Booster Bias Supply Upgrade April 2, 2014. First prototype was started in December The back half of the supply was totally gutted Transformer Interphase.

Slides:



Advertisements
Similar presentations
POWER TOOLS.
Advertisements

BTEC First Engineering
3 – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Process Strategy 3.
LCW Upgrades - Final Booster RF Cavity LCW Isolation Valve Replacement. – 8 valves and unions previously replaced – An additional 10 valves and unions.
Theory of Constraints Scheduling APICS PDM January 14, 2009.
Proton Source Workshop Booster Downtime Wednesday, December 8, 2010 T. Sullivan.
Old Main Group. Design Issues There are no changes to the overall Design It will remain the way it is The Attachment Issue is resolved Going to screw.
Not long ago, a manufacturer of copper electrical connectors had an idea.
QAD Planning and Scheduling Workbenches: Enhancements & Strategy Review Carianne Nieuwstraten, QAD Product Manager MWUG, March 20, 2012.
J. H. ChrzanowskiNSTX TF Flag Joint Design Review1 NSTX TF Flag Joint Design Review Fabrication and Assembly April 10, 2003 By: James H. Chrzanowski.
PEUGEOT 206 INSTALLATION 99’— 05’ TU5JP4
Spectrometer Solenoid Update Steve Virostek - LBNL MICE Video Conference #145 December 15, 2011.
Business Process A logically related sets of tasks or activities geared toward some business outcome. 1. Primary (value-added) 2. Support 3. Developmental.
Proton Source Workshop December 7 & 8, 2010 John Reid December 8, 2010.
CIRCUIT BOARD ASSEMBLY Board Stuffing: Double-sided FR- 4 glass epoxy circuit boards are used for all amplifier modules.
Assembly of Conductivity Flow Loop EAS 199B living with the lab (in preparation for calibrating conductivity sensor)
IB stave assembly A. Di Mauro, C. Gargiulo, J. Van Beelen ITS-MFT mini-week
WP7&8 Progress Report ITS Plenary meeting, 23 April 2014 LG, PK, VM, JR Objectives 2014 and current status.
HIE-ISOLDE (High Intensity and Energy) project Protection of superconducting solenoids MPE work shop – December 14, 2010 G.J. Coelingh TE-MPE-CP.
SERVICE CHARGES Does WCS charge for assessments and service?
Proton Plan PMG 3/22/07 E Prebys 1 Proton Plan Status February Eric Prebys.
Linac Marx Modulator Update Trevor Butler 10/29/2014.
+ STAR HFT Upgrade – Installation and Integration Rahul Sharma Brookhaven National Laboratory.
Control System and Electrical Assembly Produced by Ed Latimer, Team 476 Ken York, Team 476 Ron Markum, Team
FLUID POWER Christopher Peterson Intro to Tech and Science Education.
J A Hill – EID RAL 1-2 September EE End Cap Mechanical Design ECAL EE End Cap Engineering CMS-UK Collaboration Meeting Brunel University September.
Booster Bias Supply Upgrade March 13, Three New Ferrite Bias Supplies Two are working and installed. One in MI station #5, one in Booster station.
9.3 Computer System Support. Total Cost of Operating Computer Systems Total Costs of Ownership (TCO) – costs of installing, operating & maintaining Includes.
All Experimenters Meeting PIP Report William Pellico on behalf of PIP team 4/7/2013.
Schedule and Work We are moving into a very intensive 4 months with a lot of work to be carried out Electrical services to the devices – after the South.
HAPEX III / PVDIS Targets Dave Meekins. Target List Loops – LH2 25 cm – LD2 25 cm – 20 cm Spare Solid target – Dummy tgts of correct length – Optics tgt.
Booster Bias Supply Upgrade November 30 th, 2011.
2015 Shutdown Joe Compton 3/11/2015. RIL PIP Work  Install operational laser notcher  5 days  Dave Johnson & Todd Johnson.
UPDATE ON THE CRYOSTAT DESIGN AND INSTALLATION SEQUENCE.
Progress to Date PPPL Advisory Board Meeting May 20101NSTX Upgrade – R. L. Strykowsky CD-0 Approved February 2009 The NSTX Upgrade Project organization.
STATUS OF NOKER PULSER FOR SHORT MAGNETS C. C. JENSEN DECEMBER 4, 2013.
Assembly Procedure ALICE Outer Barrel Stave 14 Module 2 Cold Plates 1 StaveMarco Kraan Paul Kuijer.
LNF activities on WPC Panels Construction of prototypes and layout Status of tooling Proto 0, open items, plan,...
DES FE Workshop at FNAL December 14-15, 2005 Vaidas Simaitis, University of Illinois at Urbana-Champaign 1 DHE Crate Design and Status The mechanical design.
Matthew Gardner, 8/20/14.  Replace old water based AC system with conventional rooftop AC system. Drain and abandon old water lines.  Remove old air.
CERN adb Chamber Support Structure Installation MUON SYSTEM INTEGRATION MEETING - Status of Production of support panels - Things to be settled.
Chap 4 - Facility Layout: Manufacturing and Services.
PIP Budget Codes Budget FY12 Updates October 19, 2011 PIP Meeting.
