DSM ESCO FUNDING STANDARD OFFER PACKAGE STANDARD PRODUCT PACKAGE Presented by : Clive Nicosia Designation : Energy Service Manager Eastern Region Date.

Slides:



Advertisements
Similar presentations
Grenada Sustainable Energy Plan Stakeholders Meeting April 5, 2002.
Advertisements

Energy Performance Contracting November 3, 2009 Performance Contracting December 11, 2009.
Commercial Arrangements For Gas Quality Service – Process UNC Transmission Workstream 23 rd April 2007.
NJ SmartStart Buildings New Jersey Higher Education Partnership for Sustainability (HEPS) January 20, 2012 Presenter: BPU President Robert Hanna.
Demand Response in Connecticut Presented by: Bob Laurita ISO New England December 2, 2004.
NEEAP 2 UCD-NESC Workshop 25 April 2012 Dr. Stjohn O’Connor Department of Communications, Energy & Natural Resources.
Responding to the Electricity Challenges: Five Point Plan Overview 19 December 2014 Confidential 1.
Regulatory framework in the Energy Sector Chairman Ph.D. Tserenpurev Tudev Energy Regulatory Commission of Mongolia Energy Mongolia-2012 Ulaanbaatar Mongolia.
Sustainable Energy Systems Overview of contractual obligations, procedures and practical matters KICK-OFF MEETING.
DPW ENERGY EFFICIENCY PROGRAMME BRIEFING THE PORTFOLIO COMMITTEE ON ENERGY – 31 JANUARY 2013.
1/14 Policies/Programmes to Promote the Development of ESCO 5 March, 2012 APERC Workshop, Kuala Lumpur Bing-Chwen Yang Team Leader Asia Pacific Energy.
Connecticut Energy Efficiency Incentive Program Overview of Program February 2010 DPUC-Approved Energy Efficiency Incentives for Connecticut Electric Users.
1 EERMC Public Meeting on Combined Heat and Power September 17, 2013.
GENFLEX TARIFF AND INCOPORATION OF THE MEC INTO THE NMD RULES
IRP – Commitments required now Our objectives – IRP alignment (water, security, emissions, cost etc.) – Legal diligence – Financial sustainability (buyer.
PROJECT CLOSEDOWN WORKSHOP Alex Findlay Programme Manager YH GDT
Promoting Energy Efficiency In Buildings in Developing countries.
1 PROCUREMENT AUTHORITY AND RESPONSEBILITIES Dr. Fred Mugambi Mwirigi JKUAT.
System Reliability Procurement: Non-wires Alternatives in Rhode Island Tim Roughan National Grid.
Process Engineer’s Role in Project Management Dr Abdullah Malik.
Background Established by law in 2008 via the Clean and Affordable Energy Act. District Department of the Environment (DDOE) oversees the contract. The.
Distributed Generation Programs, Incentives and Interconnections Ian Loughran, P.Eng. DSM Program Leader Renewable Energy Programs
Energy & Environment Initiatives. 2 Technology Finance Group Supports demonstration projects & activities creating awareness The demonstration projects.
DTE Energy Commercial & Industrial Energy Optimization Program Energy Efficient, Sustainable Detroit DTE Energy Headquarters December 9, 2010.
Experiences as a ER buyer and a general outlook Olle Björk Swedish Ministry of Sustainable Development Washington
Lisa F. | May 20, 2014 Introduction to Lighting Incentives & Process for Medium/Large Customers.
UNIDO Vietnam Support for CDM projects in the Industrial sector: Pilot Project in Co-operation with the Austrian Industry Training Sessions on the Kyoto.
UESC Project Implementation Construction & Installation ä Issue TO for construction ä The pre-construction meeting ä Review/accept final construction package.
Town Of Douglas A Review of the Town’s Proposed Tax Incentive Financing (TIF) Agreement With American Pro Wind, LLC Presented To The Douglas Finance Committee.
PUBLIC PROCUREMENT OPERATIONS Dr. Fred Mugambi Mwirigi JKUAT 1.
S10 CONS5Q25 Lara Tookey. Review of estimators workings Decision on what margin to apply Bid submission details Submit your Tender.
Practical Problems Experienced with Industrial DSM Projects Marius Kleingeld 15 August 2012.
