2006 TEA Conference Terry Berends, PE Assistant State Design Engineer Washington State Department of Transportation Risk Based Estimating Tools at WSDOT.

Slides:



Advertisements
Similar presentations
Advance Project Management - CPH
Advertisements

PROJECT RISK MANAGEMENT
Guidebook for Risk Analysis Tools and Management Practices to Control Transportation Project Costs Keith R. Molenaar, PhD Stuart D. Anderson, PhD, PE Transportation.
Chapter 14 Schedule Risk Management Dr. Ayham Jaaron Second Semester 2010/2011.
Systems Analysis and Design 9th Edition
Simplified Risk Management Planning for A Risk Management Process Overview presentation, which should take about.
Project Management Gaafar 2007 / 1 This Presentation is uses information from PMBOK Guide 2000 Project Management Risk Management* Dr. Lotfi Gaafar.
Risk Based Estimating Self Modeling Ovidiu Cretu, Ph.D., P.E. Terry Berends, P.E. David Smelser.
Project Cost Management Estimation Budget Cost Control
CEVP ® Cost Estimate Validation Process TEA Conference 2004 Jay Drye, P.E. Assistant State Design Engineer Monica Bielenberg, P.E. CREM Program Manager.
Projmgmt-1/33 DePaul University Project Management I - Risk Management Instructor: David A. Lash.
Project Risk Management
Project Management Process Project Description Team Mission/ Assignment Major Milestones Boundaries Team Identification Measures of Success Roles & Responsibilities.
Project Based Risk Management Defusing a potential ticking time bomb
Managing Project Risk.
Managing Risk to Reduce Construction Claims (And Improve Project Success) Presented by Laurie Dennis, PE, CVS-Life, FSAVE.
NCHRP 8-60 Risk Analysis Tools and Management Practices to Control Transportation Project Costs Keith R. Molenaar, PhD Stuart D. Anderson, PhD, PE Transportation.
Managing Projects
Part II Project Planning © 2012 John Wiley & Sons Inc.
Project Management Lecture 5+6 MS Saba Sahar.
 A project is “a unique endeavor to produce a set of deliverables within clearly specified time, cost and quality constraints”
What If I Must Go Beyond a Preliminary Assessment? (the example of a USAID EA under Reg. 216) [DATE][SPEAKERS NAMES]
Module 8: Risk Management, Monitoring and Project Control We would like to acknowledge the support of the Project Management Institute and the International.
PRM 702 Project Risk Management Lecture #28
Version 1.0– June 18, Leveraging the Texas Project Delivery Framework and.
PMI Knowledge Areas Risk Management.
Project Risk Management. The Importance of Project Risk Management Project risk management is the art and science of identifying, analyzing, and responding.
Project Risk Management Supplement. The Importance of Project Risk Management  Project risk management is the art and science of identifying, assigning,
Project Risk and Cost Management. IS the future certain? The future is uncertain, but it is certain that there are two questions will be asked about our.
Risk management in Software Engineering T erm Paper By By Praveenkumar Sammita Praveenkumar Sammita CSC532 CSC532.
Copyright © 2014 McGraw-Hill Higher Education. All rights reserved. CHAPTER 15 Project Management McGraw-Hill/Irwin.
Chapter 10 Contemporary Project Management Kloppenborg
HIT241 - RISK MANAGEMENT Introduction
Managing Risk. Objectives  To Describe Risk Management concepts and techniques  To calculate and analyze a project using Probability of completion 
© 2015 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
Risk Management Project Management Digital Media Department Unit Credit Value : 4 Essential Learning time : 120 hours.
Project Management By: Dr Madhu Fernando Project Risk Management
Chapter 11: Project Risk Management
IT Project Management, Third Edition Chapter 11 1 Chapter 6: Project Risk Management.
1 TenStep Project Management Process ™ PM00.7 PM00.7 Project Management Preparation for Success * Manage Risk *
Chapter 7 Managing risk and quality. Learning objectives discuss the importance of risk in a project and how it can be managed explain the processes of.
Monitor & Control Risks 1 MEC-4. What is Monitoring & Controlling Risks? 2 » Monitoring & Controlling Risks is the process of: implementing Risk Response.
Ch 10 - Risk Management Learning Objectives You should be able to: List and describe risk management processes, inputs, outputs, and tools List and describe.
Develop Project Charter
PMP Study Guide Chapter 6: Risk Planning. Chapter 6 Risk Planning Planning for Risks Plan Risk Management Identifying Potential Risk Analyzing Risks Using.
BSBPMG504A Manage Project Costs 7.1 Estimate Costs Adapted from PMBOK 4 th Edition InitiationPlanning ExecutionClose Monitor Control The process of developing.
SOFTWARE PROJECT MANAGEMENT
Project Risk Management Planning Stage
Introduction to Project Management Chapter 9 Managing Project Risk
Monitor & Control Risks 1 MEC-4. What is Monitoring & Controlling Risks? 2 » Monitoring & Controlling Risks is the process of: implementing Risk Response.
1 Project Management C53PM Session 4 Russell Taylor Staff Work-base – 1 st Floor
Report Performance Monitor & Control Risk Administer Procurement MONITORING & CONTROLLING PROCESS.
~ pertemuan 4 ~ Oleh: Ir. Abdul Hayat, MTI 20-Mar-2009 [Abdul Hayat, [4]Project Integration Management, Semester Genap 2008/2009] 1 PROJECT INTEGRATION.
Info-Tech Research Group1 Manage the IT Portfolio World Class Operations - Impact Workshop.
Overview PRINCE Hogeschool Rotterdam. 2 Project definition  A project is a temporary organization that is created for the purpose of delivering.
Info-Tech Research Group1 Manage IT Budgets & Cost World Class Operations - Impact Workshop.
Company LOGO. Company LOGO PE, PMP, PgMP, PME, MCT, PRINCE2 Practitioner.
Copyright 2012 John Wiley & Sons, Inc. Part II Project Planning.
P3 Business Analysis. 2 Section F: Project Management F1.The nature of projects F2. Building the Business Case F4. Planning,monitoring and controlling.
ON “SOFTWARE ENGINEERING” SUBJECT TOPIC “RISK ANALYSIS AND MANAGEMENT” MASTER OF COMPUTER APPLICATION (5th Semester) Presented by: ANOOP GANGWAR SRMSCET,
Managing Project Risk – A simplified approach Presented by : Damian Leonard.
Project Management PTM721S
Monitoring and Evaluation Systems for NARS organizations in Papua New Guinea Day 4. Session 12. Risk Management.
Project Based Risk Management Defusing a potential ticking time bomb
12.2 Conduct Procurements The process of obtaining seller responses, selecting a seller and awarding the contract The team applies selection criteria.
CHAPTER11 Project Risk Management
Recognization and management of RISK in educational projects
ITPD ISSUE MANAGEMENT PROCESS SEPTEMBER 5, 2008
Part II Project Planning © 2012 John Wiley & Sons Inc.
Project Management Process Groups
Presentation transcript:

2006 TEA Conference Terry Berends, PE Assistant State Design Engineer Washington State Department of Transportation Risk Based Estimating Tools at WSDOT Self-Modeling Spreadsheet, CRA, CEVP ®

Presentation Outline Introduction WSDOT’s Program Background on Risk Based Estimating at WSDOT Cost Estimate Validation Process (CEVP®) Cost Risk Assessment (CRA) Self-Modeling Risk Management Spreadsheet –Demo –One Page Summary Sheet –Uses –Outcomes –Future direction

WSDOT Sectary Doug MacDonald’s Edict “What gets measured… gets managed.” The MacDonald Mantra “Project Delivery and Accountability” (“On time… on budget!”)

The Questions  How much will it cost?  How long will it take? The Follow-up Questions  Why does it cost that much?  Why does it take that long?

The Answer An Estimate is not a number  Projects are subject to many variables that cannot all be known beforehand.  Cost and schedule estimates represent one possible outcome of multiple variables.  These variables are not all directly controllable or absolutely quantifiable.  Therefore cost and schedule estimating and the validation process must consider probabilities in assessing estimates and schedules, using a recognized, logical and tested process.

Estimate …to judge tentatively or approximately: to determine roughly the size, extent… to produce a statement of the approximate cost. Implies a judgment, considered or casual, that precedes or takes the place of actual measuring… Assess …implies a critical appraisal for the purpose of understanding or interpreting, or as a guide in taking action. The Answer continued… … and an Estimate is still just an Estimate.