Booster Bias Supply and Cavity Upgrade November 16 th, 2011.
Muon Meeting April 2004JsG Status of Chambers Production at CERN Jean-Sebastien Graulich o Open Questions from the PRR O-ring Aging, Aging tests, Storage.
CMS Upgrade Workshop, FNAL, Nov 19-21, O.Prokofiev CMS Upgrade Workshop Updated ME4/2 chamber construction costs and prototype Status and plans.
Chapter 11 Selecting the Best Alternative Design Strategy Modern Systems Analysis and Design Third Edition 11.1.
Field and Laboratory Work Inspection, Testing, and Surveying Office Work CAD and Design 4-Year BS Degree Applied Engineering Technology Field and Laboratory.
Dick Loveless Upgrade report 12 Oct EMU Upgrade Report Dick Loveless University of Wisconsin 12 October 2012.
February 14, Comprehensive Review B. Schmidt Outline: Status and overview of activities: –Platforms and staircases –Muon Filters and beam plugs.
XR621 Drive Hose Update Kit. Removal Turn off Battery dis Drain hydraulic tank Remove both rubber lines under chassis and discard. Remove and discard.
Proton Plan Director’s Review 8/15/06 Prebys Proton Plan Summary Director’s Review August 2006 Eric Prebys.
Proton Plan PMG 10/13/05 E Prebys 1 Proton Plan Status September Report Eric Prebys.
Private Four-Year College (Evening BS Degree Program Years)  Civil Engineering Technology  Mechanical Engineering Technology Key Features of the.
August 2007 Booster RF Upgrades J.Reid Booster RF Upgrades West Gallery LCW modifications: – Headers in select locations to be upgraded by.
PIP Update July 29 th Agenda Summary Update – Current Activities – Updates Tom Kubicki (Station 20,21,22 – Gallery and Equipment Work) – Additional.
PIP Update August 12 th Agenda Summary Update Current Activities Update – Ryan Crawford - Booster Anode Power Supplies – Dave Johnson - Laser Notcher.
Update: Puck and Gun Magnet March 1, Magnetized Gun 2 K 2 CsSb Preparation Chamber HV Chamber.
Intensity Dependent Quad Ramps We know that in order to get the most intensity, the quad ramps must be tuned for a particular intensity. The way this is.
Chamber mechanics Chamber mechanics Production in China Peking University Group – 20 Aug
CMTF GROUNDING FOR PIP-II K. Carlson PXIE Electrical Coordination Meeting December 19 th, 2013.
Magnetized Beam LDRD: Design Tasks February 19, 2016.
Laljibhai Chaturbhai Institute of Technology. Bhandu Affiliated to Gujarat Technological University, Ahmadabad Sub: Engineering Economics & Management.
09/21/07Shutdown’07 Week 7 F.G. Garcia1 MTA beam line installation Weekly Report September 21, 2007 Period covered: September 14 th September 21 th (Week.
PIP Update May Agenda Summary Update – Activities – Budget – Plans Update Slides – Solid StateTom – ModulatorsRene – High Power Ferrite Testing.
Proton PMG May 7 th 2015 Cons Gattuso AD Shutdown Manager.
S A Griffiths CM42 June 2015 Electrical & Control.
PROCESS SELECTION Refers to the way an organization chooses to produce its good or services. It takes into account selection of technology, capacity planning,
Chapter 3 MANAGING THE TRANSFORMATION PROCESS
News and brief overview of Beamline plans for the next few months
Presentation transcript:

Booster Bias Supply Upgrade April 2, 2014

First prototype was started in December The back half of the supply was totally gutted Transformer Interphase reactor SCR/heat sink assemblies All water hoses Relocated various chassis and supplies  A few need re-wiring Assembled as much as possible to finalize layout Huge relief when it was verified that everything was going to fit without a major overhaul

Slow going on first supply  Not worked on full time  Many delays with materials and parts  Many discussions and decisions on final layout  High priority on ease of future maintenance  Second gutting for final hole drilling, documenting and installation of plated parts.  Made “doubles” of many parts

◦Now have two techs from EE Support (80%)  High current copper bus bars  Need 10 of these which are very labor intensive  Flexible copper straps  Need 120 of these  Fairly tedious to assemble, solder and drill  SCR/heat sink assemblies  Need 20 of these

◦Next bias supply rehab: Much faster!  Layout is finalized and documented.  Have 80% of parts and material on hand  Few more in-house machine shop jobs  Off-the-shelf electrical parts  EE Support techs working on labor intensive assemblies  ~2 month turn-around on next supply  Training full-time worker  Ordering remaining parts  Remaining supplies have solid wall separating front and back, possibly creating a few problems  ~1 month turn-around thereafter