HH - 2011 Dec 13Ivo Polák, FZU, Prague1 LED notched fibre distributing system QMB1 single LED slice Ivo Polák, on behalf prague’s group 1.QMB1.

Slides:



Advertisements
Similar presentations
Jiri Kvasnicka, EUDET meeting at DESY 1 Optical fibre calibration system Jiri Kvasnicka Outline Results from recent tests – LAB Test.
Advertisements

Optical Fiber Calibration System and Adaptive Power Supply Jiri Kvasnicka, Ivo Polak, Jaroslav Cvach Prague, Institute of Physics Gerald Eigen,
LED calibration systems for CALICE hadron calorimeter June 11, 2011TIPP 2011, Chicago1.
LCWS2010, Beijing, 2010 MAR29 Ivo Polák, FZU, Prague1 LED notched fibre system at AHCAL Calibration system for SiPM Ivo Polák 1.Notched fibre.
Calice, UT ArlingtonJiri Kvasnicka, FZU, Prague1 LED notched fiber system Jiri Kvasnicka 1.Introduction 2.Test setup and fiber layout on HBU0.
Ivo Polák SiPM needs short optical pulses
LED calibration systems for CALICE hadron calorimeter Jiri Kvasnicka, Ivo Polak Institute of Physics (FZU), Prague June 11, 2011TIPP 2011, Kvasnicka1 The.
ECFA, JUN10, 2008Ivo Polak, IPASCR, Prague1 Electronics part of AHCAL calibration system ECFA meeting at Warszawa.
EUDET, OCT8 - 10, 2007 Ivo Polak, IoP Prague1 A fast LED driver prototype for HCAL calibration EUDET annual meeting at Ecole Polytechnique, Palaisau.
External calibration system - QMB6 Distribution of light: Notched Fiber Calibration and Monitoring Board (CMB) 1-ch LED driver (QMB1) Calibration System.
DESY, DEC-2013Ivo Polák, FZU, Prague1 Activity on Adaptive power & Calibration at Prague Ivo Polák, on behalf of Prague’s group QMB1A update.
Tests of the fiber-based calibration system CALICE collaboration meeting Cambridge, UK 2012/9/18 Jaroslav Zalesak Institute of Physics, Prague  QMB1 LED.
Mathias Reinecke CALICE meeting Argonne EUDET module – Electronics Integration Contents -Next prototype : architecture -HCAL Base Unit (HBU)
Feb 20, 2009 CALICE meeting, Daegu, Korea QRL in Magnetic Field 1 QRLed Driver in Magnetic Field Jaroslav Zalesak Institute of Physics of the ASCR, Prague.
Optical calibration system for EUDET AHCAL module Jaroslav Cvach IPASCR 1.Calibration system for SiPM photodetectors 2.QRLED driver photoelectron spectra.
AHCAL – Electromechanical Integration EUDET annual meeting – Paris Oct M. Reinecke.
LED calibration systems for CALICE hadron calorimeter Jiri Kvasnicka Institute of Physics, Prague June 11, 2011TIPP 2011, Chicago1 Under.
LED calibration systems for CALICE hadron calorimeter
AHCAL Electronics. Status EUDET Prototype Mathias Reinecke for the DESY AHCAL developers EUDET Electronics/DAQ meeting London, June 9th, 2009.
AHCAL Electronics. Front-end electronics and DAQ Mathias Reinecke CALICE meeting Hamburg March 21st, 2013.
Uni Bergen:G. Eigen, J. Zalieckas, E. van der Kraaij FZU Prague: J. Cvach, J. Kvasnicka, I. Polák CALICE meeting, Argonne, 19/03/2014.
2013 MAR 21Ivo Polák FZU Prague1 Tasks for AIDA SiPM Adaptive HV PSU AIDA subgroup Prague 2013 meeting Characterization of temperature influence to SiPM.
AHCAL Electronics. Status Commissioning and Integration Peter Göttlicher for the AHCAL developers CALICE meeting UT Arlington, March 12th, 2010.
Calibration UV LED system for CALICE scintillator based Tile Hadron Calorimeter Ivo Polák on behalf of the CALICE Collaboration Institute of Physics of.
LCWA, ALCPG 2009 Albuquerque, NM Ivo Polák, FZU, Prague1 Calibration system of CALICE AHCAL detector Ivo Polák 1.Two calibration light distribution.
AHCAL Electronics. Status and Outlook Mathias Reinecke CALICE collaboration meeting Cambridge, UK March 16th-19th, 2012.
CALICE ANL, MAR18, 2008 Ivo Polak, IPASCR, Prague1 A fast LED driver prototype for HCAL calibration CALICE meeting at ANL, USA.
Light Calibration System (LCS) Temperature & Voltage Dependence Option 2: Optical system Option 2: LED driver Calibration of the Hadronic Calorimeter Prototype.
Munich, 18 Oct 2006J. Cvach, annual JRA31 JRA3 Institute of Physics ASCR Prague 1.ECAL, VFCAL (V. Vrba) 2.HCAL (J. Cvach) 3.Exchange in NA2 (travels 8.5.
1. DESY tests 2. Electronics developments 3. Optical developments 4. Outlook Casablanca J. Cvach, CALICE Coll. meeting.