Page 1 Schedule Experimental Energy Reduction (EER) updated 2005 Note: This program is available to qualified participants within the EntergyArkansas,
Demand Response: Keeping the Power Flowing in Southwest Connecticut Presented by: Henry Yoshimura Manager, Demand Response ISO New England September 30,
NATIONAL GRID Winter Peak Demand Reduction Scheme (WPDRS) Michael Walsh ESB National Grid Sustainable Energy Ireland – LIEN Workshop Kilkenny, 22 nd July.
Ainārs Meņģelsons Public Utilities Commission Latvia 11th Baltic Energy Regional Initiative October 1, 2010 Jūrmala, Latvia ELECTRICITY REGIONAL INITIATIVE.
An overview of Demand Side Management (DSM) Implementation in RSA Morore Mashao ESKOM - DSM.
Weather Sensitive ERS Training Presenter: Carl Raish Weather Sensitive ERS Training Workshop April 5, 2013.
Introduction The following chapter will review: –Overview –Model assumptions –The Cost Proposal & Evaluation –Payments methodology –Financial Incentives/Disincentives.
PUBLIC–PRIVATE PARTNERSHIP (PPP) FRAMEWORK AND GUIDELINES Syed M. Ali Zaidi, P.Eng. PM(Stanford), Ph.D. Director, Strategic Partnerships Alberta Infrastructure.
PPP Legal & Regulatory Framework. PPP Policy In July 2008 GOK approved the PPP policy directive through which: PPPs are identified as a method for investing.
Structural Funds Managing Authority – Ministry of Finance 1 Technical Assistance Ilze Aleksandroviča Head of Control and Development Division EU Funds.
1. PRESENTATION TO THE SELECT COMMITTEE ON APPROPRIATIONS Public Hearing on Division of Revenue Bill March
Overview of Governing Document for Weather-Sensitive ERS Pilot Project Stakeholder Workshop Mark Patterson, ERCOT Staff March 1, 2013.
In September of 2012 the RA Government made amendments in the Resolution No 168 on ‘Regulation of Procurement Procedures". 1. It is the responsibility.
Introduction to the Project Cycle Jane Ebinger Senior Energy Specialist Sustainable Development Department The World Bank.
INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT–4144/SMB/HL-LHC (Point 1) IT-4155/SMB/HL-LHC (Point 5)
Presentation to the Portfolio Committee on Public Works 1 March 2016 GREEN BUILDING FRAMEWORK PROPERTY MANAGEMENT TRADING ENTITY.
- 1 - Presentation reference Demand Side Bidding - an IEA Development Project for Competitive Electricity Markets Presentation to Metering Europe 2002.
Here Renewable Energy Independent Power Producer Programme Bidder’s Conference 16 August 2012 Andrew Etzinger Senior General Manager Eskom.
Federal Energy Service Company (FESCO). The potential of power consumption decrease at different stages of energy efficiency projects implementation Existing.
Balancing Reserve Update Peter Bingham 26 th Feb 2014.
The Australian Energy Regulator SA electricity distribution determination 2015–2020 Framework and approach 20 November 2013.
André Hoddevik, Project Director Enlargement of the PEPPOL-consortium 2009.
1 Detailed EM&V Approach for each of BGE’s Proposed Conservation Programs January 10, 2008.
Renewable energy support schemes in the Republic of Moldova
Professor H. J Annegarn, Ms L Cape
Environmental and Social Considerations in Public Procurement
Exceptional Fuel Costs in LMP
Energy Saving Bureau Industrial energy audits in coherence with Directive on the promotion of end-use efficiency and energy services.
Proposed FY18 Program Changes
National Energy Regulator of South Africa
PRESENTATION ON THE CONDITIONAL GRANT TO THE SELECT COMMITTEE
Project Name: Project No.: XXX ESCo Addition Model XXX
WATER REGULATORY AUTHORITY
SOLAR WATER HEATING MASS PROGRAM
Training module EPC facilitators A role to play Add date.
Progress on the Renewable Energy IPP Procurement Programme
PG&E EV Fleet Program.
PG&E EV Fleet Program.
Presentation transcript:

DSM ESCO FUNDING STANDARD OFFER PACKAGE STANDARD PRODUCT PACKAGE Presented by : Clive Nicosia Designation : Energy Service Manager Eastern Region Date : February 2011

22 Medupi Financial & Economic Impact Project Schedule Project Summary ►Greenfields Project – Lephalale (Limpopo Province) ►6 Unit Coal Fired Power Station ►Planned capacity 4,764MW ►Projected project cost to completion ~R125.5bn ►Estimated 95% impact on Lephalale town GDP ►~ 70% contracts awarded ►Construction commenced March 2007 ►First Unit planned to be handed over April 2012 ►Subsequent Units at 8 month intervals thereafter ►Last Unit planned for handover during August 2015 Kusile Financial & Economic Impact Project Schedule Project Summary ►Greenfields Project – Delmas (Mpumalanga Province) ►6 Unit Coal Fired Power Station ►Planned capacity 4,800MW ►Projected project cost to completion ~R141.5bn ►Estimated 25% impact on Delmas town GDP ►~ 41% contracts awarded ►Construction commenced Mid 2008 ►First Unit planned to be handed over June 2014 ►Subsequent Units at 8 month intervals thereafter ►Last Unit planned for handover during October 2017 Ingula Financial & Economic Impact Project Schedule Project Summary ►Greenfields Project – Ladysmith (KwaZulu Natal Province) ►4 Unit pumped storage power station ►Planned capacity 1,352MW ►Projected project cost to completion ~R21.8bn ►Estimated 1% impact on Ladysmith town GDP ►~ 75% contracts awarded ►Construction commenced Mid 2006 ►First Unit planned to be handed over January 2013 ►Subsequent Units at 3 month intervals thereafter ►Last Unit planned for handover during November 2013 Build Programme Project Summaries: Medupi, Kusile & Ingula SOURCE: Eskom Build Programme; 30 April 2010 Project Assurance Reports

3 Eskom Funding (1) ESCoStandard OfferStandard Product Turnaround time6-18 months<1 month<1 week SizeProject > 1MW50kW < Project<5MW1kW < Projects < 100kW Eskom Payment Value Individual project calculation Standard value per kWh saved (per technology) Standard value per item calculated based on savings potential Contract price Customer & Eskom (< NERSA benchmark) Pre-determined price per technology (Rebate Calculator and subject to NERSA guidelines) Pre-determined price per technology (subject to NERSA guidelines) Payment mechanismProgress payments 40% on implementation 20% pax3 (based on M&V) 100% on installation (based on pre-determined “standard” savings) Investment committee decision Per project approval Bulk approval per technology (Technology List – TESCOT approved) Bulk approval per technology Individual calculation per item by TESCOT Procurement decision Per project based on submission Bulk approval for IC approved programme N/A (rebate paid as per delegation of authority) Legal agreementNEC Standardised, simplified legal agreement No legal contract Commitment letter from client

4 ESCoStandard OfferStandard Product Awarding of “contract” Per project based on submission “First come first serve basis” Conditions of legal contract NEC (with negotiable conditions) Standard SOP customised contract No legal contract Commitment letter from client Customer financial evaluation Per project based on submission Only for projects above R400k N/A Customer technical evaluation Per project via IDM PEC based on submission IDM PEC evaluation per project Not applicable (based on pre-approved technology list) Major difference Project based (each submission is a project) Contract based (bulk approval in principle) Contract based (bulk approval in principle) Eskom Funding (2)

DSM ESCO FUNDING Appoint an Energy Services Company (ESCo) to identify opportunities, compile proposal for submission to Eskom DSM for funding, implement and maintain DSM project in the customer’s plant. Commercial entities may also, on the other hand, register a project directly with DSM. The ESCo must be registered on the DSM database before any project will be accepted. ESCos need to be technically competent and financially sustainable to enter into performance contracts and maintain projects over the long-term. Preliminary task are performed at no cost to the client. Letter of intent to be issued to the appointed ESCo.

