. Venturini, M. Furman, D. Plate (LBNL), D. Alesini (LNF Frascati), R. Macek (LANL) ECLOUD 07 Daegu, S. Korea

2 Milestones to the ILC Engineering Design Report (EDR) 1. Characterize electron-cloud build-up. (Very High Priority) 2. Develop electron-cloud suppression techniques. (Very High Priority) Priority: characterize coating techniques and testing of conditioning and recontamination in situ. Clearing electrodes concepts by installation of chambers in accelerators. Characterization of impedance, HOM and power load deposited to the electrodes. Groove, slots and other concepts. Characterization of impedance, and HOM. 3. Develop modeling tools for electron-cloud instabilities. (Very High Priority) 4. Determine electron-cloud instability thresholds. (Very High Priority) Characterization the electron cloud instability: various codes in use PETHS, HEAD-TAIL, WARP/POSINST, CMAD

R&D Goals: –Estimate e-cloud build-up and single-bunch instability thresholds –Reduce surface secondary electron yield (SEY) below electron cloud threshold for ILC DR: SEY ≤ 1.2 Surface approaches –Thin film coatings –Electron and photon surface conditioning –Clearing electrodes –Grooved surfaces Projects: –ONGOING: conditioning TiN and NEG coatings in PEP-II straights –ONGOING: rectangular groove chambers in PEP-II straights –PLANNED: clearing electrode chamber in magnets –PLANNED: triangular groove chamber in magnets E-cloud and SEY R&D Program SLAC

ONGOING TESTS AT SLAC: Projects CLEARING ELECTRODES BEND…end 2007Design FINS TRIANG.BEND…end 2007Design TEST inLOCATIONReady for INSTALLATION Status SEY TESTSSTRAIGHTPEP-II LER PR12November 2006 Ready FINS RECTANG.STRAIGHTPEP-II LER PR12November 2006 Coating of extruded Al chambers ONGOING PROJECTS:

Clearing Electrode Concept of a clearing electrode Model: Wire (Rod) type L.Wang et al., EPAC2006 Beam duct Rod (Electrode) Ceramics Support Feed-through Ceramics Support with thin metal coating Beam 2007/03/1-2 Y. Suetsugu KEK - ECL2 CERN 28

Clearing of electron cloud in ILC dipole magnet Clearing field (left) and effect (right) of a traditional stripline type of electrode. The red color in (left) shows the electrode. The blue and black dots in right plot show the electrons with different size of electrode. The width of low electron density region increases with the size of the electrode. Clearing field 0 Voltage 100 Voltage L. Wang, SLAC June 2006

Simulation unsing POSINST code of electron cloud build-up and suppression with clearing electrodes. ILC DR positron 6 km ring. Curved clearing electrodes: simulations BEND chamber with curved clearing electrodes M. Pivi – P. Raimondi, L. Wang, T. Raubenheimer SLAC, Mar 2006

Curved clearing electrodes effect V Assume electron at rest near wall before bunch pass. Electron is first accelerated by the beam to the center chamber and then attracted back by the biased +100V electrode. Electron back to the wall after 3 ns, much before the next bunch passage.  Electron cloud build-up is strongly suppressed ! During the spacing between bunches: (E CE = cl. electrode field near wall)

Only one electrode polarized. Single electrode M. Pivi – P. Raimondi, SLAC, Mar 2006

SuperB and ILC DR LatticeSUPERBOCS Circumference [m]6114 Energy [GeV]5.066 Harmonic number13256 Bunch charge [10 10 ]2.0 Bunch Spacing [ns] Mom. comp. [10 -4 ]1.62 Bunch length [mm] sigz6.0 Sigx, sigy in BEND [  m] 620, 8 Energy spread [10 -3 ]1.29 Synchrotron Tune [10 -2 ]3.37 Compare electron cloud in SuperB and ILC Difference in bunch spacing: SUPERB=1.5 ns and ILC=6.15 ns Mar 2006

