24/25 September 2002ATN2002 (London)1 Delivering CNS/ATM Services to the Aircraft Presented by Forrest Colliver A discussion of the FANS/ATN accommodation.

Slides:



Advertisements
Similar presentations
ATN-2000 AOC Migration Strategy Presented by Frank OConnor.
Advertisements

Flexible Airborne Architecture
ICAO Seminar on the Implementation of Datalink and SATCOM Communications Bangkok, November 2003 VHF ACARS to ATN Akhil Sharma.
1 C ENTRE D'ETUDES DE LA NAVIGATION AERIENNE PHARE Aeronautical Telecommunication Network: PATN By Gérard Mittaux-Biron PATN Project Leader CENA.
NexSAT SG#7 9 th March 2006 Future Communications Infrastructure Jacky Pouzet Communication Domain manager European Organisation for the Safety of Air.
Future Communications Roadmap
ACI/GM/3011/1.0 ACI's Portable ATN Software Products & Services Technology for next-generation aviation data communication… Presented by Forrest Colliver.
The Future of PETAL Technology
PETAL A major step Towards Cooperative Air Traffic Services Patrice BEHIER Manager of the Air/ground Co operative ATS Programme Directorate Infrastructure,
Page 1STNApresentation of data-link activities DATA-LINK IMPLEMENTATION IN FRANCE Initial data-link services with ACARS - Departure Clearance, ATIS - CPDLC.
VHF Digital Link Mode 2 Deployment Strategy Vic Nagowski
ATN ‘99, London, 23 September 1999 David Russell ATS Market Manager, SITA AIRCOM SITA AIRCOM Data Link Service.
Military Use of Data Link Phil Platt ATN2001, IEE, London
Air-Ground Data Link - DFS Strategy
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-40/PIA-4 Improved Safety and Efficiency through the initial application.
Controller-Pilot Data Link Communications Build I & Build IA Programs ATN 2001 Focus on the Reality of Data Link IEE London, England 19 September 2001.
24 Sept '02Page 1 FANS-1/A Accommodation in an ATN Environment.
Integrated information and telecommunications solutions AIRCOM Implementation VHF Digital Link Presented by Philip Clinch to ATN 2001 Conference 19 September.
ATN 2002 London September 2002 Presented by Aloke Roy Authors: Christophe Hamel Tom Judd Ketan Nguyen Bryan Rowe Kevin Wohlers ATN AIRBORNE IMPLEMENTATION.
FAA Controller Pilot Data Link Communications Program ATN ‘99 London, England James H. Williams September 22, 1999.
Data Link & CNS/ATM: A Business Perspective
Objective COM11 ESSIP Plan 2014 Adriatik KOKONA DSS/EIPR
Internet Protocol Security (IPSec)
The ATN Avionics Vendors View. ATN2001 Sept 2001; p.2 PETAL-II Avionics.
ATN/VDL Mode 2 Implementation Status
How the PETAL Trial Relates to the FAA’s CPLDC Program ATN 2001 Focus on the Reality of Data Link IEE London, England 18 September 2001 Gregg Anderson.
ATN Subnetwork Implementation:
ATN2001 Rev New Kent Fisher, Program Manager Boeing Air Traffic Management Kent Fisher, Program Manager Boeing Air Traffic Management.
B.PRADHAN,IAS CVO,AAI. Structure of Presentation  Background  Why need Next Gen ATS  What is Next Gen ATS  Benefits of Next Gen Systems  Conclusion.
Next Generation Air/Ground Communications (NEXCOM) Presented to ATN 2002 London, England 25 September 2002 James H. Williams Communications Integrated.
ATN 2002, London - 24 Sep 02 1 OPERATIONAL DATA LINK AT MAASTRICHT UAC P2L PETAL TO LINK Gustaaf Janssens Maastricht UAC Project Manager P2L.
IP-v6 Drivers for Aviation & Usage Concepts Terry L Davis Boeing Commercial Airplanes (Advisor to the North America IPv6 Task Force)
IPv6 integration with the ATN Tony Whyman Helios Information Services Ltd.
Page Lufthansa ASAS It's Time for a paradigm change... Workshop May 2003, Rome
FANS-1/A and ATN Data Link: An Avionics Perspective Bob Kerr
3rd ASAS TN Workshop 19 April – 21 April rd ASAS TN Workshop Session 4: Strategy and Implementation Package I Requirements Focus Group (“Rapid.
International Data Link Symposium st October 2003, Newbury, UK FEASIBILITY STUDY FOR CIVIL AVIATION DATA LINK FOR ADS-B BASED ON MIDS / LINK16 Bob.
Shaping Boeing Surveillance Strategy Drivers & Obstacles ASAS Thematic Network II.
ASAS WORKSHOP Roma April 2003 Airlines’ perspective Nicolas Zvéguintzoff Assistant Director- Technical / Financial Liaison – Europe.
Presented by Philip Clinch on 27 September 2000 at ATN 2000 Aeronautical Telecommunications Services.
The CASCADE Programme From Concept to Operations ASAS-TN Malmö September 2005 Alex Wandels CASCADE Programme Manager, EUROCONTROL European Organisation.
Direction générale de l’Aviation civile centre d’Études de la navigation aérienne First ASAS thematic network workshop The user’s expectations and concerns.
MFF is a EC co-funded programme Rome, 3-5 Aprili 2006 ASAS-TN2 Rome, 3-5 April 2006 Maurizio Zacchei, ENAV (MFF PM) Mediterranean Free Flight Programme.
1 Vince Galotti Chief/ATMICAO 26 March 2007 A PERFORMANCE BASED GLOBAL AIR NAVIGATION SYSTEM: PART I FITTING THE PIECES TOGETHER.
Page 1 FAA Future Air/Ground Communications System Architecture James Williams Integrated Product Team Lead Communications Systems ATN September.
International Air Transport Association Transition to the new CNS/ATM ATN 2000, September 2000, London Günther Matschnigg IATA Vice President Operations.
Federal Aviation Administration Data Communications Program FAA Prototype & Validation Activities Presented to:Data Comm Implementation Team By:Craig Morris.
1 Conditions for Mandating Data Link Equipage Steve Zerkowitz - IATA.
A consolidated starting point from DFS / AENA / LFV ASAS Thematic Network Workshop Toulouse, Is ASAS /ADS-B needed for ANSP strategy?
ATN2003 IEE, London CNS Infrastructure Partnerships Akhil Sharma Senior Manager AIRCOM Service Development.
LINK EEC Test Facility - ATN 2003 London 1 LINK Test Facility Overview Located at EEC Bretigny - France In support to LINK EATMP project.
September 2003 ATN Middle East Airlines CNS Developments in the Middle East Captain Ousama Balaa, Head of Technical Department Middle East Airlines.
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
Presented by Thales Avionics ATN 2003 London, UK September 2003
Communication Roadmap ACP WGW04 – AI5 Jacky Pouzet, EUROCONTROL
GLOBAL ink VHF Digital Link Mode 2 Progress Report to ICAO AMCP WG-M/2
The Air Ground Datalink Server (AGDS)
ATN/VDL Mode 2 Implementation Status
6th May 2002 Current Status of FAA Controller-Pilot Data Link Communication (CPDLC) - Build 1, 1A, and Beyond M J A Asbury Presentation ATN3.3 The development.
Ground based ATN Router Requirements
Ground System implication for ASAS implementation
NEXCOM Next Generation Air/Ground Communications Briefing Presented to
DATA LINK IMPLEMENTATION IN EUROPE
ATN Subnetwork Implementation:
Objective COM11 ESSIP Plan 2015 Adriatik KOKONA DPS/PEPR
FAA Data Communications Program System Engineering
Dave Behrens Director, Infrastructure Strategy IATA
The Need for Modernisation of ANSPs
Presentation transcript:

24/25 September 2002ATN2002 (London)1 Delivering CNS/ATM Services to the Aircraft Presented by Forrest Colliver A discussion of the FANS/ATN accommodation question, in the context of ground Air Traffic Service provider communication architectures

24/25 September 2002ATN2002 (London)2 The CNS/ATM Deployment Problem Statement (1 of 2) Deploying CNS/ATM…what we’d like… We all implement CNS/ATM the same way… at the same pace… based on “master plan”, standardized on a global basis. The reality… Regional stakeholders implement pieces of the CNS/ATM puzzle  based on local political & industrial priorities;  using available technologies & tailored operational procedures;  on an ad hoc basis. Meanwhile, ICAO, IATA, et. al. create the “real” CNS/ATM  international operational service & technology standards;  broad user consensus and on longer-term benefits models

24/25 September 2002ATN2002 (London)3 The CNS/ATM Deployment Problem Statement (2 of 2) The result… Competing non-interoperable CNS/ATM technologies & services Costly & inefficient process for stakeholders & vendors Compromised long-term CNS/ATM benefits No obvious growth path And of course…a lot of shouting… !

24/25 September 2002ATN2002 (London)4 Data Link Implementation… the Status Quo ATN : the ICAO, EUROCAE & RTCA standard for CNS/ATM European & US trials from 1992+; operational deployment in US from ; planning in progress in Europe CPDLC is the benefits driver, based on positive business cases (C/AFT, RTCA, EUROCONTROL) plus user demand Uses modern data links (VDL, SATCOM, ATM, IP etc.), thus integrity & performance suitable for high density airspaces Point-to-Point Data Link Services Trials in Europe & US from have matured a variety of broadcast link technologies (VDL4; Mode S, UAT) Main user of broadcast data links remains surveillance applications based on ADS-B: from basic air/ground surveillance to autonomous aircraft surveillance systems Broadcast media optimized for surveillance, not “data link” Broadcast Data Link Services FANS 1/A: de-facto oceanic data link standard Pacific region trials from 1993+; first operational use from (for routes in remote/oceanic airspaces) Services include FANS versions of ADS & CPDLC Uses ACARS/AIRCOM as data link; performance and integrity acceptable in non-dense airspaces Oceanic Data Link Services

24/25 September 2002ATN2002 (London)5 The point-to-point data link problem in focus… FANS 1/A & ATN look fairly similar on the surface… Both are point-to-point  sessions between controller, pilot and automated equipment Both support similar applications  context management, ADS & controller/pilot communication dialogs However… FANS 1/A constrained by ACARS/AIRCOM and legacy architectures  Result: performance and application limitations ATN designed for digital data links & future CNS/ATM architectures  Result: fit for ICAO CNS/ATM purpose with architectural growth potential Although significant application & performance differences exist between FANS & ATN, strong motivation for “accommodation” of FANS-equipped aircraft in ATN airspace exists, to better amortize FANS investments in these aircraft to-date.

24/25 September 2002ATN2002 (London)6 FANS “Accommodation” Scenarios and Consequences (1 of 4) FANS accommodation issues thoroughly studied… by ICAO, IATA, IRRF & other industry groups The conclusions, unchanged since 1995 ICAO analysis: 1. Current FANS 1/A airborne systems cannot be accommodated transparently in an ATN (EUROCAE ED-110) airspace implementing profile-changing messages without some form of operational workaround (procedural, voice read-back, etc.) 2. If FANS 1/A & ATN aircraft share ATN airspace without workarounds or upgrades:  ATN services must be limited to those common with current FANS 1/A  Profile-changing messages must be excluded  Ground gateways or multi-protocol ground hosts will be required In the case of FANS accommodation in dense/continental ATN airspace, ICAO CNS/ATM data link benefits will necessarily be constrained.

24/25 September 2002ATN2002 (London)7 FANS “Accommodation” Scenarios and Consequences (2 of 4) However, given that “FANS accommodation” transparent to the Air Traffic Service provider is not viable, but that the coexistence of FANS & ATN aircraft in the same airspace is required, what are the available communication architectural choices ?

24/25 September 2002ATN2002 (London)8 FANS “Accommodation” Scenarios and Consequences (3 of 4) External Gateways External to the CNS/ATM provider perimeter & control Likely operated by communication service provider, like store & forward message switch, performing FANS/ATN application conversion Internal Gateways Internal to the CNS/ATM provider perimeter & control Likely operated by ATS provider, performing mainly protocol conversion Multi-Protocol CNS/ATM Host Implemented within CNS/ATM provider perimeter & control Part of ATS provider ATM host system; includes both application & communication functions; preserves end-to-end service relationships with no intermediate translation functions

24/25 September 2002ATN2002 (London)9 FANS “Accommodation” Scenarios and Consequences (4 of 4) CharacteristicExternal GatewayInternal GatewayMulti-Protocol Host Acquisition CostRelatively high per gateway (due to technical complexity and certification issues) Medium per gateway (similar to External, but with reduced technical complexity) Relatively low (integrated/optimized for host) Lifecycle CostHigh (limited control over operating costs and network tariffs) Medium to Low (better control over operating costs and network tariffs) Technical ComplexityHigh (completely generic) Medium (partly optimized for ATS center needs) Low (fully optimized for ATS center needs) PerformanceRelatively lower (due to complex functionality & sessions per aircraft) Medium (partly optimized for ATS center needs) Relatively higher (fully optimized for ATS center needs) Security IssuesSignificant (due to scope of control and technical complexity) Moderate (partly optimized for ATS center needs) Low (optimized for ATS center needs; operated by ATS authority) Liability & Certification Complexity High (due to application gateway role in end-to-end services) Medium (due to design assurance requirements) Low (based on integration with ATS host system & center) Maintains ATN Baseline 1 Service Benefits No (due to conversion of FANS to ATN application messages) Possible (depends on “application” nature, or not, of gateway) Yes (maintains separate ATN/FANS end-to-end thread)

24/25 September 2002ATN2002 (London)10 Ground Data Link Architecture Basic ATN ATN G/G BIS Local ATN G/G BIS ATN A/G BIS WAN (X.25, IP, FR, …) ATCC Local ATN G/G BIS ATCC ATN G/G BIS ATSO ATN A/G BIS ATN A/G BIS ATN ES/BIS CSP WAN (X.25, IP, FR, …) WAN (X.25, IP, FR, …)

24/25 September 2002ATN2002 (London)11 Ground Data Link Architecture General ATN Backbone Extension ATN G/G BIS ATN G/G BIS ATSO CSP ATN G/G BIS ATSO Backbone BIS Backbone BIS Backbone BIS WAN (X.25, IP, FR, …) WAN (X.25, IP, FR, …) ATN A/G BIS WAN (X.25, IP, FR, …) ATN ES/BIS To other domains… To network management systems

24/25 September 2002ATN2002 (London)12 Ground Data Link Architecture FANS Accommodation using Gateways ATN G/G BIS ATN G/G BIS ATN A/G BIS WAN ATCC ATN G/G BIS ATS WAN CSP FANS ATN GTW FANS access ACARS Network ATN G/G BIS ATCC FANS ATN GTW Internal External ATN FANS 1/A

24/25 September 2002ATN2002 (London)13 Ground Data Link Architecture Multi-Protocol Host FDPS SDPS HMI VDL 4 VDL Mode 4 Stations National Networks UAT Mode S ‘ Extended Squitter ’ Mode S Radarnet Mode S CAERAF CTS Satcom ATN ATN ES Aircraft data VDL Mode 2 Meteo Data ATIS Meteo Access VHF Satcom ACARS Networks SITA-ARINC CPDLCADS FANS-1 ATCC Access

24/25 September 2002ATN2002 (London)14 Ground Data Link Architecture ATN Design Tradeoffs ATS Service Providers o End-Systems Only o End-Systems and ATN Routers Only o End-Systems, ATN Routers and some Subnetworks o End-Systems, ATN Routers and most Subnetworks Communication Service Providers o Full ATN Internet Service o Partial ATN Internet Service &/or Subnetwork Service o Most Ground-Ground Subnetwork & Air-Ground Subnetwork Service o Some Ground-Ground Subnetwork & Air-Ground Subnetwork Service Increase capital investment Decrease ATS operating costs Increase ATS control of communications Balance between ATS providers and Communication Service providers to provide ATN service interfaces

24/25 September 2002ATN2002 (London)15 Conclusions Numerous analyses have shown that current FANS 1/A aircraft cannot be accommodated transparently in ATN Baseline 1 airspace, without loss of benefits available to ATN aircraft. However, FANS 1/A aircraft may be able to obtain benefits in mixed airspaces without comprising services to ATN aircraft, if ATS providers communicate to each aircraft type directly. This approach eliminates the viability of the “external gateway”, but can be supported by the internal gateway, if properly implemented and operated. The best ground architecture for FANS accommodation is the multi-protocol ATS host:  Since FANS and ATN aircraft can be clearly distinguished for air traffic management and communication purposes, and,  Since ATS services can be tailored to local needs.

24/25 September 2002ATN2002 (London)16