Flight Testing Advanced Unmanned Aircraft Michael McDaniel - AIR 5.1.6.3 Naval Air Systems Command NAS Patuxent River, MD, USA DISTRIBUTION STATEMENT A:

Slides:



Advertisements
Similar presentations
Emergency COA Process Presented to: UAS All Users TELCON
Advertisements

Integration of HALE UAS into non-segregated airspace
The European Organisation for the Safety of Air Navigation UAS Security Antonio Nogueras Head DSS/CM/ATM Security Unit EU UAS Panel Workshop, th.
Mission Aircrew Course Chapter 14: Crew Resources Management (Feb 2005)
Boeing’s Perspective on FCF Risk Mitigation
Casa RPAS regulatory Development
The pilot and airline operator’s perspective on runway incursion hazards and mitigation options Session 3 Presentation 1.
Incident Review Meeting Guidance Material & Presentation Template
The Importance of Synergy Between Flight Deck and Cabin Crews
AIR ASSAULT SLING LOAD OPERATIONS
Authored by M. Moyer 01-Mar-2011 Modified by Lt Colonel Fred Blundell TX-129 Fort Worth Senior Squadron For Local Training Rev Jan-2014.
Runway Incursion’s Affect on FAA Approved Pilot Training and Pilot and Flight Instructor Certification and Part 121 Pilot Checking – Andy Edwards – Manager.
P-2028 Minnesota Wing Aircrew Training: Tasks P-2028 Crew Resource Management.
Federal Aviation Administration Commercial Space Transportation Human Space Flight Occupant Safety Telecon Telecon 7 – Medical Guidance for Crew & Spaceflight.
6th Framework Programme Thematic Priority Aeronautics and Space.
Soft Field Takeoff and Landing. Soft Field Takeoff w Before landing, will you be able to take off? w Complex and high performance aircraft often have.
AIRCRAFT HANDLING Part 4 Flight Preparation.
Airbus flight control system  The organisation of the Airbus A330/340 flight control system 1Airbus FCS Overview.
FAA ICAO ANNEX 6 PROPOSAL & OVERSIGHT ISSUES IN DISPATCH
Airbus flight control system
Operational Contingency and Resiliency Steve McMahon Manager | Safety Performance and Analysis Group.
I) Bob Ettinger Flight Test Manager Northrop Grumman Aerospace Systems El Segundo, CA An Approach to Flight Readiness and Executive Readiness Reviews The.
Presented to: By: Date: Federal Aviation Administration FAAST Runway Safety Training Proper Planning Promotes Safer Ground Operations.
May 2010Approval of Experimental Aircraft for Instrument Flight APPROVAL OF EXPERIMENTAL AIRCRAFT FOR INSTRUMENT FLIGHT Richard L (Dick) Newman (M) and.
Mission Aircrew School Chapter 14: Crew Resources Management (March 2011)
OPERATIONAL SUPPORT AIRLIFT AGENCY DEPARTURE & CONTINGENCY PROCEDURES CW3 MICHAEL R. JEWETT OSAA FLIGHT STANDARDS CW3 MICHAEL R. JEWETT OSAA FLIGHT STANDARDS.
Crew Resource Management LT Andre Towner U.S. Coast Guard.
Mission Pilot Skill Set
IGCSE ICT Computer Simulation.
Federal Aviation Administration Unmanned Aircraft Systems in the National Airspace System Coming soon to airspace near you…..UAS-101 Presented At: Pecora.
Federal Aviation Administration Runway Safety Action Team 2014 Gary A. Palm ATM Teterboro ATCT.
Human Factors of Remotely Piloted Aircraft Alan Hobbs San Jose State University/NASA Ames Research Center.
(MEP) Safety Forum in Riga Essential Elements: Thorough flight preparation, including: Training lesson / examination session planning (Flight Plan, sequence.
Slide 1Lesson 14: Fundamentals of the CAP Flying Safety Program Fundamentals of the CAP Flying Safety Program.
Massachusetts Institute of Technology 4 April 2003
AvSport of Lock Haven What’s the Spin on Stalls? Presentation Copyright © 2015 Mastering the most dreaded maneuver in flight training Prof. H. Paul Shuch,
6-1 Design of UAV Systems UAV operating environmentsc 2002 LM Corporation Lesson objective - to discuss UAV Operating Environments including … National.
Federal Aviation Administration 0 Certification Standards for New Technologies June 9, 2005 Certification Standards for New Technologies Presentation to:
7-1 Design of UAV Systems Sorties ratesc 2002 LM Corporation Lesson objective - to discuss Sortie rate analysis including … - Mission planning and preparation.
UAS and NAS A glance at FAA guidelines and challenges PEAK 3 1.
Functional Check Flight Symposium Andre Tousignant C.I.M. Director Air Safety Investigation Office (ASIO) Bombardier Aerospace Vancouver Feb 8, 2011.
AVAT11001: Course Outline 1.Aircraft and Terminology 2.Radio Communications 3.Structure, Propulsion, Fuel Systems 4.Electrical, Hydraulic Systems and Instruments.
Lecture 2: AIRSIDE PART 2 By: Zuliana Ismail.
Presented to: By: Date: Federal Aviation Administration Noise 101: Federal Noise Laws and Regulations Town of Payson M.L. Chittick, Scottsdale FSDO January.
LECTURE 4: ICAO CHART requirements
Lecture 4 – XP and Agile 17/9/15. Plan-driven and agile development Plan-driven development A plan-driven approach to software engineering is based around.
ChocoPlane Project Software Engineering II Exercise I.
Air Traffic Control. There are different types of air traffic controllers who communicate with pilots from the time the pilot calls for a clearance to.
Human Factors An Overview
Human Factors. Six key areas proposed Fatigue, Automation Insertion of new technologies, Physical environment, Pilot decision making, Procedural non-compliance,
1 MITRE © 2015 The MITRE Corporation All rights reserved. Approved for Public Release: Case Distribution Unlimited. For Internal MITRE Use Trustworthy.
ACCIDENT INVESTIGATION HUMAN FACTORS. WHAT HAVE WE LEARNED TO PREVENT FUTURE ACCIDENTS A. TRAINING B. TESTING.
Office of Aviation Safety Flight Crew Performance.
1 DFRC SUAS Program Operations and Risk Management Approach for Small UAS Presented to the Certification Working Group 6/26/2008 Brad Flick/DFRC Chief.
Zuliana-July Lecture 1: INTRODUCTION AIRCRAFT MASS (WEIGHT) & PERFORMANCE By: Zuliana Ismail, 2010.
High Fidelity Simulation as a Route to Certification Autonomous Systems: Legal / Regulatory Aspects and V&V Workshop 22 nd February 2016 Dr. M. Jump.
Topics for Remote Pilot Certification Exam Alexus Garcia Unmanned Aircraft System Safety Center of Excellence University of California.
Cessna Aircraft Differences Training.
Friends and Partners of Aviation Weather
Drones, RPAS, UAV’s, UAS Unmanned aircraft.
Auto Tow Conversion Course
Safety Instrumented Systems
Minneapolis - Denver - Washington, D.C.
Safety Instrumented Systems
The pilot and airline operator’s perspective on runway incursion hazards and mitigation options Session 2 Presentation 2.
Oceanic and International Operations
I4102 TIMEHACK IMSAFE / ORM DOR / TTO POLICY JUNK JACKET REVIEW READ FILE / QUALIFICATIONS.
The pilot and airline operator’s perspective on runway incursion hazards and mitigation options Session 3 Presentation 1.
The pilot and airline operator’s perspective on runway incursion hazards and mitigation options Session 2 Presentation 2.
Knowing When to Stop: An Examination of Methods to Minimize the False Negative Risk of Automated Abort Triggers RAM XI Training Summit October 2018 Patrick.
Presentation transcript:

Flight Testing Advanced Unmanned Aircraft Michael McDaniel - AIR Naval Air Systems Command NAS Patuxent River, MD, USA DISTRIBUTION STATEMENT A: Approved for public release; Distribution is unlimited. 20 October 2009,

Advanced Unmanned Aircraft High level of automation –e.g. Global Hawk These aircraft are not simply remotely operated manned aircraft –Unconventional controls No direct control of flight control surfaces Command output, not method –Many tasks automated Takeoff, landing, emergency procedures Testing carries significant challenges –Especially early flights DISTRIBUTION STATEMENT A: Approved for public release; Distribution is unlimited. 20 October 2009,

Major Test Challenges Loss of communications Loss of control Subsystem failures in flight Range safety Crew resource manangement Risk management for early flights *All screens are simulated DISTRIBUTION STATEMENT A: Approved for public release; Distribution is unlimited. 20 October 2009,

Loss of Communications – Challenge Loss of command & control link between aircraft and ground station Management of concerns –Program leadership –Range safety –Airspace controlling authority DISTRIBUTION STATEMENT A: Approved for public release; Distribution is unlimited. 20 October 2009,

Loss of Communications – Response Use redundant links –Example: Standard Global Hawk procedure is to use 2+ links If lost-communications procedures are tested in flight, have a method to recover comms –May want special software to tell airplane to ignore a working link for test Design to operate without link –Example: Global Hawk has lost-communication actions in mission plan Understand response of system –Loss of communications does not mean out-of-control Brief all participants beforehand –Including program managers, range personnel, airspace authorities Prevent panic responses DISTRIBUTION STATEMENT A: Approved for public release; Distribution is unlimited. 20 October 2009,

Loss of Control - Challenge Software failure Airplane loses navigation solution –Leaves test range Can be serious risk DISTRIBUTION STATEMENT A: Approved for public release; Distribution is unlimited. 20 October 2009,

Loss of Control - Response Build a good Systems Integration Laboratory (SIL) –Must use flight hardware –Exercises all functions in simulated flight environment –High demand item Need to have at least 1 year in advance May want multiple SILs Test all software functions and possible failures in SIL Test on ground –Taxi tests Do not fly until you are certain software is thoroughly tested –Example: Global Hawk program has 30,000+ flight hours, has never lost an aircraft due to flawed software May need range safety destruct system for early flights DISTRIBUTION STATEMENT A: Approved for public release; Distribution is unlimited. 20 October 2009,

Range Safety - Challenge Reduce risk to acceptable level –Overflight of populated areas –Airspace –Flight termination systems Minimize impact on other test activities Many range safety personnel unfamiliar with unmanned aircraft DISTRIBUTION STATEMENT A: Approved for public release; Distribution is unlimited. 20 October 2009,

Range Safety - Response Early engagement –Identify no-fly areas –Explain system operation in detail Practice ground handling –Tying up runways is a major issue –GHMD operations clear runway quickly Smart planning –Avoid no-fly areas –Stay in test airspace May need to limit winds aloft DISTRIBUTION STATEMENT A: Approved for public release; Distribution is unlimited. 20 October 2009,

Range Safety - Response GHMD Mission Plan segment for NAS Patuxent River Winds aloft limits for FL500 DISTRIBUTION STATEMENT A: Approved for public release; Distribution is unlimited. 20 October 2009,

Range Safety - Response Flight termination system (destruct system) –Balance risks FTS adds one risk to reduce risk from out-of-control flight When guidance & control is proven, FTS is greater risk Remove FTS at that point DISTRIBUTION STATEMENT A: Approved for public release; Distribution is unlimited. 20 October 2009,

Crew Resource Management - Challenge Manage flight crew and test team communications –Get critical information quickly Test team has more information than pilot –Keep lines of communication clear Inform pilot Don’t overwhelm pilot DISTRIBUTION STATEMENT A: Approved for public release; Distribution is unlimited. 20 October 2009,

Crew Resource Management - Response Crew = Pilot + other flight crew + test team If test team is > 5-7 people, have a hierarchy –Guidance & Control, Structures, ECS, etc. –Multiple engineers for each discipline –One engineer speaks for that discipline One person talks to the pilot & chase aircraft –Anyone can break in if aircraft is threatened Manage terminology –Have one term for aircraft destruction, use only for that purpose Train before flight –Formal CRM training –Simulated flights if possible –Example: Prior to 1 st flight, the ACTD Global Hawk test team did ~5 simulated flights with simulated emergencies DISTRIBUTION STATEMENT A: Approved for public release; Distribution is unlimited. 20 October 2009,

Risk Management for Early Flights - Challenge Risk management –Technical –Programmatic Exploration of control envelope Chase aircraft DISTRIBUTION STATEMENT A: Approved for public release; Distribution is unlimited. 20 October 2009,

Risk Management for Early Flights - Response Gradual test program –Manage risk Risk tolerance in early tests < risk tolerance later in program –Expand command envelope in manner similar to flight envelope Example: Early ACTD Global Hawk test program –1 st flight: Fully preprogrammed –2 nd flight: On-track override commands –3 rd flight: Off-track override commands Test in the SIL, then test in taxi, then test in flight Test team must control test program –Program pressure to fly before safe must be resisted DISTRIBUTION STATEMENT A: Approved for public release; Distribution is unlimited. 20 October 2009,

Risk Management for Early Flights - Response Define RTB criteria beforehand –Lay out abort criteria –Write them down –Use if needed Know the limits of the aircraft –Can affect RTB Example: ACTD Global Hawk first flight –Unable to get gear locked up –Test team knew gear speed limit >Vne for airframe –Pressed with mission successfully Chase aircraft –Brief mission plan and contingencies –May need multiple chase aircraft for different portions of flight Example: Early ACTD Global Hawk test program F-16 for climb (ROC~5,000 ft/min) T-39 for landing (approach speed ~120 KCAS) DISTRIBUTION STATEMENT A: Approved for public release; Distribution is unlimited. 20 October 2009,

Conclusion Unmanned aircraft will make up a large part of future flight testing High levels of automatic operation pose special challenges Challenges can be met with flexible planning and good test discipline DISTRIBUTION STATEMENT A: Approved for public release; Distribution is unlimited. 20 October 2009,

Questions? DISTRIBUTION STATEMENT A: Approved for public release; Distribution is unlimited. 20 October 2009,