MICE VC Alain Blondel 2 August 2007 1 Summary of the MICO meeting 26 July 2007 Overview TargetTarget (CB) Beam line engineering & installationBeam line.

Slides:



Advertisements
Similar presentations
MOM Report Ray Gamet MICE Operations Manager University of Liverpool MICO 18 th May 2009.
Advertisements

June 26, 2009TLH, NFMCC Friday Meeting1 MICE Updates MICE News Overview ISIS and MICE Schedules DAQ Review Spectrometer Update Aspirational Schedule Terry.
1 MICE Video Conference Installations to date Future installation work Plans for May shutdown MICO organisation Use of Technical Board.
MOM Summary 11/01/10 Due to the Inclement Weather it has perhaps been quieter than usual Water - Tank has been holding water fine. Some ice has been forming.
Technical Coordinator’s Report (KL for PD) Solenoid problems & Schedule Actions on –KL/CN: plan for work to December shutdown –KL/CN: plan for work in.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 20, 2009.
1 MICE PM Report General Update –Phase I civil engineering –R5.2 in June –Phase II design work –Phase II hardware –A few questions –Schedule, milestones.
March 2003 Paul Drumm MICE Collaboration Meeting, CERN 1 Beam Line & Installation Plans Paul Drumm CLRC Rutherford Appleton Laboratory.
Paul drumm; 1 st December 2004; PM&TB Report 1 Project Management & Technical Board Reports.
Project Report Paul Drumm CM15, FNAL June MICE Schedule Overview First beam September/October 2007 –Shutdown from January 2007 –Eight months for.
MICE FAC Alain Blondel 7 October   MICE The International Muon Ionization Cooling Experiment MICE CM19.
1 Project Manager Report Andy Nichols, STFC – RAL MICE Collaboration Meeting, Harbin, 13-17th January 2009.
MOM Report Ray Gamet MICE Operations Manager University of Liverpool MICO 11 th May 2009.
1 MICE phase I - Project Status Richard Apsimon (Project Manager) & Andy Nichols (Technical Coordinator) … with considerable help from Ken Long! MICE Video.
MICE Video Meeting, 10 Jan 081 Spectrometer Magnet Progress Michael A. Green Lawrence Berkeley Laboratory.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 12, 2010.
1 MICE PM Report Installations to date Future installation work Preparations for Phase Two Target status MICE Video Conference, 22nd May, 2008.
Alain Blondel MICE VC 9 september 2010 Spokesmouse report o VC 22nd April o 12th-13th May posters for IPAC (Vittorio Palladino) o VC 20th May o IPAC May.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO May 5, 2009.
MICO 8 th February 2010 Terry Hart (MOM) - Decay Solenoid and Target - MICE Machine Physics runs - Problems and Issues.
CMPB Alain Blondel 14 April STATUS OF MICE.
Spectrometer Solenoid Update Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory MICO.
Update Hardware for conductive cooling of the quench resistors has been fabricated at LBNL. Preparation for installation to start this week. Installation.
Electrical Installation CM39 Andy Gallagher & Ian Mullacrane.
MICE CM26 March '10Jean-Sebastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM25 o DAQ System Upgrade o Luminosity Monitors o Sequels of.
Project report. Status: MICE Muon Beam Target: –Target presently installed ‘in-operative’: Optical connections removed (why?) –Implies realignment/set-up.
MICE: overview K. Long, 18 March, Contents ► Introduction ► Beam line ► Infrastructure ► MICE steps ► Phase II (comment) ► Conclusions.
MICE CMPB Alain Blondel 19 April spokesperson remarks CMPB MICE NEWS.
Infrastructure Update As at 11 th March 2009 Remaining four plates now fitted to North shield wall North & South walls and all galleries are considered.
Project manager report paul drumm CM16 October 2006.
MICE CMPB Alain Blondel 1 August spokesperson remarks CMPB MICE NEWS.
Electrical Integration CM38 Steve Griffiths & Ian Mullacrane.
Status of installed target Preparation of “demonstrator” target Chris Booth Sheffield 25 th January 2008.
Alain Blondel – introduction MICE CM Collaboration meeting June 2007 at RAL Complete review of the project Organization of efforts towards.
MICO July 07Jean-Sébastien GraulichSlide 1 Detector DAQ Status o Overview – Hardware status o Installation at RAL o DAQ workshop o Current Activities Jean-Sebastien.
1M. Ellis - MICE VC - 1st November 2007 Cosmic Ray Test Preparations  The cosmic ray test was initially planned to be held in R12, but this proved to.
Target Status Target installed in ISIS “Demonstrator” target in R78 Chris Booth Sheffield 7 th February 2008.
1 MICE Hall construction status Richard Apsimon MICE VC meeting 29th Nov 2007.
Target Status CM19 RAL October 2007 P J Smith – University of Sheffield.
MICE VC Alain Blondel 30 August MICE VC 103 MICE news -- see Malcolm's news for an inventory. -- great funding news all summer from USA! (phase.
MICE FAC Alain Blondel 21 september   MICE The International Muon Ionization Cooling Experiment BRIEF STATUS OF MICE.
MICE CM35 Status and Goals Alain Blondel 1 WELCOME TO MICE CM35! – Status and Goals - Many thanks to Chris Rogers, Debbie Loader and Rose Hayes for taking.
MICE VC Alain Blondel 1 MICE NEWS MICE VC 161 Agenda Overall schedule Magnetic field mitigation review Status of things.
Spectrometer Solenoid Schedule MICE Schedule Review May 23 rd 2011 Roy Preece (STFC RAL, LBNL)
UK Update Package Managers Meeting 001 Roy Preece 13 th January 2014.
MPB 31 October 2012 and FAC 15 November monitor how well we are doing in assembling step IV ! -- should deliver a ‘realsitic schedule scenario’
Target tests 1 st – 2 nd Nov. Chris Booth Sheffield 7 th December 2006.
MICE Project Report Alan Bross (for Paul Drumm). Project Issues ● Key dates: – ISIS Synchrotron start-up scheduled for 1st August ● Shielded area around.
MICE VC Alain Blondel MICE News 9 March 2005 we did not succeed in preparing a good enough I3 proposal for EU on neutrinos. Problems were.
Target Commissioning Target installed in ISIS “Demonstrator” target in R78 Initial commissioning plans Chris Booth Sheffield 11 th February 2008.
Pre-CM33 schedule planning SuperMICO meeting, June 6th Motivation: For all of us to understand the main drivers behind the top-level MICE schedule So that.
OsC mtg 24/4/2014 OsC mtg Alan Grant. 2 OsC mtg 24/4/ MICE Finances - Forward Look.
1 MICE PM Report General Update –Phase I nearing completion –MICE Power –Actions for Decay solenoid & target –Follow-ups from last VC –Conclusions MICE.
1 MICE PM Report Infrastructure/integration progress Electrical work AFC, diffuser, etc Help with project control & staffing issues Worries & problems.
MICE CM20 Alain Blondel 10 February The International Muon Ionization Cooling Experiment MICE CM20 Spokesmouse remarks.
Chris Booth & Paul Smith Sheffield 16 th August 2007 MICE Target Installation.
MOM Report Linda Coney MICE Operations Manager University of California, Riverside MICE Video Conference May 20, 2010.
1 Project Infrastructure for steps I-III Tim Hayler, STFC – RAL MICE Collaboration Meeting, RAL, nd October 2008.
Malcolm Ellis – Brunel University – 8th April The International Muon Ionization Cooling Experiment.
Alain Blondel 4 April  Aspirational MICE Schedule as of April 2008 Febuary-July 2008 STEP I September 2008 November 2008 to summer 2009 STEP II.
Tuesday 9 th January Project Status Report Project Achievements Project Schedule Issues Finance Summary Risk Register Photos.
1 MICE PM Report Phase One installations to date Phase One remaining items Progress with Phase Two Worries Don’t have time for a detailed status report,
MICE VC Alain Blondel 1 MICE NEWS MICE VC Next Collaboration meeting will be at Cosener’s14-16 February meeting at Coseners House.
What do we want to achieve in this running period? Michael S. Zisman Deputy Spokesmouse Center for Beam Physics Lawrence Berkeley National Laboratory MICO.
Chris Booth Sheffield 29th March 2006
Target Installation Plan
MICE Target Report Video Conference 29/11/07
MICE CM31 Schedule summary
MICE PM Report Progress with the Infrastructure A few problems
Spectrometer Solenoid Fabrication Status and Schedule
Presentation transcript:

MICE VC Alain Blondel 2 August Summary of the MICO meeting 26 July 2007 Overview TargetTarget (CB) Beam line engineering & installationBeam line engineering & installation (CN) ToF0 ToF0 (MB) CKOV (GG / LC)LC ToF0 & CKOV integrationToF0 & CKOV integration (WL) Spectrometer spectrometer magnetspectrometer magnet (MZ) tracking detectortracking detector (KL) Integration (SV / KL / WL) Diffuser (WL) Control roomControl room (PK) NetworkNetwork (AO) DAQDAQ (JSG) Controls Infrastructure (BM) Electrical InstallationElectrical Installation (IM) Mechanical ServicesMechanical Services (CN) AoB see details in MICO meeting web page and summary in MICE note 174

MICE VC Alain Blondel 2 August Target (Sheffield; C. Booth and P. Smith) Target functioning reliably – 3.7 M actuations over 12 weeks. this is about what we expect from >1 year of operation of MICE Bearing wear considerably reduced with use of leaded bronze further studies to be done with Diamond-like Carbon aim to install in early november

MICE VC Alain Blondel 2 August Leaded bronze bearings after 1.5 M pulses <-- Brass bearing after x pulses

MICE VC Alain Blondel 2 August Dust at bottom of housing (after 1.5 M operations) Expect <1% of this to fall in ISIS vacuum pipe Is this acceptable to ISIS? proposal will be discussed with Steve Pin, writen up and sent to David Findlay for approval. Alternative – DLC (Diamond-like carbon) coated shaft & bearings received new shafts from Oxford. Will send off shaft & bearings for commercial coating Test will take at least 3 weeks (2 M pulses) once received. ready in october?

MICE VC Alain Blondel 2 August Beam line engineering and installation (sketch!) magnets Q1-3 and B1 installed, not connected to power and services Magnets Q1 and B1 have been measured Sand bags will be requested in the hole from MICE to ISIS only after measurements in shielded area Magnet B2 is in place in recess position need alignment, water, power shielding is complete (today) PSI solenoid will be moved there for cold test Q4-Q9 refurbishment in this zone, Q4 is reassembled schedule for completion to be drawn MICE Local Control Room MLCR to be finished in october Linde plant

MICE VC Alain Blondel 2 August THE DIPOLE B2 in place (recess position)

MICE VC Alain Blondel 2 August PSI solenoid successful repair with help of Walter Gloor one of the tie-rods to the cold mass had also fallen off. Magnet is actually in good condition. Plan is to finish off repairs at front of solenoid, MLI insulation and replace the cover. Next is cold test and Linde refrigerator will be needed, but there is a legal issue as the certification of the whole assembly by Linde is missing (not just parts). next is collecting cold box etc... timescale is September mid October the latest. The position in the hall for cold testing is on the south side of the hall It does not interfere with possible test or installation of detectors on the beam line. Action keep pushing for the Linde contract to be signed. (Tom Bradshaw)

MICE VC Alain Blondel 2 August Tracker -- 9 tracker stations have been completed by now. (5 for one tracker) Still a few problems with the light validation bench. No dead channels seen and a few only have apparently a little less light. Main and urgent issues the need for specification of path of the low voltage cables and need to define the fire alarm system to have permission take the spares from D0. Fermilab will go ahead with a design using the VESDA system. Spectrometer solenoid on track and progressing well (See Steve V. talk) EXPECTED delivery of solenoid I at FNAL end december 2007 and at RAL 2 month later (late february) after magnetic measurements. ==> start step II in April. began winding of second solenoid Integration in solenoid (lau): PID shield being finalized with Ghislain Diffuser drawings internally reviewed; external reviewers will be sent material asap. NB these are typical technical coordinator actions we stumble on those at the moment

MICE VC Alain Blondel 2 August Magnet 1 Cold Mass after Banding Coil M1 Coil M2 End Coil 1 Center Coil End Coil 1 Quench Protection System

MICE VC Alain Blondel 2 August Magnet 1 Cold Mass Supports Cold Support Band Intercept Clevis Warm Support Band Warm Adjustment Screw Cold Band Bearing

MICE VC Alain Blondel 2 August Magnet 1 Quench Protection System Quench Protection Resistors Cold Diodes

MICE VC Alain Blondel 2 August CKOV Parts of the first (of 2) detector have arrived at RAL (+ L.Cremaldi and David) Customs overcome with 'magic words' – not totally smooth, but getting there! Aerogel, box, mirrors (From USA) and phototubes (from Trieste) will be ready in september second CKOV could be there for November. Support being build under supervision by W. Lau (Oxford) TOF0/1 being built in Milano, delivery at RAL 1st November with laser calibration system DAQ delivered by JS Graulich and V Verguilov. All installed in R12. --> DAQ workshop July: -- interface with software and data storage -- transmission of knowledge to tracker group (James Leaver et al) -- empahsized need for Controls and Monitoring task (Daresbury) to begin (Target control, beam magnets, safety)

MICE VC Alain Blondel 2 August DAQ -- RAL In R12 (East) 2 VME Crates - 2 Interfaces - 2 Trg Receiver - TDC V Scaler V830 - fADC V PCs 2 NIM Crate 1 Network Switch 2 Scint. + PMT from IC

MICE VC Alain Blondel 2 August this shows cable routings, control room etc... and was sent to all MICE for verification (A. Oates) WBS leaders should look at the diagram of electrical and mechanical services, and find out if any requirements that are known to them are close enough to the foreseen outlets.

MICE VC Alain Blondel 2 August MAIN MESSAGES MICE is recovering from the major hickup (Project manager resignation) and associated collateral dammages (PSI solenoid, lapses of communication, delays in refurbishment of quads etc...) thanks to the dedication of many MICE and Ken Long and Chris Nelson in particular. -- Priority #1 is to ensure that full beam line is ready for step I data taking at the end of the christmas shutdown (20 January) -- It appears desirable and possible (though not certain at the moment) that beam provided by a simplified version of the beam line (target, Q1-Q3, B1, B2) could be operational in November together with a good fraction of detectors (CKOV, TOF, perhaps even the tracker) taking advantage of ISIS developments breaks in septembre and maintenance break on 4-8 November. -- this is a natural step in the debugging of the beam line and would allow major test of the part of the beam line that is installed in the ISIS vault (--> possible fixes in the Xmas shut down) -- calibration of pions/ISIS irradiation, a major unknown at the moment. -- shake-down of the detectors and DAQ, installation in the control room -- generally keeps the momentum rolling and avoids work pilup in february Meanwhile detectors will be integrated with Cosmics in R12 mezzanine Uncertainties concern target, PSI solenoid, controls and Hall installation; The rest of MICE is on schedule

MICE VC Alain Blondel 2 August  Aspirational MICE Schedule as of july November 2007 Or January 2008 STEP I April 2008 STEP III July 2008 STEP II STEP IV Delivery of 1st FC May 2009 STEP V summer 2009 STEP VI end 2009 (or 2010) UK PHASE I UK PHASE II