Measures for containing an increase in pipes’ dose-equivalent rate in the hydrogen-injected environment at the Shimane Nuclear Power Station Unit 1 1 Tomohiro.

Slides:



Advertisements
Similar presentations
Chapter 2 Chemistry of Life
Advertisements

Generic Pressurized Water Reactor (PWR): Safety Systems Overview
Czech Hydrometeorological Institute Assessment of air pollution by cadmium CZECH REPUBLIC EMEP Heavy metal case study Milan Váňa, Pavel Machálek + MSC-E.
ANTIOXI – Advisory Board Meeting Klas Lundgren Page ANTIOXI Description of Work Packages 3 and 4 Klas Lundgren.
11-Apr ISOE International ALARA Symposium JNES, Tokyo, JAPAN, August,2013 Presentation on: Dose Reduction and Management during Overhauling.
Filippo Parodi /Paolo Capobianco (Ansaldo Fuel Cells S.p.A.)
January 6. January 7 January 8 January 9 January 10.
Pre-Filming Method of Reducing Metal Release from Alloy 690 for SG in Primary Water of PWR 2009 ISOE Asian ALARA Symposium Aomori September 9, 2009 Sumitomo.
1 August 30-31,2010 Kyushu Electric Power Co.,Inc. Nuclear Power Operatio n Dept. Masahiro Yoshinaga Approach for dose reduction in Sendai NPS August 30-31,2010.
Calcite Contactors for Corrosion Control
Environmental Geotechnology Presentation Naval Air Station, Pensacola, Florida.
Summer Co-op Experience: OPG Aditi Garg. Darlington Nuclear G.S Located in Bowmanville, ON.
1 WASTE CHARACTERIZATION METHODS S. Vanderperre Belgatom Vanderperre, Belgatom, chapter 7.
Cr and Co release reduction from stainless steels in PWR and BWR 2009 ISOE Asia ALARA Symposium Aomori EPRI Radiation Protection Conference September 9,
M. GIRARD – CEA / EFDA MEETING - CADARACHE, January th, 2005 Task TW4 – TSS - SEA 5.5 Validation of EU Safety Computer codes Validation of PACTITER.
The Periodic Table of the Elements
Corrosion Prevention Corrosion of steel, which consists mainly of iron, is a major problem in our society. But steps can be taken to prevent it.
Whole School Attendance Whole School Attendance 94.64% Overall School Absence 5.36%
Feedwater Systems Reliability Users Group Annual Meeting January 20-23, 2014 Feedwater Pump Thrust Bearing Failure Presented By: Kurt J. Weis Rotating.
Designing an Internal Corrosion Program NACE Eastern Area Conference Roy D. Fultineer Jr.
Sustainable Management Resources Inc Join SMRI as we work on: “Creating a Sustainable New Economy” SMRI, San Diego CA, ~ ~ Steve Kaplan ~
Control of Particulate Matter from a Sabatier Catalyst Bed HSL 126 Loel Goldblatt, Hamilton Sundstrand Space Systems International, Inc. Karen Murdoch,
Measures for Reduction of Radiation Exposure at Higashidori Nuclear Power Station Nuclear Power Dept. Tohoku Electric Power Co.
GUIDED BY- Mr. Bipin Saxena PRESENTED BY – Giri Pankajkumar Shyamkant ENR. NO Patel Harsh Mukesh bhai ENR. NO Sevak jigar.
Advanced Test Reactor.
© Hitachi-GE Nuclear Energy, Ltd All rights reserved. コピーライトの表示については、作成元で責任を持って適宜変更してください。 ⇒ 2010 ISOE Asia ALARA Symposium Hitachi- GE Nuclear.
ISOE ・ ATC 2006 ALARA Symposium 1 Approach of Hitachi for Dose Rate Reduction October 12, 2006 Hitachi, Ltd.
0 Zinc Injection from Hot Functional Test in Tomari Unit 3 Nov MITSUBISHI HEAVY INDUSTRIES, LTD. HOKKAIDO ELECTRIC POWER CO., INC.
EPRI Radiation Management Program: Review of Radiation Field Reduction Strategies HPS Power Reactor Session July 12 th, 2009 Dennis Hussey Sr. Project.
PSN CDCC Rev2 Copyright 2009, Toshiba Corporation. 1 Precise control of Fe concentration in feedwater for Co-60 concentration reduction.
EXAMPLE FEP REPORT – Flow Erosion Assessment Program Investigation Report – May 2009 EIMAGING POWER GENERATION.
Genesis Pipeline Spill Collins, Mississippi Genesis Pipeline Co. USA Application of RamSorb/Oil Gator. Spill detected Dec 20, First RamSorb/Oil Gator.
Kanazawa Sapporo Kochi Fukuoka Naha Okayama ・ Chugoku Core Network Node A (Okayama) ・ Hiroshima Moto-machi (Hiroshima) ・ Teleport Okayama (Okayama) ・ Tottori.
Conference May 12th 2011 Report of Japan’s state after the earthquake The Tourism in Japan 1.Map 2.The impact on Japanese Tourism 3.JNTO Website 4.FAQ.
1 Dose reduction actions in Tsuruga-2 NPP Hiroshi WADA, Yuuichi HAMANAKA, Masayuki FUKUDA Tomomi YOSHINAGA, Eiji SANEHIRA,Masahiro YANO, Yasuo UNI, Kazushige.
1 TEPCO’s Challenges for Occupational Exposure Reduction -Installation of Additional CF in Fukushima Daiichi NPP- Shunsuke HORI, Akira SUZUKI Tokyo Electric.
Table of Contents  General Description  Concept of RX Vessel and Location of Defect  Radiation Dose Control  Repair Schedule of Bottom Header Defected.
Chapter 5 Weathering and Soil
ISOE/ATC ALARA Symposium 2006 The Japan Atomic Power Company 1 Progress of the Zinc Injection in Tsuruga NPP Unit 2 October 12, 2006 THE JAPAN ATOMIC POWER.
Desorption mechanism of hydrogen isotope from metal oxides Contents 1.Background 2.Experimental system and Mechanism 3.Results and discussion 4.Conclusions.
Water, Acids, Bases and Salts
§7.13 Corrosion and protection of metals. 1) Corrosion: Destruction of materials due to the chemical, electrochemical and physical attack of the media.
Copyright © by Holt, Rinehart and Winston. All rights reserved. ResourcesChapter menu Chemistry of Life Chapter 2 Table of Contents Section 1 Composition.
Copyright © by Holt, Rinehart and Winston. All rights reserved. ResourcesChapter menu To View the presentation as a slideshow with effects select “View”
Copyright 2008, Toshiba Corporation. CDCC PSN ISOE International ALARA Symposium, Tsuruga Japan,13-14 Nov., Reduction.
All Rights Reserved. Copyright © 2008, Hitachi-GE Nuclear Energy, Ltd. 1-0 ※ この資料の複写、第 3 者への公開を固く禁じます。 All Rights Reserved. Copyright © 2009, Hitachi-GE.
Dose Rate Reduction Methods at Shimane Nuclear Power Station Tadashi Kanaoka1, Hiroyasu Kajitani1, Tsuneo Sato1, and Naoshi Usui2 1The Chugoku Electric.
The Improvement of ALARA for the Steam Generator Maintenance Radiation Safety Department The 3 rd Plant, Ulchin Nuclear Power Site.
WP2 progress on safety E. Baussan EUROnu CB Meeting Monday 10th & Tuesday 11th June 2011 CERN, Geneva, Switzerland.
Active gas system status & plans. S.Konovalov, K.Zhukov, K.Vorobev.
Quad Cities Unit One Cobalt-60 Experience Presenter:Kenneth Ohr Authors:Kenneth Ohr Radiological Engineering Manager - Quad Cities Ellen Anderson Director.
ISOE Asian Technical Center 2005ALARA Mini-Workshop Fugen Nuclear Power Station, JAEA- 1 Demonstration of Zinc Injection Technique in Fugen Nuclear Power.
1 Activitiesfor Dose Reduction Hamaoka Nuclear Power Station Chubu Electric Power Co.,Inc. November 2005.
Hokuriku Electric Power Company Dose Reduction Measures at Shika Nuclear Power Station Unit-1 Takahashi Toshihiko Hokuriku Electric Power Company.
Zinc Addition: Theory and Experience Presented To: KEPRI & KHNP Presented By: Dr. Robert Litman.
Nuclear power plant Performed by Zhuk A.D.. Purpose of this presentation is to show importance and danger of nuclear power plant. My opinion: I think.
2013 ISOE International ALARA Symposium
STATUS OF NJ NUCLEAR PLANTS SINCE LAST MEETING
Boreskov Institute of Catalysis,
Abdelaziz Gherrou, Ph.D., chemist-researcher
Operational Experience with Zinc Injection at Angra 2
The Success of the ALARA Principle – the View of an Inspector
Components Demineralizers.
Using Biological Activity Reaction Tests (BART) to Monitor Microbially-Influenced Corrosion in Cast Iron Pipes Darlyce Simpson1, Steve Craik1 and Rasha.
Dictation practice 2nd Form Ms. Micaela-Ms. Verónica.
Hanwei GRE Pipe Comparison to Steel Pipe
Timeline of Key Events B&W Safety Assessment Indicates Head Inspection Being Performed, Sources of Leaks Identified, No Other Inspections Required D-B.
The Improvement of ALARA for the Steam Generator Maintenance
Presentation transcript:

Measures for containing an increase in pipes’ dose-equivalent rate in the hydrogen-injected environment at the Shimane Nuclear Power Station Unit 1 1 Tomohiro Minami The Chugoku Electric Power Co., Inc. Shimane Nuclear Power Station

All Right Reserved. Copyright © 2006,THE CHUGOKU ELECTRIC POWER CO., INC. Table of Content ○ Outline of Shimane Nuclear Power Station ○ Hydrogen injections performance at Shimane Nuclear Power Station ○ Transition of PLR piping dose-equivalent rate ○ Management of gradual hydrogen injection termination ○ Current piping dose-equivalent rate ○ Future tasks 2

All Right Reserved. Copyright © 2006,THE CHUGOKU ELECTRIC POWER CO., INC. Niigata Tokyo Fukuoka Hiroshima Osaka Sendai Kyoto CHUGOKU REGION Sapporo SHIMANE NUCLEAR POWER STATION Shimane Prefecture Yamaguchi Prefecture Hiroshima Prefecture Okayama Prefecture Tottori Prefecture Hiroshima Matsue Yamaguchi Yonago Okayama ★ Outline of Shimane NPS(1/2) 3

All Right Reserved. Copyright © 2006,THE CHUGOKU ELECTRIC POWER CO., INC. Outline of Shimane NPS(2/2) Unit No.Capacity (MW) Reactor Type Commerci al Operation 1460BWRMar BWRFeb.1989 Unit 2Unit 1 4

All Right Reserved. Copyright © 2006,THE CHUGOKU ELECTRIC POWER CO., INC. Hydrogen injections performance at Shimane Nuclear Power Station 5 YearOutage/Cycle Feed-water hydrogen concentration (ppm) Description January th outage -・ Installed a hydrogen injection facility (Trailer system) February st cycle 0 ~ ・ Gradual injection test (increment of 0.1ppm) ・ Started continuous injection March nd cycle0.45 ・ Conducted gradual injection and regular termination ・ Changed hydrogen concentration due to influence on the MS monitor May May nd outage -・ Conducted shroud replacement (Chemical decontamination inside the reactor in the HOP method) April rd cycle0.40 ・ Changed hydrogen concentration due to influence on the MS monitor December th cycle0.40 ・ Conducted gradual injection and regular termination February th outage - ・ PLR piping repair work (Chemical decontamination of PLR pump inlet and outlet piping in the HOP method) August th cycle -・ Preliminary oxidative operation ・ Conducted gradual injection and regular termination

All Right Reserved. Copyright © 2006,THE CHUGOKU ELECTRIC POWER CO., INC. Transition of PLR piping dose-equivalent rate (Pump A (21th outage)) PLR(A) inlet vertical piping PLR(A) outlet vertical piping 6

All Right Reserved. Copyright © 2006,THE CHUGOKU ELECTRIC POWER CO., INC. Transition of PLR piping dose-equivalent rate (Pump B (21th outage)) PLR(B) inlet vertical piping PLR(B) outlet vertical piping 7

All Right Reserved. Copyright © 2006,THE CHUGOKU ELECTRIC POWER CO., INC. Dose-equivalent rate distribution in the axis / circumferential directions at the PLR pump outlet piping 21st outage Dose-equivalent rate of the A-PLR pump outlet piping flow 8 The fluctuation of dose- equivalent rate in the axis and circumferential directions was evaluated as attributable to cladding buildup and the increase of dose-equivalent rate.

All Right Reserved. Copyright © 2006,THE CHUGOKU ELECTRIC POWER CO., INC. Base material In the HWC environment (low hydrogen peroxide), reactor water is in reductive atmosphere, oxidizing chromium acid forms clad deposits on piping internal surfaces. In the NWC environment, chromium oxide clad on piping's internal surfaces ionizes and elutes into the reactor water. Chromium forms under the HWC / NWC environment 9 HWC environment NWC environment Cr 2 O 3 (Insoluble) CrO 4 2- (Soluble)

All Right Reserved. Copyright © 2006,THE CHUGOKU ELECTRIC POWER CO., INC. Hydrogen injection termination/start pattern (21st cycle) Hydrogen injection termination/start pattern in the 21st cycle Feed-water hydrogen concentration ( ppm ) Continuous injection started at the feed-water hydrogen concentration of 0.5ppm Termination of hydrogen injection associated with CR pattern adjustment Feed-water hydrogen concentration 0.5ppm→0.1ppm(maintained for 24 hours )→Termination 21st cycle21st outage February 1998 Start of injection 0.5ppm 0.1ppm Continuous operation for around 300 days 10 ( day )

All Right Reserved. Copyright © 2006,THE CHUGOKU ELECTRIC POWER CO., INC. Transition of reactor-water conductivity and chromium acid concentration (21st cycle) 11 ( Time )

All Right Reserved. Copyright © 2006,THE CHUGOKU ELECTRIC POWER CO., INC. External layer (Ferrite) Internal layer(Chromite) Clad deposit (Fe, Cr) Base material Radioactive ion Shimane Unit 1 21st outage Continuous 300-day HWC operation increased the amount of chromium deposit from reactor water. The change of environment (HWC -> NWC) eluted chromium, causing uneven piping's internal surfaces, thereby increasing the amount of cladding. Mechanism of how the dose-equivalent rate of PLR outlet piping increased (21st outage) 12

All Right Reserved. Copyright © 2006,THE CHUGOKU ELECTRIC POWER CO., INC. Mechanism of how hot spots developed at the PLR pump outlet PLR pump outlet piping Swirls at the PLR pump and elbow outlets disturbed the flow significantly. Environmental change and flow disturbance at the pump outlet increased partial dissolution of Chromium oxides on piping's internal surfaces and aggravated surface unevenness. The amount of clad deposits at the PLR pump outlet piping showed a localized increase. Increase of dose-equivalent rate at the PLR pump outlet piping 13 After extended stable operation with hydrogen injection (around 300 days), terminated hydrogen injection and resumed the injection upon changing the pattern (12/1998). Reactor water environment Reductive → Oxidative Reactor water’s radioactive concentration increased upon termination of hydrogen injection.

All Right Reserved. Copyright © 2006,THE CHUGOKU ELECTRIC POWER CO., INC. Management of gradual hydrogen injection termination (reflection to the 22nd cycle) Pattern of hydrogen injection termination / start Termination pattern Feed-water hydrogen concentration 0.45ppm → 0.2ppm (maintained for 24 hours) → Termination (3 days) → 0.2ppm (maintained for 24 hours) → 0.45ppm Maintained for 24 hours 0.45ppm 0.2ppm 0ppm 0.45ppm 0.2ppm Hydrogen injection termination once every three months 14 Operation for around 3 months 3 day stoppage

All Right Reserved. Copyright © 2006,THE CHUGOKU ELECTRIC POWER CO., INC. Transition of reactor-water conductivity and chromium acid concentration (21st and 22nd cycles) 15 ( Time )

All Right Reserved. Copyright © 2006,THE CHUGOKU ELECTRIC POWER CO., INC. Transition of PLR piping dose-equivalent rate (Pump A (22nd outage)) PLR(A) inlet vertical piping PLR(A) outlet vertical piping 16

All Right Reserved. Copyright © 2006,THE CHUGOKU ELECTRIC POWER CO., INC. Transition of PLR piping dose-equivalent rate (Pump B (22nd outage)) PLR(B) inlet vertical piping PLR(B) outlet vertical piping 17

All Right Reserved. Copyright © 2006,THE CHUGOKU ELECTRIC POWER CO., INC. Transition of PLR piping dose-equivalent rate (Pump A (23rd outage)) PLR(A) inlet vertical piping PLR(A) outlet vertical piping Shroud replacement work (Chemical decontamination inside the reactor) ↓ Shroud replacement work (Chemical decontamination inside the reactor) ↓ 18

All Right Reserved. Copyright © 2006,THE CHUGOKU ELECTRIC POWER CO., INC. Transition of PLR piping dose-equivalent rate (Pump B (23rd outage)) PLR(B) inlet vertical piping PLR(B) outlet vertical piping 19 Shroud replacement work (Chemical decontamination inside the reactor) ↓ Shroud replacement work (Chemical decontamination inside the reactor) ↓

All Right Reserved. Copyright © 2006,THE CHUGOKU ELECTRIC POWER CO., INC. Base material Mechanism of how radioactive deposits built up in the HWC environment (23rd outage onward) 20 HWC Environment NWC Environment Radioactive ion Clad deposits(Fe 、 Cr) External layer (Ferrite) Internal layer (Chromite) The HWC environment (low hydrogen peroxide) encourages a buildup of the external layer (ferrite) with low protective property, and an internal layer (chromite) that readily captures Co, thereby increasing the amount of Co-60 deposit. Operation under the NWC environment forms a dense external layer. This reduces elution of metal ions from the base, and contains the growth of the external layer (ferrite) and internal layer (chromite), thereby decreasing Co-60 deposits.

All Right Reserved. Copyright © 2006,THE CHUGOKU ELECTRIC POWER CO., INC. Current PLR piping dose-equivalent rate (Pump A (25th outage)) PLR(A) inlet vertical piping PLR(A) outlet vertical piping Shroud replacement work (Chemical decontamination inside the reactor) Shroud replacement work (Chemical decontamination inside the reactor) PLR piping repair work (Chemical decontamination) PLR piping repair work (Chemical decontamination) 21

All Right Reserved. Copyright © 2006,THE CHUGOKU ELECTRIC POWER CO., INC. Current PLR piping dose-equivalent rate (Pump B (25th outage)) PLR(B) inlet vertical piping PLR(B) outlet vertical piping Shroud replacement work (Chemical decontamination inside the reactor) Shroud replacement work (Chemical decontamination inside the reactor) 22 PLR piping repair work (Chemical decontamination) PLR piping repair work (Chemical decontamination)

All Right Reserved. Copyright © 2006,THE CHUGOKU ELECTRIC POWER CO., INC. PLR piping dose-equivalent rate after chemical decontamination (comparison with other plants) 23

All Right Reserved. Copyright © 2006,THE CHUGOKU ELECTRIC POWER CO., INC. Future tasks Dose-equivalent rate assessment after preliminary oxidization operation Application to Shimane Unit 2 Introduction of a startup hydrogen injection facility at Shimane Unit 1 24

All Right Reserved. Copyright © 2006,THE CHUGOKU ELECTRIC POWER CO., INC. Thank you. Measures for containing an increase in pipes’ dose-equivalent rate in the hydrogen-injected environment at the Shimane Nuclear Power Station Unit 1 25