SUPERB bends clearing electrodes POSINST code Near beam electron cloud density. M. Pivi – P. Raimondi, L. Wang, T. Raubenheimer SLAC, Mar 2006 E-cloud build-up and suppression with/without clearing electrodes in bends of SUPERB factory (bs=1.54ns) Compare electron cloud in SuperB and ILC Difference in bunch spacing: SUPERB=1.5 ns and ILC=6.15 ns Compare electron cloud in SuperB and ILC Difference in bunch spacing: SUPERB=1.5 ns and ILC=6.15 ns

Clearing electrodes R&D Suppress the electron cloud in BEND and WIGGLER (QUAD) section: Perfect ! Prototypes installation in LHC test dipole.. CERN ad Texas Univ. stripe electrode design. Warning: ion-clearing electrodes (alumina) in Daphne generate impedance and overheating, need to be removed. Control the generation of HOM, transverse impedance, resistive wall impedance and RF heating. Optimized design should be tested in beam line with similar beam parameters  R&D at PEP-II, Cornell, KEK, CERN. LHC electrode design

Enamel Vitreous material, generated in melting process, contents a number of anorganic and oxidic-silicatic fractions Vitreous material, generated in melting process, contents a number of anorganic and oxidic-silicatic fractions Melting on metal- or glassubstrate, chemical and micromechanical connection between the layer and metall surface Melting on metal- or glassubstrate, chemical and micromechanical connection between the layer and metall surface Universal dissolver for anorganic, metallic oxides Universal dissolver for anorganic, metallic oxides Countless possibilities of variaty Countless possibilities of variaty Generally free from any organic material Generally free from any organic material ECL2 Workshop CERN, March 2007

double enamel coating – the new e- cloud killer (F. Caspers, F.-J. Behler, P. Hellmold, J. Wendel) ECL2 Workshop CERN, March 2007

59”~25” tapered chamber 1   3.5”   1.73” Grooved chamber(?!) Clearing electrode chamber spool chamber Layout installation – in PEP-II (D-BOX) tapered chamber 2 BEND D-BOX=diagnostic box, electron detection centered on BEND and 13.5” long Chamber cross section 22” (D-BOX) BEND reduction to ILC DR chamber diameter 4-bend chicane

Sketch clearing electrode chamber and diagnostic Electron cloud diagnostic R. Macek LANL max: 5” Test chamber with clearing electrodes Test chamber in PEP-II in a special chicane with 4 identical magnets magnets: SLC Final Focus correctors Chamber aperture constraint from the magnet aperture: max 5 ” M. Pivi SLAC -February 13, 2007

Test Chamber Assembly, 1.5M Long (59.00”) Vacuum Tube, 4.00 OD x 3.50 ID Vacuum Tube, 3.75 OD x 3.51 ID 3.375” CFF, Non-Rotatable Feedthrough, Ceramtec # W Mounted to 1.33” CFF 3.375” CFF, Rotatable Tube, 2.00” OD x 1.73” ID Flange to Flange Length = 59.00” Collector Port Flange 1.33” CFF access port

Test Chamber with Electrode Electrode, Copper 0.063” x ~1.0” x 50.0” (49.606” between feedthrough centers) Clearance between Electrode and chamber Varies between.070” and.080”

Electrode Connection Space between chamber and electrode = 0.08” (2mm all around)

Electrode Connection Collector Port, 20.00” x 1.00” Collector Port Flange, 21.50” x 2.50” 0.125” Dia. Holes

R pipe 11 h3 t L TOT L TAP h1 h2 First discontinuity Dimensions: L TOT  630 mm L TAP  115mm Rpipe=44 mm  =60 deg h1,h3,h3=5 mm t=2 mm 1st Geometry: 2 Ports 50 Ohm 2nd Geometry: 1 Ports 50 Ohm David Alesini, Frascati, Feb 2007

A. Krasnykh, SLAC, Mar 2007D.Alesini, LNF, Frascati HFSS Results on Copper electrode stainless steel chamber Longitudinal Impedance: power deposited to electrode ~10W with PEP-II beam, and ~2W for ILC DR beam. Add Synchrotron radiation in PEP-II +40W  power load 50W onto electrode

Summary clearing electrodes Clearing electrode/s suppress cloud build-up and perfectly eliminate the cloud at center beam. Concern: Removal of power load from clearing electrode! Stripe line kicker design tests first Clearing electrode on isolator substrate: “enamel” more studies needed.

ONGOING TESTS AT SLAC: Projects CLEARING ELECTRODES BEND…end 2007Design FINS TRIANG.BEND…end 2007Design TEST inLOCATIONReady for INSTALLATION Status SEY TESTSSTRAIGHTPEP-II LER PR12November 2006 Ready FINS RECTANG.STRAIGHTPEP-II LER PR12November 2006 Coating of extruded Al chambers ONGOING PROJECTS:

L. Wang, SLAC

Note: fin chambers needed in magnet regions covering ~12% of the ILC DR

27 M. Venturini, M. Furman LBNL 20 Feb Smoother tips spoil effectiveness of grooves (POSINST) ãSpoiling effect of smooth groove-tips can be compensated by making the grooves deeper. ãGenerally, a finite groove-tip radius enhances dependence of groove effectiveness on groove height Max of cloud density vs. groove-tip radius for two groove height h g Max of cloud density vs. height h g for 3 choices of groove-tip radius

Summary triangular fins in magnetic field regions Triangular groove are very promising at reducing the electron cloud build-up in bends and wigglers. In magnets, reduced groove area needed only on top and bottom chamber. Photons leave the chamber more efficiently (<< lower accumulation of photoe- than with a uniform groove distribution around chamber perimeter) Sharpness of tips important to reduce SEY.

Triangular groove chamber

Self-consistent code CMAD At SLAC, developing self-consistent code including simulation of cloud build-up and beam instabilities. Parallel computation allows tracking the beam in a MAD lattice, instability studies, threshold SEY, dynamic aperture study, frequency map analysis, tune shift computation.. MAD deck to track beam with an electron cloud in the ILC DR. Bunch at injection

Self-consistent code development Dynamics MAD input lattice Tracking 1 bunch in the ring lattice by 2 nd order transport maps (R, T) –Not symplectic (but 99% phase space conservation if ILC DR 500 turns) Tracking 6D beam phase space, 3D beam dynamics 3D electron dynamics Apply beam-cloud interaction at each element of MAD lattice 2D forces beam-cloud, cloud-cloud computed at interaction point Electron dynamics: cloud pinching and magnetic fields included Approximations: Assign same cloud distribution and density for each class of elements (ex: 1E+12 em -3 in quadrupoles, 4E+12 em -3 in wigglers) Evolution of cloud build-up updated at each beam turn (weak beam changes turn by turn) – [NOTE: cloud build-up part is not included yet] If beam sizes are identical at two elements, apply earlier computed cloud- to-beam kick – [switched OFF]

CMAD status First results: few synchrotron oscillation periods (9min * 320 CPUs / turn) CMAD tracking, ILC DR beam at extraction, with average cloud density 1e10 e/m 3 (below threshold). Electron cloud distribution in bends and straights (so far from POSINST) Completed. Single-bunch instability part: studies ongoing. Build-up electron cloud to be added, vacuum chamber, SEY, etc. Use POSINST now Bottleneck => in ILC DR, beam aspect ratio reaches  x/  y=200, demanding Particle in Cell grid ratios num-gridx >> num-gridy, to correctly simulate Electric field. s =0.067 e- density 1e10 e/m 3 macrop 

Summary Latest results (SLAC/KEK) of direct measurements in B-factories beam line indicate very low SEY for thin film coatings. R&D effort for ILC DR on development of coating mitigation techniques + antechamber design In parallel, R&D studies should continue for other possible mitigation techniques (ILC DR upgrade, SuperB) Simulations: clearing electrodes are most efficient at eliminating rather than just reducing the electron cloud - actual concern: remove power on clearing electrodes