Flow Time Problems Set 2 This is indeed Christine Cookies modified in MBPF 2 nd Edition.

Slides:



Advertisements
Similar presentations
Chocolate Chip Cookies. Ingredients: ½ cup butter (1 stick) 1/3 c. brown sugar (packed) 1/3 c. granulated sugar (white) 1 egg 1/ 2 t. vanilla 1 cup +
Advertisements

Process Capacity.
OPSM 301 Operations Management
1 3. Process Flow Measures Three Sequential Operations; One Oven Operation AOperation BOperation C You Oven Friend 15 Time (minutes) Capacity (per hour)
Michelle Koch For other treats around the holidays, visit:
Christmas Cookies By Brieya Pottinger. Ingredients and equipment.  Butter:75g  Sugar:35g  Flour:150g  Water: a tbsp  Weighing scales  A bowl  Spoon.
We are going to quarter your recipe Pillsbury Sugar Cookie Dough Cream Cheese, Softened Cool Whip Fruit Topping 1 package 8 oz 4 cup 4 cups.
Assignment Capacity.
Slide 1Time and Throughput Management & Improvement© Van Mieghem Bottleneck Management and Improvement  Time and Throughput: –Critical Path vs. Bottleneck.
3 Salad. Ingredients Vegetable (tomatoes……) Salad sauce Fruit (pear, apple……) A bowl.
Wash, mix, spoon BakeCoolPackAccept Payment min per dozen. 7.5 dozen per hour 10 min per dozen 6 dozen per hour 5 min per dozen 12 dozen per hour.
Baking Chocolate Chip Cookies Ms. Davis Life Skill Class July 11th, 2004.
Recipe for Scottish Shortbread By Primary 6/7 Miss O’Connor.
How to make Scones We are learning to write instructions.
Operations Management
Pizza Ingredients –150g pizza mix –110ml warm water –2 x 10ml Spoon of tomato puree –A Selection of prepared vegetables –4 x 10ml Spoon of grated cheese.
1 Ardavan Asef-Vaziri Jan-2011Operations Management: Waiting Lines 2 Bank of San Pedro has only 1 teller. On average, 1 customer comes every 6 minutes,
By Brianne and Lacey This presentation is going to explain to you how to make chocolate chip cookies. Supplies Ingredients Directions It will include:
Nestle Toll House Cookies Slide 1 Story will be narrated Back in 1930, Mr. And Mrs. Wakefield purchased a Toll House located halfway between Boston and.
Assignment Capacity.
4. Flow-Time Analysis Flow Time 3-Flow Time Reduction Levers Based on the book: Managing Business Process Flows.
1 4. Flow-Time Analysis Inventory adversely affects all competing edges (P/Q/V/D)  Has cost  Physical carrying costs  Financial costs  Causes obsolescence.
OM&PM/Class 2b1 1Operations Strategy –Class 1a: Introduction to OM –Class 1b: Strategic Operational Audits 2 Process Analysis –Class 2a + 2b: Process Flow.
Based on the book: Managing Business Process Flows.
1 Ardavan Asef-Vaziri Nov-2010Theory of Constraints 1- Basics Practice; Follow the 5 Steps Process Purchased Part $5 / unit RM1 $20 per unit RM2 $20 per.
1 Process Management and Strategy Introduction 1Ardavan Asef-Vaziri Sep-09 Process -1 Business Process Management Building block of Operations Management.
Kristen’s Cookies.
Baking Cookies Recipe Mixing Baking Final Product.
1 Ardavan Asef-Vaziri Nov-2010Theory of Constraints 1- Basics Purchased Part $5 / unit RM1 $20 per unit RM2 $20 per unit RM3 $25 per unit $90 / unit 110.
How to make bread.
OPSM 301: Operations Management Session 7: Process analysis Koç University Zeynep Aksin
How can I use skip-counting to solve problems? Sara’s packing 8 goodie bags with 5 pieces of candy each for a class party. How many pieces of candy does.
Lemon Shortbread Makes around 24 shortbreads 150 ⁰ C/300 ⁰ F/ Gas Mark 2 Ingredients: 200g Salted butter 25g Coconut sugar 75g Caster sugar (100g if not.
Tuesday, 2/9/10 SWBAT… solve systems of equations using the graphing method Agenda 1. WU (5 min) 2. Activity – Systems of equations: graphing method (20.
Operations Managment Kristen’s Cookie - Lecture 4 (Chapters 4 and 5)
Based on the book: Managing Business Process Flows.
Intro to Process Analysis II
1 Process Management and Strategy Introduction 1Ardavan Asef-Vaziri Sep-09 Process -1 Processes A business process is a recurring network of activities.
Baking Cookies English Club eats chocolate chip cookies!
Assignment Capacity More Problems. 2 Ardavan Asef-Vaziri March, 2015Capacity- Basics A local grocery store has 2 cashier stations, and 1 experienced cashier.
How To Bake A Cake Kayla Golack Period Exer03.
OPSM 501: Operations Management Week 4: Process analysis Kristen’s Cookie Koç University Graduate School of Business MBA Program Zeynep Aksin
A case on Flowtime, Batching and Costs
Friends for Chip By: Carla Vela.  This is Chip, Hershey C. Chip.
Instructional Video Read the Recipe Select Ingredients And Equipment Prepare The Recipe BAKING COOKIES IN THE VIRTUAL WORLD HELP About LO.
 7 yolks  ½ cup of sugar  6 cups of flour  ¾ g. of salt  5 g. of cocoa  vanilla  7 eggs whites  Mousse  A fork  A plate  A spoon  A bowl.
How to make “chocolate chip cookies” By Class Ping Nancy 11.
4. Flow-Time Analysis Flow Time 1-Introduction Based on the book: Managing Business Process Flows.
Are you ready to bake???? Coconut BallsChocolate Chip Cookies.
Take order wash mix spoonload & set coolbake 6/1-2 doz219 unlo- ad pack 25 get pay 1/order TFT = = 26 Problem 4.2: Part (a)
How to make chocolate chip cookies By Rose Savage.
Design and Control of a Home Delivery Logistics Network Michael G. Kay North Carolina State University.
Performance Measurement Financial
Does chocolate chip cookie dough sit in the refrigerator for 48 hours before baking it? By: Brooke Giaccone-Hammell And Julie Sentman.
© British Nutrition Foundation 2006www.nutrition.org.uk/cookclub Bread.
1. Put the flour, yeast and salt into a bowl. 2. Now add the oil and the water.
1 Ardavan Asef-Vaziri Sep-09Operations Management: Waiting Lines3 Example: The arrival rate to a GAP store is 6 customers per hour and has Poisson distribution.
Assignment Capacity. 2 Ardavan Asef-Vaziri March, 2015Capacity- Basics MamossaAssaf Inc. fabricates garage doors. Roofs are punched in a roof punching.
Take order wash mix spoonload & set coolbake 6/1-2 doz219 unlo- ad pack 25 get pay 1/order Problem 5.2: Flow unit = 1 order of 1 dozen. The unit loads.
How to Make Chocolate Chip Cookies
By: Reese, Madison, and Heath. If you let the wet ingredients soak into the dry ingredients in the refrigerator for 2 days, It will make the best cookie..
How to Make Chocolate Chip Cookies Fast, Easy, and Yummy Original Author Unknown Modified By: CTAE Resource Network.
Process Analysis.
Samples and Populations
Operations Management
Making a cake.
Critical Path Method Farrokh Alemi, Ph.D.
Let’s make Cookies!.
Assignment Capacity The recorded solution to the first problem is available at
Problem 4.2: Part (a) TFT = = 26 Take order wash mix
Presentation transcript:

Flow Time Problems Set 2 This is indeed Christine Cookies modified in MBPF 2 nd Edition

2 Ardavan Asef-Vaziri Nov-2011Throughput Problems – Set Kristen and her roommate are in the business of baking custom cookies. As soon as she receives an order by phone, Kristen washes the bowl and mixes dough according to the customer's order - activities that take a total of 6 minutes. She then spoons the dough onto a tray that holds one dozen cookies ( 2 minutes ). Her roommate then takes 1 minute to set the oven and place the tray in it. Cookies are baked in the oven for 9 min utes and allowed to cool outside for 5 minutes. The roommate then boxes the cookies (2 minutes) and collects payment from the customer (1 minute) a. Draw a flowchart for the process described here and determine theoretical flow time from the time of order until the time of payment collection. Assume no waiting over the course of the process b. suppose that each other consists of two dozen cookies. Assume that although the mixing bowl can accommodate dough for two dozen cookies at a time, the oven can accommodate only one tray of one dozen cookies at a time. As before, spooning each tray takes 2 minutes, and both trays must be cooled prior to boxing the cookies for customer pickup. Draw a modified flowchart and determine theoretical flow time. Consider the effect on flow time of the following possible alternatives to the system: 1. Buying a second oven that can bake one tray of one dozen cookies 2. Buying a second oven that can hold two trays of one dozen cookies each 3. Buying a faster convection oven that can bake one dozen cookies in 6 minutes instead of 9 minutes.

3 Ardavan Asef-Vaziri Nov-2011Throughput Problems – Set2 Take order wash mix spoonload & set cool bakeunload pack get pay Problem 5.2: Flow unit = 1 order of 1 dozen.

4 Ardavan Asef-Vaziri Nov-2011Throughput Problems – Set2 Take order wash mix spoonload & set coolbake 6/1-2 doz219 unlo- ad pack 25 get pay 1/order TFT = = 26 Problem 4.2 Take order wash mix spoonload & set coolbake 6/1-2 doz219 unlo- ad pack 25 get pay 1/order a)

5 Ardavan Asef-Vaziri Nov-2011Throughput Problems – Set2 wash mix spoon cool bake ulul pack Take order wash mix spoonload & set coolbake 6/1-2 doz219 unlo- ad pack 25 get pay 1/order lsls gpgp Part (a): Gant Chart and the theoretical flow time for 1 doz orders

6 Ardavan Asef-Vaziri Nov-2011Throughput Problems – Set2 Take order wash mix spoonload & set coolbake 6/1-2 doz219 unlo- ad pack 25 get pay 1/order Flow unit = 1 order of 2 dozen. Certain activities can be performed in parallel. For example, while the oven is baking the first dozen, You can spoon the dough for the second dozen into another tray. Therefore, the flow time of such an order is not simply the sum of the activity times. A useful tool is a Gantt chart that shows the times during which different resources of interest are occupied for various activities. The dough for the 2 dozen cookies is mixed by You in 6 minutes and subsequently you spoon dough for 1 dozen in 2 minutes. Therefore in the 8th minute, the RM is ready to load the oven and set timer, which takes 1 minute. The oven starts baking the first dozen at the 9th minute and completes baking at the 18th minute. Meanwhile, You spoon the second dozen into another tray. At the 18th minute, the RM unloads the first tray from the oven and loads the second tray into the oven and sets the timer. So the second dozen starts baking at the 19th minute. While the second dozen bakes, the first dozen cookies cool and RM packs them into a bag, which takes a total of 7 minutes. At the 28th minute the second dozen finishes baking at which time the RM unloads the tray. After cooling for 5 minutes, the RM packs the second dozen in 2 minutes by the 35th minute. Finally, payment for the order and delivery to customer takes place in the 36th minute. The theoretical flow time for an order of 2 dozen cookies is 36 minutes. Part (b): general explanations; mix can handle 2 doz, oven 1 doz

7 Ardavan Asef-Vaziri Nov-2011Throughput Problems – Set2 wash mix spoon cool bake ulul pack Take order wash mix spoonload & set coolbake 6/1-2 doz219 unlo- ad pack 25 get pay 1/order lsls spoon lsls bake cool ulul Part (b): Gant Chart and the theoretical flow time for 2 doz orders

8 Ardavan Asef-Vaziri Nov-2011Throughput Problems – Set2 cool 2 pack Take order wash mix spoonload & set coolbake 6/1-2 doz219 unlo- ad pack 25 get pay 1/order gpgp Part (b): Gant Chart and the theoretical flow time for 2 doz orders (cont.)

9 Ardavan Asef-Vaziri Nov-2011Throughput Problems – Set2 load & set bake 19 unlo- ad pack 2 Take order wash mix spoon 6/1-2 doz2 spoon 2 cool 5 load & set bake 19 unlo- ad pack 2 cool 5 get pay 1/order Part (b): CPM

10 Ardavan Asef-Vaziri Nov-2011Throughput Problems – Set2 load & set bake 19 unlo- ad pack 2 Take order wash mix spoon 6/1-2 doz2 spoon 2 cool 5 load & set bake 19 unlo- ad pack 2 cool 5 get pay 1/order Part (b): CPM

11 Ardavan Asef-Vaziri Nov-2011Throughput Problems – Set Max = Forward Path 35

12 Ardavan Asef-Vaziri Nov-2011Throughput Problems – Set2 load & set bake 19 unlo- ad pack 2 Take order wash mix spoon 6/1-2 doz2 spoon 2 cool 5 load & set bake 19 unlo- ad pack 2 cool 5 get pay 1/order Part (b): CPM

13 Ardavan Asef-Vaziri Nov-2011Throughput Problems – Set2 30 Min = Backward Path

14 Ardavan Asef-Vaziri Nov-2011Throughput Problems – Set2 wash mix spoon cool bake ulul pack Take order wash mix spoonload & set coolbake 6/1-2 doz219 unlo- ad pack 25 get pay 1/order lsls spoon lsls bake ulul cool gpgp Part (b1): theoretical flow time when buying a second oven with 1 doz capacity

15 Ardavan Asef-Vaziri Nov-2011Throughput Problems – Set2 load & set bake 19 unlo- ad pack 2 Take order wash mix spoon 6/1-2 doz2 spoon 2 cool 5 load & set bake 19 unlo- ad pack 2 cool 5 get pay 1/order Part (b1): CPM

16 Ardavan Asef-Vaziri Nov-2011Throughput Problems – Set2 wash mix spoon cool bake pack Take order wash mix spoonload & set coolbake 6/1-2 doz219 unlo- ad pack 25 get pay 1/order spoon lsls ulul gpgp Part (b2): theoretical flow time when buying a large oven with 2 doz capacity We do not need CPM since activities are sequential

17 Ardavan Asef-Vaziri Nov-2011Throughput Problems – Set2 wash mix spoon cool bake ulul pack Take order wash mix spoonload & set coolbake 6/1-2 doz219 unlo- ad pack 25 get pay 1/order lsls spoon lsls bake ulul cool packgpgp Part (b3): theoretical flow time when buying a fast oven with 1 doz capacity CPM is the same as the CPM for original case, just bake time is 6 min instead of 9 min.

18 Ardavan Asef-Vaziri Nov-2011Throughput Problems – Set2 Trade-off Analysis No Investment 36 Second Oven 28 Large Oven30 Fast Ovens30 The second oven (a)leads to the shortest flow time (b)Perhaps is cheaper than a large oven or 2 fast ovens

19 Ardavan Asef-Vaziri Nov-2011Throughput Problems – Set2 Take order wash mix spoonload & set coolbake 6/1-2 doz219 unlo- ad box 25 get paid 1/order TFT = = 26 Problem 4.2 Version2 - Both Boxed together: Part (a)

20 Ardavan Asef-Vaziri Nov-2011Throughput Problems – Set2 wash mix spoon cool bake ulul box Take order wash mix spoonload & set coolbake 6/1-2 doz219 unlo- ad box 25 get paid 1/order lsls gpgp Part (a): Gant Chart and the theoretical flow time for 1 doz orders

21 Ardavan Asef-Vaziri Nov-2011Throughput Problems – Set2 Take order wash mix spoonload & set coolbake 6/1-2 doz219 unlo- ad box 25 get paid 1/order Flow unit = 1 order of 2 dozen. Certain activities can be performed in parallel. For example, while the oven is baking the first dozen, You can spoon the dough for the second dozen into another tray. Therefore, the flow time of such an order is not simply the sum of the activity times. A useful tool is a Gantt chart that shows the times during which different resources of interest are occupied for various activities. The dough for the 2 dozen cookies is mixed by You in 6 minutes and subsequently you spoon dough for 1 dozen in 2 minutes. Therefore in the 8th minute, the RM is ready to load the oven and set timer, which takes 1 minute. The oven starts baking the first dozen at the 9th minute and completes baking at the 18th minute. Meanwhile, You spoon the second dozen into another tray. At the 18th minute, the RM unloads the first tray from the oven and loads the second tray into the oven and sets the timer. So the second dozen starts baking at the 19th minute. While the second dozen bakes, the first dozen cookies cool and RM packs them into a bag, which takes a total of 7 minutes. At the 28th minute the second dozen finishes baking at which time the RM unloads the tray. After cooling for 5 minutes, the RM packs the second dozen in 2 minutes by the 35th minute. Finally, payment for the order and delivery to customer takes place in the 36th minute. The theoretical flow time for an order of 2 dozen cookies is 36 minutes. Part (b): general explanations; mix can handle 2 doz, oven 1 doz

22 Ardavan Asef-Vaziri Nov-2011Throughput Problems – Set2 wash mix spoon cool bake ulul Take order wash mix spoonload & set coolbake 6/1-2 doz219 unlo- ad box 25 get paid 1/order lsls spoon lsls bake cool ulul Part (b): Gant Chart and the theoretical flow time for 2 doz orders

23 Ardavan Asef-Vaziri Nov-2011Throughput Problems – Set2 cool 2 box Take order wash mix spoonload & set coolbake 6/1-2 doz219 unlo- ad box 25 get paid 1/order gpgp Part (b): Gant Chart and the theoretical flow time for 2 doz orders (cont.)

24 Ardavan Asef-Vaziri Nov-2011Throughput Problems – Set2 load & set bake 19 unlo- ad Take order wash mix spoon 6/1-2 doz2 spoon 2 cool 5 load & set bake 19 unlo- ad box 2 cool 5 Part (b): CPM get paid 1/order

25 Ardavan Asef-Vaziri Nov-2011Throughput Problems – Set2 load & set bake 19 unlo- ad Take order wash mix spoon 6/1-2 doz2 spoon 2 cool 5 load & set bake 19 unlo- ad box 2 cool 5 Part (b): CPM get paid 1/order

26 Ardavan Asef-Vaziri Nov-2011Throughput Problems – Set Max = Forward Path 35

27 Ardavan Asef-Vaziri Nov-2011Throughput Problems – Set2 load & set bake 19 unlo- ad Take order wash mix spoon 6/1-2 doz2 spoon 2 cool 5 load & set bake 19 unlo- ad box 2 cool 5 Part (b): CPM get paid 1/order

28 Ardavan Asef-Vaziri Nov-2011Throughput Problems – Set Min = Backward Path

29 Ardavan Asef-Vaziri Nov-2011Throughput Problems – Set2 wash mix spoon cool bake ulul box Take order wash mix spoonload & set coolbake 6/1-2 doz219 unlo- ad pack 25 get pay 1/order lsls spoon lsls bake ulul cool gpgp Part (b1): theoretical flow time when buying a second oven with 1 doz capacity

30 Ardavan Asef-Vaziri Nov-2011Throughput Problems – Set2 load & set bake 19 unlo- ad Take order wash mix spoon 6/1-2 doz2 spoon 2 cool 5 load & set bake 19 unlo- ad box 2 cool 5 get paid 1/order Part (b1): CPM

31 Ardavan Asef-Vaziri Nov-2011Throughput Problems – Set2 wash mix spoon cool bake box Take order wash mix spoonload & set coolbake 6/1-2 doz219 unlo- ad box 25 get paid 1/order spoon lsls ulul gpgp Part (b2): theoretical flow time when buying a large oven with 2 doz capacity We do not need CPM since activities are sequential

32 Ardavan Asef-Vaziri Nov-2011Throughput Problems – Set2 wash mix spoon cool bake ulul Take order wash mix spoonload & set coolbake 6/1-2 doz219 unlo- ad box 25 get paid 1/order lsls spoon lsls bake ulul cool boxgpgp Part (b3): theoretical flow time when buying a fast oven with 1 doz capacity CPM is the same as the CPM for original case, just bake time is 6 min instead of 9 min.

33 Ardavan Asef-Vaziri Nov-2011Throughput Problems – Set2 Trade-off Analysis No Investment 36 Second Oven 28 Large Oven28 Fast Ovens30 The second oven (a)leads to the shortest flow time (b)Perhaps is cheaper than a large oven or 2 fast ovens