1 RESS Status of Korea 2011. 1. 자동차성능연구소 Ress-3-6.

Slides:



Advertisements
Similar presentations
1 Washington, Oct. 2nd 2013 Informal working group: Large Lithium batteries testing RECHARGE & SAFT.
Advertisements

Regulations for HEVs and EVs on the Electric Safety MLIT, Japan.
An illustration of EVS-GTR Battery System Test Project and Test Methods’ Adaption to Commercial Vehicles Peter Wu, BYD.
Safety design parameters for Li-ion propulsion batteries and interaction with vehicle manufacturers to achieve EV safety Electric Vehicle Safety Technical.
NHTSA Office of Applied Vehicle Safety Research Crashworthiness Division Li-ion Based Rechargeable Energy Storage System (RESS) Safety Research Programs.
Proposal of Fire Resistance Test
TF8: Research IF EVS-GTR Battery System Test Project and Test Methods’ Adaption to heavy /commercial Vehicles.
Shanghai Research Institute of Chemical Industry
Charge Controllers Charge Controller Features Charge Controller Types
Thirty Eight APEC Transportation Working Group Meeting, Bali, Indonesia 1 – 5 July 2013 Thirty Eight APEC Transportation Working Group Meeting, Bali, Indonesia.
Chapter 7 Charge Controllers
Status of Korean EVs Regulations
EVS-GTR TF5 Update Progress TF5 task force – thermal propagation 2015/6/4.
1 Modular DC/DC Converter. 2 PSC W Standard 19“ rack 4U – 6 prewired slots (single DC input/output connection for each unit)
National Highway Traffic Safety Administration Electrical Safety William Joel Sánchez.
Chen Chunmei MIIT, the People’s Republic of China Oct. 23, MIIT1 Status of EV Safety Standards in China.
National Highway Traffic Safety Administration U.S. Proposal on BMS Functionality-In Use Brian T. Park Safety Engineer.
Lesson 9: Electrical Components
Development of a Technique for HFCV Safey Assessment
PRBA – The Rechargeable Battery Association
Holt: Physics Ch. 20 – 1 Pages
Charging Dock & Power Control Sustainable Energy Systems for Education P The Portable High-Power Density Energy System project (P11401), which preceded.
FRANCE1 Informal adhoc ELSA Working Group Geneva, December 9th, 2009 Proposal from France based on - Informal document GRSP n° ECE/TRANS/WP.29/GRSP/2009/16.
Electrical Resistance and Ohm’s Law Electric circuits are used to convert electrical energy into some other form of energy we need.
Electrical Systems.
4.2.3B Electrical Power What About Watts?. Power Law Moving electrons (current) requires ENERGY How much energy gets used depends on: Strength of push.
Volker Rothe, OICA October 23, 2012 Draft Global Technical Regulation Electric Vehicle Safety Outline of the OICA proposal.
Short circuiting a battery demo… Dangerous ? High current?
1 Consideration for Safety Standard of RESS 2 November 2010 Transmitted by Japan Automobile Standards Internationalization Center (JASIC)
for Thermal Propagation
TF8 : Applicability for Commercial Vehicles EVS 7 th conference March 18 th , France.
1 Washington, Sept 29th, 2014 Informal working group: Large Lithium batteries testing RECHARGE & SAFT.
Update on the EV standards in China
TF8 work report for 9 th EVS-GTR conference Changchun.
EVPC1 Informal adhoc EVPC Working Group Geneva, may 18 th, 2010 Proposal from FRANCE based on EVPC informal group work Informal document No. GRSP
1st Meeting of informal group “Electric Safety” Amendment of ECE R100 regarding electric safety of electric, hybrid and hydrogen/fuel cell vehicles SGS/ES.
Task Force 3: Electrolyte leakage Last update- 01/06/
IMMA contribution 9/RESS meeting, Tue 21 May Thu 23 May 2013 CCFA, 2, rue de Presbourg PARIS 1 RESS-9-10.
Progress report about RESS activities Gerd Kellermann, Germany Informal document GRSP (50th GRSP, 6–9 December 2011, agenda item 15)
1 Warning requirement for the management system of the REESS May, 2014 U.S. DOT Head Quarter 1200 New Jersey Avenue, SE Washington, DG JASIC.
Task Force 3: Electrolyte leakage Last update- 19/03/
1 TF8 : Applicability for Commercial Vehicles EVS 8th Meeting June 4th , Washington DC.
Rechargeable Energy Storage systems (REESS) requirements Gerd Kellermann, Germany Informal document GRSP (51 st GRSP, May 2012,
Energy and Work Content area presentation for Physics.
Battery Models. EMF and voltage What is EMF? – Electro Motive Force What is the difference between EMF and battery voltage? – The battery has internal.
Battery Models. EMF and voltage What is EMF? – Electro Motive Force What is the difference between EMF and battery voltage? – The battery has internal.
Development of CAD concept model of package transformer substation (PTS) Aleksandra Seledkova Perm National Research Polytechnic University.
Introduction to Power Save LED Module March 2015.
Chapter 3 PHYSICAL INJURY AND CONTROLS 3.2 Electrical Safety
Task Force 8: Heavy Duty Vehicles
TC22 SC37 WG3 Liaison Report for EVS-GTR Thermal Propagation Work Item
Electric Vehicles Safety Global Technical Regulation Phase 1
Batteries as Integral Part of Equipment
Task Force 3: Electrolyte leakage
Task Force 3: Electrolyte leakage
Electrical Systems Series Circuits Parallel Circuits Electrical Power.
Electric Vehicles Safety Global Technical Regulation
Pack Level (End Item Assembly) Testing
Motorola Solutions Internal Information
Informal adhoc ELSA Working Group
7-2: Electric Current.
Electric Circuits Chapter 22 Section 3.
Battery 101.
Practical electricity
AGENDA INTRODUCTION CELLS AND COMPONENTS PV PERFORMANCE
New UN Regulation on electric vehicles of category L
AGENDA INTRODUCTION CELLS AND COMPONENTS PV PERFORMANCE
Ch Electricity II. Electric Current (p ) Circuit
SAE battery safety standards committee UPDATE January 23, 2019
Chapter Twenty One: Electrical Systems
Presentation transcript:

1 RESS Status of Korea 자동차성능연구소 Ress-3-6

Table of Contents Test Scene 3 3 2/28 Test Facilities 2 2 Korean Regulations 1 1

 Promulgation : ArticleDescription Article 2 Definition “Traction Battery” means the storage of electrical energy to propel a vehicle. Article 18-3 Traction Battery (RESS) General Structural Requirements 1. A traction battery shall be separated from the occupant compartment by the wall or protecting plate 2. A traction battery shall have functions to protect overcharging and to cut over-current against the designed limits 3. A traction battery shall not be exploded or ignited under physical, chemical, electrical shock and heat prescribed by the Minister 1. Korean Safety Regulations of RESS Status 3/28

Technical Requirements TestsProceduresSpecimen Heat Exposure Exposed to 80 ℃ heat for 4 hour package or system Mechanical Shock (Drop) Drop from 4.9 m high package or system Fire Resistance Exposed to flame of 890 to 900 ℃ for 2 min package or system External Short circuit Closed circuit with total resistance of 50 mΩ or less for 1 hour System OverchargeCharge up to 150% SOCSystem Over-dischargeDischarge with 1C rateSystem ImmersionImmerse completely in the sea water package or system 1. Korean Safety Regulations of RESS 4/28

TestGTR (RESS)ISO Korean VibrationO O (Reliability) Thermal shockO O (Reliability) Humidity / Moisture ExposureO Mechanical ShockO O (Reliability) O (4.9m drop) Fire ResistanceOO External Short circuitOO (Abuse test)O OverchargeOO (Abuse test)O Over-dischargeOO (Abuse test)O Over-temperatureO Protection against direct contact O EmissionO ImmersionOO DustO Dewing O (Reliability) MarkingO 3. Comparison Table 5/28 Technical Requirements

2. Test Facilities 6/28 Explosion-proof Chamber Overcharge Over-discharge Heat Exposure External Short circuit

7/28 2. Test Facilities Fire Resistance Immersion

8/28 2. Test Facilities Mechanical Shock (Drop)

 Specifications  Over-Charge & Over-Discharge System ㆍ Voltage/Current : 1,000 VDC / 50 ADC, 1 ch ㆍ Voltage Output : -100 V ∼ 1,000 V  Charge & Discharge System ㆍ Voltage/Current : 450 VDC / 200 ADC, 2 ch ㆍ Power : 90 kW ㆍ Voltage Output : 10 V ∼ 450 V ㆍ Current Output : 2ch, max 200 A /ch  Chamber ㆍ 1,800mm(W), 1,500mm(D), 1,000(H) 9/28 2. Test Facilities

10/28 3. Test Scene Fire Resistance

11/28 3. Test Scene Mechanical Shock (Drop)

12/28 3. Test Scene Immersion

13/28 3. Test Scene Over-discharge

Thank you!