ANL, MAR-2014Ivo Polák, FZU, Prague1 Activity on Compass 2 detector with Calibration at Prague Ivo Polák, on behalf of Prague’s group Compass.
1 NIU Integrated Readout Layer Kurt Francis NICADD Northern Illinois University March 19, 2014.
Optical Part of the CMB for AHCAL-CALICE Jaroslav Zalesak Institute of Physics, Prague.
May - 20Ivo Polák, FZU, Prague1 LED notched fibre distributing system Calibration system for SiPM Ivo Polák, on behalf prague’s group
5 July 2010Ivo Polák, FZU, Prague LED notched fibre distributing system Calibration system for SiPM Ivo Polák, Ji ř í Kvasni č ka
AHCAL Electronics. Status Commissioning Mathias Reinecke for the AHCAL developers HCAL main meeting Hamburg, Dec. 10th, 2009.
AHCAL Electronics. SPIROC2 and HBU measurement results Mathias Reinecke CALICE main meeting Univ. HASSAN II, Casablanca, Morocco Sept. 23rd, 2010.
oct - 6Ivo Polák, FZU, Prague1 Calibration system for SiPM and LED notched fibre distributing system Ivo Polák, on behalf prague’s group
E.Guschin (INR,Moscow) 3 May 2006Calorimeter commissioning meeting Status of PRS/SPD detector Cosmic test results Installation/tuning of monitoring system.
LED calibration systems for CALICE hadron calorimeter Jiri Kvasnicka, Ivo Polak, Institute of Physics, Prague June 11, 2011TIPP 2011, Kvasnicka1 The CALICE.
Main HCAL, JUL1,2008Ivo Polak, IP_ASCR, Prague1 Calibration system with optical fibers HCAL main meeting, DESY.
Short report on MPPC gain monitoring system S. Uozumi Jun ScECAL meeting At the FNAL BT, having the gain monitoring system for all the channel.
The 2 nd SCECAL module for the Fermilab beam test - tentative idea - S. Uozumi (Shinshu) Jun GLDCAL meeting Next beam test will be held likely.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
Tile HCAL status Felix Sefkow CALICE Technical Board Review April 19, 2007.
ShinShu, 2012 Mar 6Ivo Polák, FZU, Prague1 LED notched fibre distributing system QMB1 with HBU2 test Ivo Polák, on behalf of Prague’s group
2011 Sept 14-16Ivo Polák, FZU, Prague1 LED notched fibre distributing system QMB1 single LED slice Ivo Polák, on behalf prague’s group 1.QMB1.
AHCAL Electronics. Status and Outlook Mathias Reinecke for the AHCAL developers CALICE Days DESY Hamburg, March 31st, 2009.
Annual EUDET, OCT6,2008 Ivo Polak, IP_ASCR, Prague1 Calibration system with optical fibers for AHCAL EUDET annual meeting, NIKHEF 1.Introduction 2.QRLed.
AHCAL Integration. Status and Outlook Mathias Reinecke for the AHCAL developers CALICE week Lyon IPNL, Sept. 16th – 18th, 2009.
Status of NEWCHOD E.Guschin (INR), S.Kholodenko (IHEP), Yu.Kudenko (INR), I.Mannelli (Pisa), O.Mineev (INR), V.Obraztsov (IHEP), V.Semenov(IHEP), V.Sugonyaev.
DESY, 8 Dec 2005J. Cvach, prekick-off JRA3 JRA3 Institute of Physics ASCR Prague 1.ECAL, VFCAL (V. Vrba) 2.HCAL (J. Cvach) 3.Exchange in NA2 (travels 8.5.
AHCAL Electronics. Status of Integration Mathias Reinecke for the DESY AHCAL developers AHCAL main and analysis meeting Hamburg, July 16th and 17th, 2009.
PHOTOTUBE SCANNING SETUP AT THE UNIVERSITY OF MARYLAND Doug Roberts U of Maryland, College Park.
The Clock Distribution inside the CTA Camera Axel Kretzschmann, DESY Zeuthen,
Future Beam Test Plans of the Calorimeter Group Aug 学術創成会議 Satoru Uozumi (Shinshu) for the GLD calorimeter group We are planning to have two beam.
AHCAL Electronics. Status Commissioning Mathias Reinecke for the AHCAL developers EUDET electronics and DAQ meeting Paris Palaiseau, Jan. 14th, 2010.
AHCAL Electronics. status and open issues Mathias Reinecke CALICE ECAL/AHCAL - EUDET electronics and DAQ - AIDA DESY, July 5th to 6th, 2010.
LED notched fibre distributing system Calibration system for SiPM
JRA3 Institute of Physics ASCR Prague
LED notched fibre system short HBU0 party with QMB6
A fast LED driver prototype for HCAL calibration
Baby MIND Collaboration Meeting #2
CALICE meeting 2007 – Prague
Prototype activities update
LED notched fibre system at AHCAL Calibration system for SiPM
CALICE meeting 2007 – Prague
Status of the EUDET Prototype
A fast LED driver prototype for HCAL calibration
Scintillator HCal Prototype
Presentation transcript:

HH Dec 13Ivo Polák, FZU, Prague1 LED notched fibre distributing system QMB1 single LED slice Ivo Polák, on behalf prague’s group 1.QMB1 specifications 2.QMB1 with Trigger distribution 3.First test with HBU2 4.Notched fibre, semiautomatic machine 5.Resume

HH Dec 13Ivo Polák, FZU, Prague2 QMB1 Quasi resonant Main Board –Modular system, 1 LED per board –Operation mode: DAQ + CANbus control stand-alone mode –LVDS Trigger distribution system –Variable amplitude, zero to maximum (~1Amp) smooth –Pulse width fixed to ~ 5ns (UV or blue LED) –Voltages and temperature monitoring –Size of PCB: width 30mm, depth 140mm

HH Dec 13Ivo Polák, FZU, Prague3 Principal schema Larger inductor than the older QMB6

HH Dec 13Ivo Polák, FZU, Prague4 TRIGGER (T-calib) LVDS distribution to QMB1 Trigger from DAQ master slave Terminated 120ohm RX TX LVDS Up to slaves modules

HH Dec 13Ivo Polák, FZU, Prague5 Signal distribution at 30 x 140 mm^2 Two flat cables, Twisted pair for Trigger

HH Dec 13Ivo Polák, FZU, Prague6 Frame with 5 (and 1 spare) QMB1

HH Dec 13Ivo Polák, FZU, Prague7 3D draw of QMB1 LED fibre PWR 15V and CANbus T-calib LVDS flat cable