Project Evaluation Eskom DSM will undertake: Technical evaluation of the project Financial evaluation of the project Prepare documentation and present to Eskom investment committee for approval Prepare documentation and present to Eskom Tender committee for approval DSM agreement and NEC placement Pre Measurements and Verification Eskom DSM evaluation lead time is up to 10 months

STANDARD OFFER PACKAGE Pre-determined rebate 0.34c/kWh for the delivery of verified energy savings Rebate shall be payable over a period of 3 years This does not replace the existing EEDSM process. The ESCo can therefore elect to propose a project using the normal EEDSM process or the Std Offer Process Applicable for Industrial & Commercial end users Reduce energy consumption between 6am and 10pm Monday to Friday only. This reduction must undergo M&V Energy reduced after 10pm and before 6am on weekdays and on weekends will not be considered towards the payment for energy reduction. The pre-approved technology that will be piloted for the std offer will be the replacement or retrofitting of old luminaries (fitting) lamps and inefficient ballasts to the efficient luminaries and efficient ballast's. The project developer shall ensure that the approved technology complies with all laws and regulations relating to the installation, working environment and lux levels

Requirements: Reduce energy consumption between 6am and 10pm Monday to Friday only. This reduction must undergo M&V Energy reduced after 10pm and before 6am on weekdays and on weekends will not be considered towards the payment for energy reduction. The pre-approved technology that will be piloted for the std offer will be the replacement or retrofitting of old luminaries (fitting) lamps and inefficient ballasts to the efficient luminaries and efficient ballast's. The project developer shall ensure that the approved technology complies with all laws and regulations relating to the installation, working environment and lux levels. This does not replace the existing EEDSM process. The ESCo can therefore elect to propose a project using the normal EEDSM process or the Std Offer Process Applicable for Industrial & Commercial end users

Performance Payment Example: MAD - M&V592000kWh per annum Rebate34c/kWh Payment Term3years Initial Purchase Price R 603, Initial Payment of 40% R 241, Performance Payment 1 - Year 1 R 120, Performance Payment 2 - Year 2 R 120, Performance Payment 3 - Year 3 R 120,768.00

Standard Product Package  Eskom pays customer a rebate based on standard technologies, pre-determined savings per load factor, post implementation and after disposal of old technologies  Savings and Eskom rebate per technology change will be pre-determined  Only DSM/IDM pre-approved technologies will be given consideration for participation  No formal contract – only signed customer commitment for sustainability  Limited Eskom Procurement involvement  Standard Product projects will ultimately be managed & monitored at regional level.  Energy Advisors and Energy Service Managers will promote & launch the Standard Product process

Key Principles  Energy saving projects will be undertaken by Energy Services Companies (ESCO’s) or Eskom Customers  M&V methodology will be determined and published by the Assurance & Forensic department  Standard Product is aimed at giving the Advisors more options to tackle the market.  Applicable to savings of 1kW to 100kW:  Min Project size:  Demand Savings > 1kW and  Energy Savings > 2MWh.  Load factor > 15%  Max Standard Product rebate: R750,000 per project site (single metered entity)  No splitting of projects  Lighting now, near future heat pumps, showers, insulation.  Capped at LF of 85

Finance: Rebate Calculation Mechanism 2015/05/0512 Input current technology Maximum value that could be paid Technology payment factor(TPF) System generated savings Input number of units System gives approved DSM options Technology benchmark Final value after invoice & actual costs assessed System generated Energy Advisor input Note: Rebate limited to the least of = Benchmark x TPF x savings or Actual Project Costs.

Rebate limitations Maximum rebate to be paid to customer limited to: Least of: 1. Actual costs (Customer to provide proof of costs) 2. 85% X Technology Benchmark 3. TPF X Technology Benchmark TPF = Technology Payment Factor Rebate could be R/Mw or c/kwh based

IDM domestic heat pump rebate structure 100 L 200L Category 1 Rebate = R 3,668 Purchase Price = R 12, L 500L 400L Category 2 Rebate = R 4,320 Purchase Price = R 16, L500L Heat Pump tank Ranges The rebate and purchase prices to remain unchanged until year 2013

Thank you!! 15