Managing the program at the project level 2003 Legislature passed a nickel a gallon gas tax to fund 130 line item projects 2005 Legislature passed an additional nine and one half cents a gallon gas tax to fund an additional 274 line item projects With the programmatic approach, risk events that affect cost and schedule would often balance across the portfolio of projects within the contingencies of the entire program. With line item project delivery we no longer have the flexibility to transfer dollars between projects to cover over or under runs

2002 Developed the CEVP Process 2003 CEVP’s performed on first 12 mega projects 2003 Cost Risk Assessment (CRA) workshops on smaller projects 2005 Project Management Executive Order & On-Line Guide developed 2006 Self-Modeling Risk Management Plan Spreadsheet developed 2007 Develop Performance Measurements

Risk Based Estimating Tools at WSDOT What is CEVP®?  CEVP® is an intense workshop in which a team of top engineers and risk managers from local and national private firms and public agencies examine a transportation project and review project details with WSDOT engineers. The CEVP® workshop team uses systematic project review and risk assessment methods to identify and describe cost and schedule risks. What is CRA ?  Cost Risk Assessment (CRA) is a term that describes a workshop process similar but less intense than the Cost Estimate Validation Process (CEVP®). What is Self-Modeling Risk Management Spreadsheet?  This spreadsheet is a simplified self-modeling spreadsheet that project design teams can enter risk into and determine what the quantitative impacts are to the projects estimate. This spreadsheet can be implemented early on during the scoping stage of a project when the initial budget is generally set for projects. This can be used for all projects but especially on projects that do not meet the threshold for a formal CRA/ CEVP®

WSDOT Policies  CEVP® - required on all projects in excess of $100 million.  CRA – required on all projects in excess of $25 million, but less than $100 million.  Value Engineering – all projects in excess of $10 million  Project Management – A project management plan including a risk assessment plan is required on all projects regardless of size  Estimate updates are required quarterly to ensure that project budgets stay current due to the volatile market conditions.

101 Workshops Completed (2002 – present) 45 CEVP ® 53CRA 3 Combined VE/CRA (Self- Modeling Spreadsheet)

Why the need for a self modeling spreadsheet?

Self Modeling Risk Management Plan Spreadsheet

One page summaries provide a great tool for communication  Project Description  Project benefits  Progress  Cost Range  Project risks  Schedule Range  Key Financial assumptions

 Improved communication with the public.  Validates the estimate.  Risk register useful for project planning and management  Improved team communication.  Project Managers take action pro-actively to avoid, transfer or mitigate risk.  Risks that are accepted are known.  Potential response strategies, especially pro-active measures, are identified early.  Risks register can be used during Value Engineering Studies. Results of informal Cost Risk Assessments Project Engineers/Managers have indicated…

Project RISK Management PLANNING  Risk Identification  Qualitative Risk Analysis  Quantitative Risk Analysis  Risk Response Strategy  Risk Monitoring & Control Cost Risk Analysis Self-Modeling Spreadsheet, CRA & CEVP ®  Risk Response Strategy  Risk Monitoring & Control

How to use this valuable information in a VE study?  Investigation Review the risk register, contingencies and bid items that are set up to mitigate risk  Functional analysis include the secondary function of “reduce risk”  Speculation Brainstorm ideas on how to reduce risk  Evaluation Include a risk assessment as part of the evaluation criteria  Development Develop recommendations that reduce risk Include a risk assessment for VE recommendations that modify the original design

Comparison of the VE and Cost Risk Assessment Processes  Investigate  Functional analysis  Speculate  Evaluate  Develop  Learn about project  Identify Risks  Strategize how to handle  Qualify and Quantify  Develop response plans and triggers Value Engineering Cost Risk Assessment Both use a team approach

Next Steps  Develop Risk Database(s)  Track common risk  Track response Strategies  Assist with performance measurements  Develop consistency when identifying common risks  Improve monitoring and quantification of results  More fully develop performance measurements  Document risk response strategies

Questions? The Self-Modeling spreadsheet and the one page summary template along with other information about WSDOT’s Risk based estimating tools can be found at the following website: