Module production at Heidelberg Responsibilities: assembly and test of 60 F- modules (5 m) September 28: Series module # 12 finished  20% reached Full.

Slides:



Advertisements
Similar presentations
Source Driver Status CMS Week November 2007 P. Debbins University of Iowa.
Advertisements

Seog Oh/ Duke University/June, 2003 TRT/ ATLAS week at CERN Duke Production Status.
1 AMS-02 TRD Status Report Stefan Schael RWTH Aachen TIM Meeting, CERN, June 2001 TRD meeting: Wednesday 16:15 in room !!!
Proton Plan PMG 7/26/07 E Prebys 1 Proton Plan Status June Eric Prebys.
TRD Production at GSI Joerg Hehner TRD Collaboration Meeting Bucharest
TRD Collaboration Meeting GSI Clemens Adler TRD Chamber production issues General Issues, Planning and Hd Status.
Hd Status and Planning TRD Chamber Construction Meeting Clemens Adler.
1 Long Term Module Testing-Anthony AffolderTPO, December 11, 2003 Current Module LT Testing Capability Only Vienna Boxes Available  10 slots at each site.
TRD Status Meeting Münster Clemens Adler TRD ROC Status Status Meeting Münster
Chamber production status 75% of production (of 1st half of detector) reached in May Currently ~80% is produced 100% (1st half) expected in October. End.
Update on Be Wall Cavity Steve Virostek Lawrence Berkeley National Lab MTA RF Workshop November 15, 2010.
US Tracker Group Status Sep. 1, 2005 J. Incandela For the US CMS Tracker Group.
TRD Status meeting Alice week HdClemens Adler TRD Chamber Status News: New leak rate measurements Production is imminent Some material arrived Soldering.
Production Readiness Review of Frascati MWPC Production Site December 4 th, 2003 – P. Campana.
G. Martellotti CERN 22/04/20021 Tooling / Test Stations for MWPC (Meeting LNF, Roma1/Pz ) Production rate : 408 chambers (Fe + LNF) :192 R4 M1.
ISR Work Progress Report Muon Week April 10 th 2003 A. Benvenuti INFN Bologna.
Chiho Wang ATLAS TRT Duke University CERN, Feb TRT Barrel assembly status & schedule Feb. 9, 2005.
1 TEC pilot run status Goal : test TEC module production rate capabilities - 15 R6 modules assembled on Brussels Gantry and bonded in Aachen I - 15 R7.
TMDB delay and production plan Augusto. TMDB Prototype Status The prototype boards almost fully assembled should be delivered this week ( May 5 th ) First.
Activities Status and Plan for the week D. Giugni / INFN Milano D. Giugni Monday Meeting
Group Electronique Csnsm AGATA SLOW CONTROL MEETING 19th fev AGATA PROJECT PREPROCESSING MEZZANINE SLOW CONTROL GUI FOR THE SEGMENT AND THE CORE.
Status of NA62 straw electronics and services Peter LICHARD, Johan Morant, Vito PALLADINO.
Simulation Based Production Planning, Scheduling, and Control Johannes Krauth Sim-Serv.
Seog Oh/ Duke University/Oct, 2002 TRT/ ATLAS week at CERN Wire-Joint Production Stringing Status.
16-Oct-15S.Movchan Straw manufacturing and QC1 Straw machine status polished anvil new welding configuration software for on-line seam quality control.
Soldering, crimping and an insulating. Proper soldering techniques Proper soldering is very important, a “cold”, a weekly soldered connection, or a solder.
HBD FEM the block diagram preamp – FEM cable Status Stuffs need to be decided….
M. Gilchriese Sector Status Module Loading Task Force Meeting November 18, 2004.
Silicon Meeting July 10, 2003 Module and Stave Production Status James Fast Fermilab.
May 2001, Istanbul Workshop High Voltage Plates and Capacitor Status Jack Fowler.
D0 PMG 12/2/99 Fiber Tracker Status  Carbon fiber work u All support cylinders done u Some work remains on band/support pieces + work for Silicon Detector.
Abe Seiden December 2003 SCT Week S USA SCT Barrel Module Assembly SCT Week CERN December 2003 Presented by Abe Seiden U.C. Santa Cruz.
Status of production at LNF E. Dane, C. Forti, D. Pinci, A. Sarti – LHCb Muon CERN 25-may-04 Monday 24-may: closed chamber 30. Will close 2 more this week.
27 Octobre 2005IEEE2005 Nuclear Science Symposium, Puerto Rico, Niels Tuning 1/18 A High-Efficiency and High- Resolution Straw Tube Tracker for the LHCb.
Chamber construction Construction Tools Production sites Assembly Sequence (“travelers”) Manpower P. Campana LNF – LHCb Muon EDR Cern April 16 th, 2003.
16/04/20031PNPI / LHCb Muon EDR Wire Pad Chambers PNPI design for regions R4 in Stations M2,M3,M4  4 gas gaps of 5mm±70µm;  Active area: 1224x252.8 mm².
Straw Working Group Status assembly at CERN Plans 10/2/14Straw WG.
LNF activities on WPC Panels Construction of prototypes and layout Status of tooling Proto 0, open items, plan,...
Forward Muon Installation and Commissioning Dmitri Denisov Fermilab Director’s review 7/12/1999 Plan Forward muon detectors Mini-drift tubes installation.
09/07/20021Muon Meeting Status of MWPC activities at CERN and PNPI Outline: Module 0 status and plans –M3R1 (CERN) –M3R2 (CERN) –M3R4 (PNPI) Tooling status.
9 March 2005OT Meeting - LHCb week - Production and QA, Niels Tuning 1/19 Outer Tracker Module Production at NIKHEF Produced 60 modules  Production Progress.
9 September 2004The Straw Tube Chamber1 The CDC Curtis A. Meyer Carnegie Mellon University Physics Requirements and Specifications Prototype Construction.
BI.DIS10: Magnets & generators R. Rosol, L. Sermeus, T. Stadlbauer, TE-ABT LIU review, 20 November
4-Jan-16S.Movchan Straw manufacturing and QC1 Straw tracker manufacturing procedure Dubna: assembly halls procedure conclusion Presented by S.Movchan.
Production Readiness Review at PNPI Chamber assembling: Main production and quality control steps 30 January 2004 – G.Alkhazov 1.Input components control.
Muon Meeting April 2004JsG Status of Chambers Production at CERN Jean-Sebastien Graulich o Open Questions from the PRR O-ring Aging, Aging tests, Storage.
G. Carboni - Muon Meeting – Muon Meeting 12/ Agenda IntroductionGiovanni (30’) GEM and TDR AddendumWalter (20’) Update on M1 ratesAlessia.
19/5/2004LHC-b OTR PRR1 Schedule and Resources Jan Spelt.
Seog Oh/ Duke University/Oct, 2002 TRT/ ATLAS week at CERN Test of the cleaning gas mixtures.
Statistical Quality Control Dr. Mohamed Riyazh Khan – DoMS SNS – College of Engineering.
1 HBD: Update and Schedule Itzhak Tserruya DC Meeting, BNL, April 13, 2005 Outline:  Full scale prototype status  Light source test  Construction Schedule.
TRD Workshop RomaniaClemens Adler Heidelberg ROC Status Material procurement, Chamber Status TRD workshop Cheile Grandistei, Romania,
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
Integration and commissioning of the Pile-Up VETO.
Lyon Gantry Status CERN 15 Sept D. Contardo Calibration Plates and Tools Readiness for production.
9/12/2003Ivan Hruska1 First box prototype –Box design in July ‘03 –Box produced during August ’03 Tested last week in few fingers Small changes necessary.
26-Feb-16S.Movchan Straw manufacturing and QC1 Dubna NA62 straw tracker assembly area (milestone) halls plans conclusion Presented by S.Movchan.
IEEE C /87. Status of Evaluation Criteria IEEE Evaluation Criteria CG IEEE Interim Meeting September 15-19, 2003.
8-Mar-16S.Movchan Straw manufacturing and QC1 Straw machine status anvil new welding configuration software for on-line seam quality control conclusion.
Assembly and Test of the Spectrometer (H.P. Apr. 16,1998) Status Module Assembly and Tests 1.) Status of completed hybrids and module 2.) Summary of the.
Hybrid and Module Status 1. Hybrid Delivery First hybrids over-etched and shrunk due to changes in design and mistakes in manufacturing – Shrinkage for.
21 Mar 2007ALICE - Paul Dauncey1 ALICE CR07: Installation and Commissioning Paul Dauncey Material from: L. Leistam: “ALICE Status” W. Riegler: “Commissioning.
September 5, Burkhard Schmidt Integration and Installation Outline: Integration and Infrastructure issues -Suspended platforms -Cable chains -Beam.
S.Movchan Straw manufacturing and QC
Acceptance test at Duke
Status of straw production straw module assembling
Long irradiation at the side
Module Production in Brussels
TSF Upgrade Project Overview Resources Plans and Timetable
Heidelberg Module Production
Presentation transcript:

Module production at Heidelberg Responsibilities: assembly and test of 60 F- modules (5 m) September 28: Series module # 12 finished  20% reached Full production speed reached since module 3

Status of module production: Production: preseries module: april 13 – may 6 start series production: may 9 break after module 6 for 6 weeks due to lack of material: (delay in straw delivery and wire quality) production resumed Last 4 modules before and last 4 after the break needed 5 working days each  this is the planned production speed  Safe extrapolation for production plan possible: 1 module every 5 working days Delayed start but smooth and fast production reached

Strawproduction HD now very stable after many improvements of the machine, new crimping technique for connection of tounge Straws/week week week 18week 35, 36 Start of 3 shifts/day (eff. 10 straws/hour ) stable straw production since 6 weeks, ~14 straws finished/hour. production is done by two half time people (students) After restart

Some experiences meanwhile: Overall status of production techniques very satisfactory and under control Quality of modules is good  see measurements Module 9: wire tension Module 9: pulse height

Module statistics: Acceptance criteria for wires (before closure of module) dark current < 100nA (typical <5nA) wire tension within +/- 5g of nominal value dark current 64 channels at 1550V in Ar/CO2 (70/30) # replaced wires 3 out of 3072 channels not operational

Manpower 2 experienced technicians ( wiring, glueing) ( + replacement in holiday period) 1 physicist for all tests and help in assembly 2-3 students (40 hours/month) for straw confectioning and soldering  Adequate to do the job in time

Overall production schedule: 2004: 12 modules finished + 11 modules (55 working days left effectively)  23 modules in 2004 (40%) 2005: 37 modules left, needs 185 working days ( we have about 230 days in a full year)  We will safely finish production before end of 2005 (assuming no major problems in material delivery etc...***)