mydocs-presentations-2011PAPAMWF-EricaRevisions

Slides:



Advertisements
Similar presentations
County of Fairfax, Virginia Department of Transportation 1 Transportation Funding and Improving Roadway Services Delivery Transportation Advisory Commission.
Advertisements

Some things cant wait for traffic Capital Beltway HOT Lanes Project New Travel Choices Ahead.
Executive Summary Introduction In 1988, by virtue of State Statute , the Nebraska State Legislature first assigned the Nebraska Department.
Managing a Statewide Network An overview of the CDOT Pavement Management Program Eric Chavez Stephen Henry
Statewide Traffic Engineers Meeting Rumble Strip(e) June 16, 2011 Simone Ardoin Assistant Road Design Engineer Administrator.
Concrete Specification and Roadway Standard Revisions Bill Miller, PE Bureau of Construction and Materials Mark Burkhead, PE Bureau.
Alternate Bidding: The West Virginia Experience 2011Virginia Concrete Conference March 3, 2011 Richmond, VA Bob Long Executive Director ACPA Mid-Atlantic.
October 9, 2014 Glenn's Bay Road Widening and Interchange Project.
Created by: Victor Lund, PEKen Johnson, PE, PTOE St. Louis CountyMnDOT.
Presented at: Rutgers Asphalt Paving Conference March 8, 2011 Presented by: Eileen Sheehy, P.E. Manager, Bureau of Materials NJDOT.
ALLEGAN COUNTY PRIMARY ROAD MILLAGE AREA 2 JANUARY 21, 2014.
City of Auburn Hills Road Asset Management Program February 21, 2014 SEMCOG University.
Specification Changes Pub 408/2011 Changes 1 & 2 District 8-0 Winter Construction School February 23rd, 2012 Linda Atkinson Bureau.
Dillon and Christina Project Area Lander Streets and Utilities 2015 Public Meeting No. 2.
With the Genesee County Road Commission By Fred Peivandi, P.E. And Ken Johnson, P.E. Local Road Funding.
To Pave or Not to Pave? Making Informed Decisions on When to Upgrade a Gravel Road.
Senate Committee on Transportation, Technology and Legislative Affairs House Committee on Public Transportation Thursday, July 18, 2013.
County of Fairfax, Virginia Sully District Council Meeting November 19, 2014.
TEXAS TRANSPORTATION August 2012 The Honorable Larry Phillips Chairman, House Committee on Transportation.
Construction Industry Advancement Program William Wilson P.E., Supervising Engineer, Structures New Jersey Turnpike Authority Working with New Jersey Turnpike.
Concrete Paving: Opportunities for Virginia Robert R. Long, Jr. Executive Director American Concrete Pavement Association Mid-Atlantic Chapter October.
Construction Industry Advancement Program John T. Withers, P.E.,P.P. Supervising Engineer, Highways/Buildings - Design New Jersey Turnpike Authority Working.
Alternate Bidding in Missouri Transportation Estimators Association Annual Conference November 2-4, 2005 – Daytona Beach, FL Interstate 44 … South-Central.
1 Paula J. Trigg, County Engineer Public Works and Transportation Committee June 25, 2014 PROGRAM RECAP AND ENDORSEMENT REQUEST PROPOSED HIGHWAY.
Dulles Corridor Metrorail Project 23-mile new Metrorail line branching off the Orange Line after East Falls Church 11 new stations 5 in Phase 1: East Falls.
Corridor #5 Update United States Senate Briefing September 26, 2007.
Economic Stimulus Information Meeting March 17, 2009 Florida Department of Transportation Florida’s Turnpike Enterprise.
2012 Shift Change Schedules REVISED for new contract language.
December 12, 2013 Glenn's Bay Road Widening and Interchange Project.
Project Management Richard Ravin NAU MBA Agenda  Background  Current Position Home Building Business  Project Management vs. Program Management.
Public Information Meeting Rehabilitation of Bridge No Flat Rock Hill Road over I-95 Old Lyme, Connecticut Rehabilitation of Bridge No Flat.
New Mississippi River Bridge EWGCOG Presentation New Mississippi River Bridge EWGCOG Presentation January 8, 2007.
Less Stop More Go EXPRESS LANES Travel Choices and Strategies to Relieve Congestion Presentation to FDOT’s Annual ITS Working Group Meeting March 2008.
Juva Barber Executive Director. What is KBT? Kentuckians for Better Transportation educates and advocates for all modes of transportation to promote a.
Pavement Preservation Protecting the Investment and the Environment R. Gary Hicks CP2 Center, Chico, CA Prepared for CEAC 2014 Conference March 26-28,
Presented to: Presented by: Transportation leadership you can trust. FTC Expressway Authority Cost Savings Study Florida Transportation Commission Expressway.
Bridge Building Timelines Presented by The Richland County Engineers Office Thomas E. Beck, PE, PS 77 North Mulberry Street Mansfield, Ohio Jan.
ACEC Joint Conference on Regional and National Economy Trends & Opportunities June 14, 2012 William C. Cuttler, P.E. Assistant District Administrator -
The Regional Forum for Transportation Planning. Southwestern Pennsylvania 10 Counties >7,000 square miles 2.66 million citizens 548 municipalities 132.
RALPH COMER TENNESSEE DEPARTMENT of TRANSPORTATION January 19, 2010 THE ASSOCIATION OF GOVERNMENT ACCOUNTANTS TDOT's Approach to Economic Stimulus Funding:
WVDOH Experience... thus far.  Public-Private Partnerships = PPP=3P = P3 ... Most folks in industry refer to them as P3, so that’s what I go with.
Tolling and Pricing Opportunities Under the Federal-aid Highway Program January 2006.
Paving for Progress Aaron D. Granquist, Project Manager, HR Green, Inc. Doug Wilson, Capital Improvement Project Manager, Cedar Rapids Handouts and presentations.
Session 2 Introduction to Pavement Preventive Maintenance Concepts.
Fueling Transportation in Pennsylvania Frank Kempf, Chief Engineer Joe Brimmeier, CEO.
PennDOT’s 2010 Program Rebecca S. Burns, P.E. Acting Director Bureau of Construction and Materials 11 th Annual Pennsylvania Concrete.
HBP Warranties – The Cost Benefit Evaluation Begins By: Jay Goldbaum, P.E. Colorado Department of Transportation Pavement Management and Design Program.
FD05 STATEWIDE RESURFACING PROGRAM OVERVIEW DIANA RADCLIFFE, TEBM, ROADWAY PRESERVATION, DIV OF MAINTENANCE.
2003 Warranty Presentations Caltrans WARRANTED HMA PAVEMENTS PAVEMENTS.
1 MnDOT Metro District Proposed Transportation Improvement Program (TIP) Amendment Metropolitan Council January 17, 2007.
Justin Hardee, P.E. Lee County Engineer.  ALDOT Policy  Construction Process  Status  Lee County’s Bridge Inventory  2010 Bond Issuance for Bridges.
Madison Avenue Reconstruction Department of Planning and Development.
Metro Highway Program Presentation to CMAA Abdollah Ansari
New Jersey Turnpike Authority November 19, 2009 New Jersey Turnpike Interchange 6 to 9 Widening Program Presented by Lisa M. Kenney, P.E. 1.
Program Manager Administrator
Table Discussions 2015 SE Meeting. Scenario #1-Project Completion A $1 million bridge replacement project has a completion date of August 1 th. This date.
U.S. ROUTE 202 – SECTION 300 IMPROVEMENT PROJECT East Whiteland Township – Tredyffrin Township Chester County TMACC Information Session January 24, 2011.
Pavement Preservation Program Emily McGraw, PE February 23 and 24, 2015 – NCDOT & CAPA Workshop.
Garden State Parkway HOT Lanes By Matt Lawson October 14, 2010.
PRESENTED AND PREPARED BY CITY OF MISSOULA PUBLIC WORKS DEPARTMENT.
ORDINANCE # Authorizing $372,760 for traffic signal interconnect at 47 th Street and Emanuel Cleaver II Boulevard Start of project End of project.
State Legislative Update and Local Projects Overview Collin County Day March 27, 2012 The Honorable Larry Phillips Chairman, House Committee on Transportation.
Micro-milling The Economics A Rehabilitative Strategy for Savings Presented By: Sheila Hines Georgia Department of Transportation.
Interstate 15 North 4/09/2015 Update
Florida Transportation Commission FY 2009
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
SR422 Section 29M, Berks Co. West Shore Bypass Reconstruction
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
Major Initiatives in Hampton Roads
Presentation transcript:

mydocs-presentations-2011PAPAMWF-EricaRevisions 4/14/2017 10:53 PM PA TURNPIKE Thanks Gary / PAPA

ACT 89 the PTC’s annual payments to PennDOT will remain at $450 million for the next eight years — through June of 2022.  But, starting in fiscal year (FY) 2023, the payments drop sharply to $50 million per year until the Act 44 agreement ends in FY 2057.  The Turnpike’s contribution will be shifted entirely to the support of public transportation.

the law will provide additional funding from the Commonwealth, through the Oil Company Franchise Tax.   This additional revenue stream is expected to continue to grow annually, reaching an estimated $87 million per year by year five. The funding would be sufficient to complete the Southern Beltway segment between U.S. Route 22 and Interstate 79 and also can be used for work on the remaining portions of the Southern Beltway & the Mon-Fayette Expressway and additional slip ramps.

The Act requires additional consideration be given to utilization of small and diverse business enterprises Raise speed limit to 70 MPH where appropriate

Did not include enforcement language for AET that would ensure timely payment of tolls by providing penalties for unpaid toll violations and by punishing those who deliberately seek to evade tolls.  The provisions, which would have led to suspension of a vehicle’s registration upon a preset number of toll violations and language that would have provided greater clarity on the issue of video tolling.

AET IMPLEMENTATION Extend to a 8 year implementation Pilot Design & Deployment I-95 (in progress) Findlay Connector (I-576)

mydocs-presentations-2011PAPAMWF-EricaRevisions FY 14 Ten-Year Highway Capital Plan 4/14/2017 10:53 PM By Category (millions) PTC Engineering Major Initiatives Total Reconstruction Projects Major Bridges Roadway Resurfacing Structurally Deficient Bridges Tunnel Upgrades I-95/Turnpike Interchange ITS Projects All Electronic Tolling Total $5.6 billion

mydocs-presentations-2011PAPAMWF-EricaRevisions FY 2014 Ten-Year Capital Plan 4/14/2017 10:53 PM mydocs-presentations-2011PAPAMWF-EricaRevisions

Construction Monthly Cash Draw Downs AREAS of FOCUS Construction Monthly Cash Draw Downs Construction Schedule –Completion Date

Roadway Projects for 2014 1ST Quarter MP 99 – 102 ROADWAY RECONSTRUCTION Bit. Overlay 138 - 142 Bit. Overlay 145.51 – Bedford Interchange MP A26 – A31 ROADWAY AND BRIDGE RECONSTRUCTION Bit. Overlay A31 – A40 Bit. Overlay A69 – A74 Bit. Overlay A114.45 – Wyoming Valley Interchange SYSTEMWIDE ROADWAY REPAIRS (6 CONTRACTS) 2nd Quarter MP 44 – 48 ROADWAY AND BRIDGE RECONSTRUCTION Bit. Overlay 90.7 – Donegal Interchange Bit. Overlay 188.59 – Willow Hill Interchange I-95 SECTION D-10 1st Q: 20 miles overlay, mill/pave 2014 *Bit. Overlay 138 – 142 F/D job 4 miles long *Bit. Overlay 145.51 I/C Ramps Partial F/D *Bit. Overlay A31 – A40 *Bit. Overlay A69 – A74 *Bit. Overlay A114.45 I/C Ramps 8 miles of Total Reconstruction work 2014 Roadway OE’s = ~$10.0 M 6 Open end roadway bid in January (3 each time) 2nd Q: 2 I/C ramp jobs; west @Donegal I/C & Central at Willow Hill 4 miles of Total Reconstruction work I-95 Section D-10 Bituminous

mydocs-presentations-2011PAPAMWF-EricaRevisions 4/14/2017 10:53 PM Roadway Projects for 2014 3rd Quarter MP 220 – 227 ROADWAY & BRIDGE RECONSTRUCTION MP 242 – 245 ROADWAY & BRIDGE RECONSTRUCTION 4TH Quarter 2014 (2015 Construction season) Bit. Overlay 161 - 166 MP 202 – 206 ROADWAY & BRIDGE RECONSTRUCTION Bit. Overlay A40 – A49 Bit. Overlay A108 – A115 3rd Q 2014: 10 Miles of Total Reconstruction 4th Q 2014: MP 161-166 A40-A49 A108-A115 21 miles of paving operations coming out in 4th Quarter 4 miles of Total Reconstruction in 4th Quarter

2014 Roadway Projects 51 miles of mill/pave/overlay work 33 miles - Bid 4th Quarter 2013 18 miles - Bid 1st Quarter 2014 - Bid 2nd Quarter 2014 (Interchanges) 21 miles - Bid 4th Quarter 2014 (2015 season) Total Reconstruction – 22 miles 8 miles - Bid 1st Quarter 2014 4 miles - Bid 2nd Quarter 2014 10 miles - Bid 3rd Quarter 2014 4 miles - Bid 4th Quarter 2014 (2015 season) 4Q 2013 33 miles 1Q 2014 20 miles 2Q 2014 2 miles 4Q 2014 21 miles (2015 season) = 55 miles of mill/pave type of work for 2014. Total Reconstruction 22 miles to be bid (4th Q – 206-210) Continuation of 6 miles (A20-A26 ………199-202 complete)

mydocs-presentations-2011PAPAMWF-EricaRevisions 4/14/2017 10:53 PM New HMA projects constructed in 2014 will use the PTC’s new CS Section 409 that includes new Lot and Sublot criteria. BITUMINOUS TOTAL: 2009 = 853K tons 2010 = 880K tons 2011 = 539K TONS 2012= 980K TONS 2013 = 419K TONS 2012 lane miles paved = 273 2013 lane miles estimated = 266 2011 IRI = 55” per mile – for the mill/pave projects 2012 IRA = 238.40  lane miles- average IRI = 51.04.

mydocs-presentations-2011PAPAMWF-EricaRevisions 4/14/2017 10:53 PM Roadway loose samples and cores obtained from each Sublot will be tested. Sublot results will be averaged and used as Acceptance and payment criteria. Table I was also modified for payment factors. BITUMINOUS TOTAL: 2009 = 853K tons 2010 = 880K tons 2011 = 539K TONS 2012= 980K TONS 2013 = estimated 2012 lane miles paved = 273 2013 lane miles estimated = 266 2011 IRI = 55” per mile – for the mill/pave projects 2012 IRA = 238.40  lane miles- average IRI = 51.04.

Requires all completed wearing surface longitudinal and transverse joints to be sealed with a rubberize joint sealing material in accordance with Section 705.4(c)

mydocs-presentations-2011PAPAMWF-EricaRevisions 4/14/2017 10:53 PM The PAPA website contains the Pa. Turnpike HMA Software for 2014. The HMA Design Software and  2014 Bit-DEL program are available . Any questions can be directed to Terry Dreher in our Materials Dept. BITUMINOUS TOTAL: 2009 = 853K tons 2010 = 880K tons 2011 = 539K TONS 2012= 980K TONS 2013 = estimated 2012 lane miles paved = 273 2013 lane miles estimated = 266 2011 IRI = 55” per mile – for the mill/pave projects 2012 IRA = 238.40  lane miles- average IRI = 51.04.

2013 IRI RESULTS Paved 53 miles and 212 lane miles with an overall IRI average of 56.13

2013 Projects A-059 Project IRI 60 A-095 Project IRI 48 T-345 Project   IRI 51 T-263  Project  IRI 47 T-236  Project  IRI 58 T-199  Project  IRI 63 T-142  Project  IRI 55 T-122 Project   IRI 67

mydocs-presentations-2011PAPAMWF-EricaRevisions 4/14/2017 10:53 PM BITUMINOUS TOTALS: 2009 = 853 K tons 2010 = 880 K tons 2011 = 539 K tons 2012 = 980 K tons 2013 = 419 K tons BITUMINOUS TOTAL: 2009 = 853K tons 2010 = 880K tons 2011 = 539K TONS 2012= 980K TONS 2013 = estimated 2012 lane miles paved = 273 2013 lane miles estimated = 266 2011 IRI = 55” per mile – for the mill/pave projects 2012 IRA = 238.40  lane miles- average IRI = 51.04.

Construction Projects Currently 67 active construction projects at a total construction value of over $ 721 million Another 41 projects to be bid through December 2014 at a total construction value of over $ 958 million

mydocs-presentations-2011PAPAMWF-EricaRevisions 4/14/2017 10:53 PM Construction Projects Currently In Construction Roadway Resurfacings Bridge Replacements/Rehabs Other Miscellaneous Projects Total Reconstruction Projects Currently have planned 41 projects to be bid in Fiscal Year 2014 at a total construction value of over $958 Million

mydocs-presentations-2011PAPAMWF-EricaRevisions 4/14/2017 10:53 PM Total Reconstruction Averaging 7 miles of reconstruction per year with the ‘Base Plan’ Increases to 13 miles per year with the ‘Enhanced Plan’ 65 miles in design with the ‘Base Plan’ Additional 50 miles with the ‘Enhanced Plan’ Average construction cost/mile is $15-30 million

mydocs-presentations-2011PAPAMWF-EricaRevisions Stage 1 Construction 4/14/2017 10:53 PM While Widening to the Outside Keep Traffic in Existing Lanes FORMER - 3 STAGE NOW/FUTURE - 2 STAGE Averaging 7 miles of reconstruction per year with the ