After ISS Where Do We Go From Here?. 21 August 2006P Dornan - After ISS2 Next - until the end of 2006  Produce the ISS Report - with the present team.

Slides:



Advertisements
Similar presentations
Neutrinos in CHIPP Allan Clark Neuchâtel Meeting June 2004.
Advertisements

THE FUTURE OF NELAC American Council Of Independent Laboratories.
Beyond the ALCPG David B. MacFarlane Associate Laboratory Director for PPA.
14 mars 2007M. Dracos, Neutrino Design Study1 Neutrino Oscillation Facility Design Study in FP7.
Welcome to the First Meeting of the An International Scoping Study of a Neutrino Factory & Super-beam Facility.
Costing Workshop Summary Chris Rogers, RAL, 30 Mar 2010 Establish a common framework for costing of neutrino facilities Compare Beta Beam, Super beam and.
A Possible Strategy Towards a Future Lepton Collider Tor Raubenheimer SLUO Annual Meeting September 17, 2009.
Proposal for a Constitution for MICE A Plan for Discussion P Dornan G Gregoire Y Nagashima A Sessler.
MSP course 2007 Phase 0 – Setting up Kumasi, Ghana 2008 Wageningen International.
Towards a Future Long-Baseline Neutrino Experiment Bob Wilson Colorado State University CERN Prototype/Beam Test Meeting CERN, 20 October 2014.
International collaboration in high energy physics experiments  All large high energy physics experiments today are strongly international.  A necessary.
1 Albrecht Wagner, Snowmass 0805 Albrecht Wagner DESY and Hamburg University Challenges for Realising the ILC.
HEPAP and P5 Report DIET Federation Roundtable JSPS, Washington, DC; April 29, 2015 Andrew J. Lankford HEPAP Chair University of California, Irvine.
ICFA Report to KILC12 January 2011 to April 2012 Pier Oddone – ICFA Chair Pier Oddone; 23 April 2012ICFA Report to KILC121.
BENE Meeting April 28, 2006 A. Bross US Contribution to the IDS Aka WDS BENE IDS/FP7 at RAL April 28, 2006 A. Bross.
Organizing the Linear Collider. Steps toward the ILC 1989 – 1996: Operation of the world’s only linear collider, the 90 GeV SLC at Stanford Linear Accelerator.
ISS After One Year Peter Dornan Imperial College London.
Opening Remarks: ICFA and Governments Presented at Special Evening Forum By Jonathan Dorfan.
American Neutrino Strategy: Consequences of P5 Report Jim Strait, LBNE Project Director NuFact August 2014.
Headwaters Communities in Action Building A Better Quality of Life Together.
21 August 2006P Dornan - After ISS1 Discussion  NuFact Talks Comments  Report 1 st Draft Oct – 60 Pages per WG Finalise before end of the year.
Strategy Group Preparatory Group INTRODUCTION Ken Peach 10 th October 2005.
Management subcommittee closeout Jay Marx (chair, LBNL), Joel Butler (Fermilab), Stan Wojcicki (Stanford) Thanks to all for cooperation and openness!!
Recommendations on the scientific programme The PAC endorsed the main lines of the proposed long-term programme. The draft document is expected.
RD’s Report on Detector Activity General Overview Project Advisory Sakue Yamada December 14, 2012 Sakue Yamada.
Alain Blondel NUFACT11 1 August Rhone route Shopping route Historic route count >> 30 minutes ! Boarding on ship Henri-Dunant at 19:15 CANT BE LATE.
24-Aug-11 ILCSC -Mumbai Global Design Effort 1 ILC: Future after 2012 preserving GDE assets post-TDR pre-construction program.
CARE Steering Committee and Dissemination Board R. Aleksan CARE Steering Committee Paris, April 11, Introduction.
World Wide Study of Physics and Detectors for a future e + e - Linear Collider David J. Miller; towards a WWS response to ILCSC/ICFA How do we propose.
WG3 – Part 3 - Design Studies Introduction Introduction View from Europe - RE View from Europe - RE “ “ Japan- Yoshi Kuno “ “ Japan- Yoshi Kuno “ “ US-
Report from ILCSC Shin-ichi Kurokawa KEK ILCSC Chair GDE meeting at Frascati December 7, 2005.
Geospatial LoB: Lifecycle WG Update November 3, 2009.
The ISS Peter Dornan Imperial College London. 16 March 2006P Dornan - MUTAC `atmospheric’`solar’ `cross/reactor’ Oscillation defined by 3 mixing.
John Womersley Welcome Director of Particle Physics, CCLRC International Scoping Study Meeting, RAL April 2006.
1 GUTs and Branes DESY Theory Workshop 2003 A brief introduction to the future of particle physics at DESY Albrecht Wagner Hamburg, 23 September 2003.
WWSWWS Report of the World Wide Study J. Brau June 4, 2008 Dubna ILCSC Meeting.
Physics and Performance Evaluation Group NuFact 07 Okayama University, Japan August 6, 2007 Walter Winter Universität Würzburg for the executive committee:
CLIC Workshop, CERN 1 CLIC/ILC Collaboration Report: Marc Ross (Fermilab); for Nick Walker, Akira Yamamoto Project Managers International Linear.
27 Apr 2006P J Dornan - ISS3 - RAL Next Meeting 4 th ISS Plenary –Irvine Aug21, 22 (NUFACT06 Aug 24 – 30) Workshops –Physics Group, June, Valencia –Machine.
Alain Blondel -- After the ISS -- What did ISS achieve? 1. Established a « baseline » for the accelerator study 2. Rejuvenated simulation and study of.
9/17/041 The International Linear Collider Michael Witherell Presentation to The Funding Agencies for a Linear Collider September 17, 2004.
Department of Energy Office of Science  FY 2007 Request for Office of Science is 14% above FY 2006 Appropriation  FY 2007 Request for HEP is 8% above.
ILD SiD CALI CE LC- TPC FCAL R&D group (ILC) group (ILC) “collab” (CLIC)  host lab “collab” (LC) “collab” (LC) “collab” (LC) R&D groups involved in “world-wide.
ESPON Info Day on New Calls and Partner Café 18 May 2010 in Bruxelles Call for Proposals on Transnational Networking Activities (Projects carried through.
1 Future Circular Collider Study Preparatory Collaboration Board Meeting September 2014 R-D Heuer Global Future Circular Collider (FCC) Study Goals and.
( name in progress) Kick-Off meeting August 28, 2013 Markus Nordberg Marzio Nessi Chris Thomas Harri Toivonen Tuuli Utriainen Introduction:
Management February 20, Annual Review of the Muon Accelerator Program (MAP) Subcommittee members: Ron Prwivo, Ron Lutha, and Jim Kerby.
Americas comments on Linear Collider organization after 2012 P. Grannis, for LCSGA – Aug. 24, 2011 ILCSC GDE.
ILC 2007 Global Design Effort 1 Planning Damping Rings Activities in the Engineering Design Phase Andy Wolski Cockcroft Institute/University of Liverpool.
ICFA Report to New Frontiers in Physics January 2011 to April 2012 Pier Oddone – ICFA Chair Pier Oddone; June 15, 2012New Frontiers in Physics1.
EU accelerator contributions to the IDS … R. Garoby ISS meeting RAL 28/04/2006.
Eric Prebys, Fermilab Program Director, LARP July 10, 2012.
ATLAS Forward Project (AFP) Technical review outcome Review done on (morning) September 2013, see agenda
1 Comments concerning DESY and TESLA Albrecht Wagner Comments for the 5th meeting of the ITRP at Caltech 28 June 2004 DESY and the LC What could DESY contribute.
Muon Collaboration Meeting Steve Geer MUTAC Review, Jan, 2003 Muon Collaboration WELCOME.
Memorandum of Cooperation for the CLIC detector and physics study Lucie Linssen Monthly meeting 19/11/
DUNE-UK Mark Thomson University of Cambridge DUNE-UK Meeting, UCL May 15, 2015.
TIARA-PP Governing Council 1 representative per contractor TIARA-PP Coordinator Industry advisory committee? Project Management (WP1) Project Office Dissemination.
ARIES WP2 Task 2.2 kick-off Coordination, support and enhancement of communication/outreach activities for accelerators in Europe Jennifer Toes (CERN),
Itzhak Tserruya Weizmann Institute of Science
Updating the Regulation for the JINR Programme Advisory Committees
Accelerator R&D for Future Neutrino Projects
The Way Forward ISS to IDS
ICFA Report to ICHEP 2016 August 2015 to August 2016 J. Mnich (DESY)
European Detector R&D: AIDA
Process of the 2nd update of the European Strategy for Particle Physics FCC week, 29 May 2017, Berlin Sijbrand de Jong, President of the CERN Council (slides.
The DBD: Outline and Scope
Report from ICFA ICFA mission and membership ICFA Panels ICFA and ILC
Snowmass on the Mississippi
V SuperB Workshop ENS May 9-11, 2007
Presentation transcript:

After ISS Where Do We Go From Here?

21 August 2006P Dornan - After ISS2 Next - until the end of 2006  Produce the ISS Report - with the present team & structure A Good Report is Vital  it will provide the basis of bids for R&D funding for the next stage, assuming there is a community to support it  Devise a New Effort to carry the Work Forward But what is the best way?

21 August 2006P Dornan - After ISS3 The ISS Report for the Neutrino Factory  It must address Ourselves  We have to be convinced it is viable and will produce good physics The wider community  Main problem here is probably timescale The wider particle physics community  Many in he LHC – ILC communities consider - oscillation is just a blip on the SM and that ‘serious’ BSM physics will only come from the quark sector The funding agencies  Requires pressure from the PP community The Labs  -factory has to be in possible future plans

21 August 2006P Dornan - After ISS4 Structure for a Continuation Must be established during the fall  What form should it take?  How to do it?  Who can do it? Here are some thoughts  From the ISS - PC and the original ‘Wise Men’  for discussion this week

21 August 2006P Dornan - After ISS5 Goal - An Advanced Neutrino Facility - for data taking before  To choose The facility to produce the very best physics return  But maybe too expensive The facility giving max physics/$  Weighting physics return is subjective Need a compromise & probably more information e.g. size of  13 So cannot make such a judgment today  But equally cannot keep postponing it

21 August 2006P Dornan - After ISS6 What would it be?  Neutrino Factory   -Beam Facility  High power Superbeam and very large detector Possibly two of these - but not three Future - how to proceed?  Single Study embracing all three?  Three independent studies? -assuming all three communities believe it necessary  Three quasi-independent studies but with coordination where practicable and an overall oversight body.

21 August 2006P Dornan - After ISS7 Why An Independent -Fact Study? The synergies with the others are not great Accelerator  After p-driver and target - little in common Detector  For -fact – high energy  magnetised  For Superbeam - low energy  non-magnetised, very large  For  -beam, non-magntised Physics  This is in common, provides the overall motivation and is one of the critical discriminators

21 August 2006P Dornan - After ISS8 Neutrino Facility Oversight Committee accelerator detector physics accelerator detector physics accelerator detector physics -Factory  -Beam Superbeam

21 August 2006P Dornan - After ISS9 The Oversight Body International cooperation for a future advanced neutrino facility has been strongly advocated by  EPP2010  CERN Council Strategy Document The four ISS ‘Wise Men’, Steve Geer, Yoshi Kuno,Vittorio Palladino, Ken Peach, have drafted a letter to go to all relevant accelerator lab directors asking them to facilitate coordinated R&D in the neutrino area and establish an ‘International Neutrino Facility Oversight Committee’ (INFOC)  With copies to spokespeople of all major current neutrino experiments  Aim to finalise the draft this week

21 August 2006P Dornan - After ISS10 INFOC Representatives of the Labs  And funding agencies? The Individual Neutrino collaborations would report to INFOC Would recommend support, funding, engineering for the projects Monitor Progress It ultimately would decide on the form of the future neutrino facility

21 August 2006P Dornan - After ISS11 The Neutrino Factory Collaboration For the Neutrino Factory area there would be an International Neutrino Factory Collaboration (INuFC)  Would focus purely on the -fact approach to a future -facility  It would have a structure similar to the ISS Accelerator group Detector Group Physics Group

21 August 2006P Dornan - After ISS12 INuFC - Aim To produce by ~2010 an interim report outlining  A -factory solution for a -facility which could produce data before 2020 Dependent on a successful outcome of R&D underway, e.g. MICE and other R&D following the ISS Dependent on the value of  13 Approximate costs Site Considerations  Make it possible (with resources) to produce a CDR for a n-fact by ~2012, a TDR by ~2014 and data by 2020

21 August 2006P Dornan - After ISS13 Ambitious Plan  But it is necessary - in order to Engage accelerator scientists, engineers, the - physics community  A device for ~2030 has little attraction at the present time Have an international -factory on the particle physic roadmap  And encourage the major labs/regions to include it on their roadmap  And for one of them to ‘host’ the effort Ensure adequate (substantial) resources for the CDR

21 August 2006P Dornan - After ISS14 INuFC - Questions  Structure Like ISS - 3 WG’s and a PC of WG leaders and an overall coordinator? Like a PP experiment - a wide steering group? How are people chosen?  Mandate Period of 3 years, 2007 – 2010 Indefinite  Until -fact is built or funding ceases  These - and many other questions - will need to be established at a meeting around the start of 2007 to coincide with the ISS report

21 August 2006P Dornan - After ISS15 INuFC - Needs - Goals Get Resources  Use ISS report for bids to labs, funding agencies, EU etc.  Persuade a lab (or group of labs) to ‘host’ the study and provide some engineering support  Embark upon the R&D recommended for by the ISS report  Continue the unfinished work of the ISS  Convince the wider -community that this is in the best interests of neutrino physics Get People  Need more physicists & engineers for whom this is their major activity Many in the ISS had very limited time Need committed young people.

21 August 2006P Dornan - After ISS16 Discussion  These are all suggestions  They need to be discussed Starting now Continuing in the corridors - and again tomorrow afternoon.  It is important to have a plan with substantial support from the ISS for the NuFact discussion on the last day.