HH Dec 13Ivo Polák, FZU, Prague8 Real single LED board QMB1 Power 15V 60mA High level of LED peaks, 1.7A in pulse Delay can be easily trimmed within 9ns LED pulse width is shorter than expected 2ns, seen with current probe Tested now in stand- alone mode

HH Dec 13Ivo Polák, FZU, Prague9 PIN-PD response to QMB1 flash PIN-PD only, no preamp 5ns/div Upper: PIN-PD w preamp 10ns/div Lower: PIN-PD w preamp 50ns/div Maximal LED amplitude, LED airgap to PIN-PD

HH Dec 13Ivo Polák, FZU, Prague10 DESY test setup in December 2012 HBU2 DIF, PWR, CAL QMB1 T-calib from DAQ CANbus SPIROC2 PWR 15V combiner Notched fibres Single layer frame

HH Dec 13Ivo Polák, FZU, Prague11 DESY test setup in December Notched fibre (routed in paralel with blue line) Only 11 points were illuminated properly

HH Dec 13Ivo Polák, FZU, Prague12 Quick Friday’s QMB1 test with HBU2 Some config troubles occurred Generally, system is working easily, run in stand-alone mode Pulse position at different LEDs can be easy tuned within 1ns Near future plans (tomorrow) –Hold scan –Better notched fibre to install –Single p.e. peak spectra Next year plan (February) –More channels equipped with scintillators –Xtalk and light spread study System is working!, but Big spread due to combination of factors: Bad fibre, hold scan did not matched Distribution will be better, do not worry!

HH Dec 13Ivo Polák, FZU, Prague13 Notched fibres external company Safibra preparing the setup (semiautomat) to produce precise notches in the fibres We assume to have fibres made by new technology in 1.Q 2012, we assume less spread of the light at taps (<15% ). prototype fibres showed some systematic error (decay) in distribution of light, two test methodes  two results: flat and with decay. Under investigation now. illuminated by Green laser 24 notches

HH Dec 13Ivo Polák, FZU, Prague14 Notched fibres Semi-automatic tool Frame with x-y stepper motors Drill machine used as milling cutter to groove the notch Alu/PCB Template with moving scint tile PCB with 3mm holes Scintilator tile w SiPM Now in operational debugging & sw development stage

HH Dec 13Ivo Polák, FZU, Prague15 work at autumn of 2011 QMB1 (1-chanel LED driver): –Done 6 pcs of QMB1 in hand Tune QRLed driver to 405nm LED Trigger distribution (LVDS) proved Trigger delay can be tuned by C trimmer (~10ns) A few bugs in circuitry found Still short 3ns pulse –To be done: finishing and debugging of fw – CANbus and monitoring Set of notched fibers, semiautomatic machine in tuning procedure –Set: 3*fibre with 24 notches, creating a line of 72 notches. –3 sets of fibres will be delivered in 1.Q-2012

HH Dec 13Ivo Polák, FZU, Prague16 Resume QMB1 is in basic operational stage –It is working, no major troubles occurred –First 6 boards (version 1) we have in hand –More work on fw to be done Upgrade of QMB1(v2.0) is foreseen in mid of 2012 Notched fibre semiautomatic machine is hw ready, its sw is under development

HH Dec 13Ivo Polák, FZU, Prague17 Distribution of light: Notched Fiber Light is emitted from the notches The notch is a special scratch to the fiber, which reflects the light to the opposite direction The size of the notch varies from the beginning to the end of the fiber to maintain homogeneity of the light, which comes from notches First notchMiddle notchEnd position notch Emission from the fiber (side view) Iluminated by Green laser 24 notches

HH Dec 13Ivo Polák, FZU, Prague18 Mechanical layout of QMB1 Outer line: 30 (29) x 140 mm*2 4 mounting holes for M2.5 screw LED