RAWS Registered Automotive Workshop Scheme Technical Requirements.

Slides:



Advertisements
Similar presentations
MAJOR REPAIRS AND ALTERATIONS
Advertisements

Example 1: A folder containing a number of separate A4 sheets. The sheets would need to be copies, as actual artifacts / products should not be sent. Photographic.
Alan Gascoyne - Director, Certification Steven Hoy - Engineer, Certification Judi Farrell - Policy & Legislation Team Simon Lilley - RAWS Team RAWS INFORMATION.
Review Questions Business 205
Revenue Audits Returns processed in a “non-judgemental” manner Revenue Audit of selected returns. Objective is to promote voluntary tax compliance. Audit.
RAWS A guide to the electronic e-form system Registered Automotive Workshop Scheme.
First Article Inspection Report
Completing the Audit Engagement
ESOS COMPLIANCE PROCESS 26 FEBRUARY REGULATORY APPROACH.
CNP DIRECTORS’ WORKSHOP Administrative Review Be Prepared! March 14, 2014.
LEGISLATION OVERVIEW & PROCEDURES Douglas Walker Chairman Scottish Registration Board Structural Engineers Registration Ltd.
SAE AS9100 Quality Systems - Aerospace Model for Quality Assurance
1. Definition of a Reconciliation 2. Importance of a Reconciliation 3. When to Prepare a Reconciliation 4. Items Needed to Prepare a Reconciliation 5.
H2020 Finance Presentation
Notice of Compliance Audit
TS16949 requirements Subjects –Audit planning –Recertification audit requirements –Auditing Remote supporting functions.
5.2 Personnel Use competent staff Supervise as necessary
Responding to Inspection Findings
Copyright © 2006 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin 17-1 Chapter Seventeen Completing the Engagement Chapter Seventeen.
SPDES General Permit for Stormwater Discharges During Construction Activity GP Mike Jurkowski, CPESC, NYSDOT - Summary of Changes From GP
Vehicle Certification in Australia Peter Robertson Assistant Secretary Vehicle Safety Standards (Administrator of Vehicle Standards)
World Health Organization
DOCUMENTATION.
Unit Award Scheme UNIT WRITING TRAINING Copyright © AQA and its licensors. All rights reserved.
Reporting on the Federal Financial Report “SF-425” Presented by HOMELESS GRANT AND PER DIEM PROGRAM and The Financial Service Center 1.
Effective Management and Compliance 1 ANA GRANTEE MEETING  FEBRUARY 5, 2015.
Planning an Audit The Audit Process consists of the following phases:
February 2007 Commercial Vehicle Drivers Hours of Service Module 24: Daily Log Audits.
Illinois State Board of Education Innovation and Improvement Division January 13, 2010 An Introduction to the 21 st Century Community Learning Center Self.
Entry Pathways General Administration September 2012.
Railway Transport Equipment (RTE) Certification Railway Transport Equipment Certification Procedure Application for railway transport equipment certification.
Allen Hughes State Materials Office
Procedures and Forms 2008 FRCC Compliance Workshop April 8-9, 2008.
Chapter 17 Completing the Audit Engagement McGraw-Hill/IrwinCopyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
October SYS 1 Quality Audit and ISO9000 Quality Standard Kinnison, Chapter 17.
NH Department of Education Division of Program Support Bureau of Nutrition Programs and Services Verification Module for National School Lunch Program.
What Documentation Needs to be Submitted With an Approval Application?
S15: Supervision and review. Objective of supervision and review  To ensure that the audit is done efficiently and effectively so that the audit opinion.
Entry Pathways General Administration April 2012.
Delphi E&S Instructions for Submitting PPAP for Component Parts to the PPAP Dropbox on the Websitewww.delphisuppliers.com Revised.
Design Documentation Clint Kehres, Brian Krouse, Jenn Shafner.
1 Kingsley Karunaratne, Department of Accounting, University of Sri Jayewardenepura, Colombo - Sri Lanka Practice Management.
IAEA International Atomic Energy Agency Methodology and Responsibilities for Periodic Safety Review for Research Reactors William Kennedy Research Reactor.
1 Overview of the NF 1680 Evaluation of Performance Process Overview/Training Charts April 7, 2008.
CABLING SYSTEM WARRANTY REGISTRATION. PURPOSE OF CABLING REGISTRATION.
Collaborating for Quality Quality Assurance (QA) & Quality Control (QC) in the Accelerator Project (ACCSYS) Matthew Conlon ACCSYS QA/QC
Standards ? What other Standards? Eddie Welsh EQA Assessment Manager.
Welcome. Contents: 1.Organization’s Policies & Procedure 2.Internal Controls 3.Manager’s Financial Role 4.Procurement Process 5.Monthly Financial Report.
Ismar Financial report procedures. Ismar Financial reporting For each reporting period of activity Each partner shall produce a “Periodic Management Report”
Consumer.vic.gov.au Becoming an incorporated association.
Alternative Textbook Formats Accommodation Guide for using your accommodation of Alternative Textbook Formats Four simple steps to select and request specific.
Collaborating for Quality through the Project Quality Plan Matthew Conlon ESS ACCSYS QA/QC Quality Learning & Planning.
QUALITY ASSURANCE MODULE 3. Definitions Quality Assurance - A process/effort that ensures that processes are followed, that the processes of doing right.
NASC Audit Program & State Registrations. NASC Audit Program & State Registrations.
BSB Biomanufacturing CHAPTER 4 GMP – Documentation Part I (SOP)
ISO/IEC
Tender Evaluation and Award Process
Customer Online Ordering
BASIC AUDITING CONCEPTS: MATERIALITY, RISK ASSESSMENT, AND EVIDENCE
ExTAG Training Workshop Calgary 2012 QAR related Issues
Congratulations, your application has been successful… …what next?
c.net5 Online Management
Transmitted by the expert
General Data Protection Regulation
Introduction to Sponsor Balloting using the myBallot™ system
First Article Inspection
SENSE Completion Process
Alternative Textbook Formats Accommodation
District and Club Qualification
Part II Objectives Describe how policies and procedures are used
Presentation transcript:

RAWS Registered Automotive Workshop Scheme Technical Requirements

Steps to Approval Company Quality System Stage 1 audit Sample vehicle Stage 2 audit RAW inspection Plated vehicle

The Raw Inspection Before the RAW Inspection The RAW Inspection After the RAW Inspection

Before the RAW Inspection Only one technical document is sent (electronically) to DOTARS (for each vehicle plated). This is the Vehicle Inspection Certificate (VIC). The VIC lists references (or titles) of completed documents held at the workshop.

The Vehicle Inspection Certificate (VIC) Vehicle and Variant details as per the SEVS ruling (old NVS sheet) Incoming Vehicle Inspection Report (IVIR). Consumer Information Notice (CIN). Completed Vehicle Report (CVR). Evidence for each Australian Design Rule (ADR) applicable to the vehicle. –Sample Evidence (SVE) and – Each Vehicle (or Specific) Evidence (EVE).

The VIC NOTE!! The vehicle variant identification information must be copied directly from the Specialist and Enthusiast Vehicle Scheme (SEVS) ruling. Use “drop down boxes” where provided and put all entries in capital letters.

The VIC

IVIR CIN CVR SVE EVE The VIC Signatory signs that the vehicle meets all the RAW requirements as per the documents and other information listed on the VIC!

The VIC - Incoming Vehicle Inspection Report (IVIR). Also known as the Initial Inspection Report. Check for damage. –Guidelines in the determination (Inspection and testing). –NOTE!! Additional check for past repairs (RAW approval condition on plating).

The VIC - Consumer Information Notice (CIN). Informs the consumer of the origin and compliance of the vehicle. Replacement of wear and tear items. Modification of vehicle for compliance. Part numbers/markings where they can be confirmed on the vehicle. NOTE!! See Regulation 58, following the instructions in Schedule 1.

The VIC - Completed Vehicle Report (CVR). Checklist of the vehicle’s configuration and the modifications done. Guidelines in the determination (Inspection and Testing). NOTE!! Ideal place to put the Each Vehicle Evidence (EVE).

The VIC - Sample Evidence (SVE) Evidence to demonstrate that the vehicle design meets the ADRs as required by the sample evidence requirements in the determined evidence guidelines. Different types available for different ADRs and different vehicle categories. Sample evidence testing may be contracted out and must meet the determined procedures for inspecting and testing guidelines.

The VIC - Sample Evidence (SVE) Examples of evidence types: –E Mark - an approval mark on a component or system that has been tested to an accepted International standard. –Japanese Origin - evidence that the vehicle was registered in Japan (and so met the Japanese standards when new). –Other Specified - acceptable alternative test methods or calculations.

The VIC - Sample Evidence (SVE) (cont) Examples of evidence types: –Full Volume Vehicle - evidence that particular vehicle parts are the same as on a vehicle available in the mainstream market. –Full Evidence - a test done to all the requirements of the ADRs.

SVE - Format

SVE - Source SVE NOTE!! SVE does not have to come from testing of your sample vehicle only.

SVE - Traceability All evidence must be traceable from the reference on the VIC down through all relevant documents and to the vehicle.

SVE - Traceability (cont) It is important to: –Use VIC references that change when the underlying documents change eg R0001RevA, R0001RevB or –Use VIC references that do not change when the underlying documents change but rely on a well developed (and on-site) document control system to identify which revision is current. –NOTE!! The bottom method may be difficult to show at audit, especially where using purchased evidence packages.

SVE - Traceability - Example 1 SVE Example of evidence traceable between vehicles Test T001 listing part numbers and photographs of tested components SVE referencing Test T001 and listing part numbers and photographs of your vehicle components.

SVE - Traceability - Example 2 VIC - SVE1 - SVE2 - SVE3 Example of evidence traceable through documents. SVE1 Test T001 Also see Test T002 Test T002 Also see Test T003 Test T003 Test T004 - Test T004

SVE - Traceability - Guidelines –Parts need to be traceable when they could affect compliance to the determined evidence guidelines. –NOTE!! Ideally, markings or part numbers should be recorded. Where not marked, sufficiently detailed photographs should be taken.

The VIC - Each Vehicle Evidence (EVE). Evidence to demonstrate that your vehicle meets the ADRs as required by the each vehicle checks in the determined evidence guidelines. Different requirements set for different ADRs and different vehicle categories.

The VIC - Each Vehicle Evidence (EVE) (cont). EVE evidence testing must meet the determined procedures for inspecting and testing guidelines. –NOTE!! The VIC mistakenly calls the EVE “Specific” evidence in its heading.

EVE - Format

EVE - Using the CVR CVR EVE NOTE!! Each Vehicle Evidence (EVE) is usually done as part of the Completed Vehicle Report (CVR) checks.

Determined Evidence Guidelines Includes other items as well as the ADR tests and checks. LHD to RHD conversions must meet Vehicle Standards Bulletin No.4 Vehicle must meet State/Territory roadworthiness requirements. Vehicle must meet the EVE wear and tear requirements.

The RAW Inspection When - stage two audit has been done and a VIC has been submitted. Where - The RAWS (or RAWS applicant) workshop. Who - Two RAWS inspectors and (usually) a State/Territory inspector.

The RAW Inspection (cont) What –General arrangement Two day inspection of the vehicle, evidence documents, work instructions, test procedures test equipment. ADR test for VIC signatory applicant - open book. RAWS Competency test for VIC signatory applicant - closed book. Fit and proper person checks - sighting originals of police checks.

The RAW Inspection (cont) –Conduct RAWS signatory (or applicant) to be generally available over the time period. NOTE!! The RAW/applicant should not feel obliged to provide lunch to the inspectors. However, a shared working lunch is acceptable practice.

The RAW Inspection (cont) –Vehicle inspection Visual compliance to the ADRs as per the determined evidence guidelines. Traceability of the vehicle components to the sample, each vehicle evidence and the CIN.

The RAW Inspection (cont) –Evidence Traceability of the sample and each vehicle evidence to the VIC. Confirmation that evidence meets the determined evidence guidelines. Confirmation that the evidence meets vehicle work instructions. Acceptable sample evidence will be signed- off by the RAW inspector. Other types of evidence will not be signed-off.

The RAW Inspection (cont) –Report Report will be explained and a copy provided to the RAW/applicant at the end of the inspection. Any issues to be resolved will be raised as “Discussion Items” (DI’s). DI’s will be loaded on to the RAWS website when the inspector returns to the office. The mechanism to resolve DI’s is to be agreed between the RAW/applicant and the inspector.

VIR Form NOTE!! RAWS inspectors use the VIR form to inspect the vehicle. It is a good basis for developing your CVR (from the RAWS website).

After the RAW Inspection When - if no DI’s, an approval would be expected in one to two weeks. If there are DI’s, the service charter of 20 working days applies. Who - the inspectors in the first instance - but work may be transferred to other officers.

After the RAW Inspection (cont) What - The inspectors will advise what evidence needs to be sent in to finalise DI’s. Where serious problems occur, the Administrator may give further advice in the form of a letter. A re-inspection of the vehicle or a re-sit of the tests may be needed.

After the RAW Inspection (cont) NOTE!! Do not submit a new VIC electronically in to the RAW system until the inspector advises you to. ed/faxed copies can be sent beforehand to finalise any DI’s.

For the Future One day inspections –From early April Reschedules –Evidence matched to the vehicle - remaining to be examined in the office. –Automatic reports.

For the Future (cont) RAWS SE forms for all evidence. Changes to the determined evidence guidelines. Clarification of the requirements FAQs, Guide.

Things to consider Summary of NOTES!! in the slides –Remember to also check for past repairs (RAW approval condition on plating). –When filling out the CIN, see Regulation 58, following the instructions in Schedule 1. –Each Vehicle Evidence (EVE) is usually done as part of the Completed Vehicle Report (CVR) checks.

Things to consider (cont2) Summary of NOTES!! in the slides –SVE does not have to come from testing of your sample vehicle only. –Listing evidence with a unique VIC reference for each new revision is the easiest way to control the documents and to show compliance at audit.

Things to consider (cont3) Summary of NOTES!! in the slides –For SVE, markings or part numbers should be recorded. Where not marked, sufficiently detailed photographs should be taken (this particularly helps when evidence has been purchased) –The VIC template mistakenly calls the EVE “Specific” evidence in its heading.

Things to consider (cont4) Summary of NOTES!! in the slides –The RAW/applicant should not feel obliged to provide lunch to the inspectors. However, a shared working lunch is acceptable practice. –RAWS inspectors use the VIR form (from the RAWS website) to inspect the vehicle. It is a good basis for developing your CVR.

Things to consider (cont5) Summary of NOTES!! in the slides –Do not submit a new VIC electronically in to the RAW system until the inspector advises you to. ed/faxed copies can be sent beforehand to finalise any DI’s. –Copy the vehicle variant identification information from the Specialist and Enthusiast Vehicle Scheme (SEVS) ruling. Use “drop down boxes” and put all entries in capital letters.

Things to consider (cont6) Other items to watch out for: –When putting together SVE or EVE, directly reference and address the notes in the determined evidence guidelines. By removing extra information or vague statements the evidence will be shorter, more efficient and easier to examine.

Things to consider (cont7) Other items to watch out for: –SVE and EVE should reflect just the vehicle being inspected. Other than for tyre related ADRs (18/.., 20/…,23/…,24/…), keep multiple variants out.

Things to consider (cont8) Other items to watch out for: –SVE and EVE should record actual values where they must be measured to show compliance. Simple statements of compliance are not enough (ie use written in values, not just yes/no ticks).

Things to consider (cont9) Other items to watch out for: –Test results must pass when the uncertainty of measurement is taken in to account. Eg if the limit is 20 and the test result is 19 plus or minus 2, the result is a fail. The result could be between 17 and 21.

Things to consider (cont10) Other items to watch out for: –Submit Summary of Evidence (SE) forms for any full volume evidence (available on the RVCS website).

Things to consider (cont11) Other items to watch out for: –When using full volume evidence there should be separate evidence addressing all the ADR requirements. A filled out SE form is a summary of the evidence held and so is not full volume evidence in its own right. –all SVE tests must be done in accordance with the ADRs and the Test Facility Inspection (TFI) Manual.

Things to consider (cont12) Other items to watch out for: – All evidence documents should be traceable from The VIC to the sample vehicle, and then to each vehicle. –Write to the Administrator with any requests for deviation/concession or interpretation from the evidence guidelines.