Test Chamber Assembly, 1.5M Long (59.00”) Vacuum Tube, 4.00 OD x 3.50 ID Vacuum Tube, 3.75 OD x 3.51 ID 3.375” CFF, Non-Rotatable Feedthrough, Ceramtec.

Slides:



Advertisements
Similar presentations
Construction of electronic systems C.Bohm Components + connections 2-pole (resistors), 3-pole (transistors) 4-pole (transformers) pole vacuum tubes)
Advertisements

Present Procedure for cutting stuck casing on Drilling PLATFORM
LWIR FPA Mirror Image Problem & Recovery April 11, 2011 Roy W. Esplin Dave McLain.
Manual Flo-tap Installation Instructions
ATD Assembly. ATD Assembly #1 Dewar Assembly #1 Status: Dewar has been completely assembled and vacuum tested. No vacuum leaks were detected on the outer.
MICE Collaboration meeting at RAL 26 th Oct ~ 29 th Oct, 2004 Wrap up on Radiation Shielding Module Design Stephanie Yang 26 th October, 2004.
R&D Plan on Clearing Electrode using the KEKB LER Y. Suetsugu and H. Fukuma, KEKB M. Pivi and L. Wang, SLAC at KEK.
9-12 April 2007 International Linear Collider DR electron cloud R&D effort: Clearing electrode and triangular fin M. Pivi T. Raubenheimer, J. Seeman, T.
E-Zapper Exit - Plasma Window 18 MeV Electron Accelerator Plasma Igniter Plasma Window Beam in Atmosphere Fast- Acting Valve 2 um Be Window Mechanical.
A simple clamping device for the Solid absorber Wing Lau, Oxford.
Module Vessel Connection Concept Steve Virostek Lawrence Berkeley National Laboratory AFC Module Meeting April 23, 2004.
1 Issues concerning the Design of the Tracker Solenoids Michael A. Green Lawrence Berkeley National Laboratory 17 August 2005.
Dean R Walters November 15, 2004 Integration of the Vacuum and Diagnostics with the Undulator By Dean R Walters APS.
DELTA Quadrant Tuning Y. Levashov, E. Reese. 2 Tolerances for prototype quadrant tuning Magnet center deviations from a nominal center line < ± 50  m.
ZQNA Electrostatic Quadrupoles for ELENA Transfer Lines 1.Conceptual design 2.Performance 3.Engineering details 4.Interfaces 5.Production planning D. Barna,
Status of 325MHz coupler S. Kazakov 11/29/ MHz coupler structure.
Status of vacuum & interconnections of the CLIC main linac modules C. Garion TE/VSC TBMWG, 9 th November 2009.
BRUSHLESS HIGH VELOCITY RACING FAN. Brushless high velocity racing fan  Brushless direct current motor  13.8 volt (working range 10-16v)  Current:
KICKER LNF David Alesini LNF fast kickers study group* * D. Alesini, F. Marcellini P. Raimondi, S. Guiducci.
Recent FETS Ion Source Measurements UK Neutrino Factory Plenary Meeting 8-9 June 2010 Rutherford Appleton Laboratory Dan Faircloth Faircloth.
TURBO FLANGES We specialize in design, CNC milling, metal turning, plasma cutting, and TIG welding all done in house. Please contact us for further information.
LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 06 June 2006 No 1 /17 LARP Phase II Secondary Collimator RC1 Collimator Test Program Plan Forward Revised.
SQXF Winding Test Proposal Concept at LBNL Dan Cheng Sept 17, 2013.
LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 16 May 2006 No 1 /22 LARP Phase II Secondary Collimator RC1 Collimator Test Program Revised 5/15/06.
IPC RADIAL- COMPONENTS Angularity is required for clearance in the next higher assembly; or That edge of the body nearest the surface of the.
Phase 1 FPIX cooling tubes routing in HC Kirk Arndt - Purdue124 April 2012.
Low Energy RHIC e - Cooling Meeting Minutes – 11/19/14 1. Cooling Section Magnets and Power Supplies –Most of power supplies will be from ERL (R. Lambiase).
Argontube Detector design Laffranchi Marco, Meregaglia Anselmo, Messina Marcello, Rubbia Andre’ Bern,
Design Review RSXS - EndStation Review on Vacuum Chamber Stand and Supports Location Beamline Roll-up Endstation.
W. Morse PEDM Review1 Electric and Magnetic Fields W. Morse BNL.
Study Plan of Clearing Electrode at KEKB Y. Suetsugu, H. Fukuma (KEK), M. Pivi, W. Lanfa (SLAC) 2007/12/191 ILC DR Mini Work Shop (KEK) Dec.
1 Status of Vacuum Process Facilities at SSL 16 October 2009 Sharon R Jelinsky Space Sciences Laboratory, UC Berkeley.
TBM Vacuum considerations Alex Vamvakas 15/07/2015.
Low Energy RHIC e - Cooling 1 IP2 64 m LEReC-I (1.6-2MeV): Gun to dump SRF gun used as a booster cavity.
Structural Drafting Assembly Clearance Dimensions.
Exit slit toroid, with horizontal steering servo-loop to slits monochromator, with mirror and grating scanning Beamline Mono residual steering effects.
A simple clamping device for the Solid absorber Wing Lau, Oxford.
Prototype Review 04-Sept Different side-closeout to allow petal end-insertion concept…self- guided… Only backup from last review in July…
MICE RF Coupler Modifications Update 4/30/2015 Allan DeMello.
Clive Field, Reggie Rogers, Venkat Srinivasan Undulator Week: BFW Card Status Update 01/23/ BFW Card - Physics Requirements.
MICE Coupling Coil Fabrication Steps to Complete Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
Straw Individual assembling device and the straw linearity preliminary measurements L.N.Glonti
The reading is 7.38 mm. The reading is 7.72 mm.
FETS Ion Source Diagnostics: The Pepperpot
Radiation Shutter Re-Purposing Roy Preece STFC RAL 18 th December 2014.
Rigaku Rotary Assembly Top View shows “Inlet” side. This couples with 4-ea ¾“ bolts to “Offset” flange. This flange has central hole 1” offset from center.
Scintillating Fiber BLM with PMTs
PEP-II test chambers installation
MECHANICS OF THE FORWARD STRAW TUBE TRACKER (preliminary) Federico Evangelisti INFN - Ferrara GSI - 7/11 dicember 2009.
International Linear Collider R&D on electron cloud (SLAC)
MICE Meeting at RAL, Oct-23, 2005
Barrel EMC assembling (EDMS DOCUMENT NUMBER /1)
Overview of Mechanical Design
EBTF Design Review Technical Meeting Group
Integration issues at IHEP
Sphere Option for Helical spring CF16 Bellows Adjustment bolts (horizontal plane) CF38.
Challenges for FCC-ee MDI mechanical design
Hall C Down Stream Beam Pipe And Dump Interface Design
The Quench Detection-Wire-Feedthrough Plug-In of W7-X
Structural Drafting Assignment S-4.
Summary of the checking items of the Module-C design
Beam Finder Wire Assembly Undulator System
XFEL Collimation and Beam Switchyard Vacuum Issues
Structural Drafting Assignment S-3.
questions for cern – doyle rev 7/09/07 1/5
LARP Phase II Secondary Collimator RC-1
Ka-Band Feed Design and Prototype Tests
CEPC-650MHz Cavity Cryomodule
A # Gasket spacing between flanges are not included in dimensions.
Solid inner shelf/brace isolates midrange and tweeter from woofers
Presentation transcript:

Test Chamber Assembly, 1.5M Long (59.00”) Vacuum Tube, 4.00 OD x 3.50 ID Vacuum Tube, 3.75 OD x 3.51 ID 3.375” CFF, Non-Rotatable Feedthrough, Ceramtec # W Mounted to 1.33” CFF 3.375” CFF, Rotatable Tube, 2.00” OD x 1.73” ID Flange to Flange Length = 59.00” Collector Port Flange 1.33” CFF access port

Test Chamber with Electrode Electrode, Copper 0.063” x ~1.0” x 50.0” (49.606” between feedthrough centers) Clearance between Electrode and chamber Varies between.070” and.080”

Electrode Connection Space between chamber and electrode = 0.08” (2mm all around) Note: Feedthrough not Located correctly

Electrode Connection Collector Port 1.33” CFF for access to electrode connection

Electrode Connection Collector Port, 20.00” x 1.00” Collector Port Flange, 21.50” x 2.50” 0.125” Dia. Holes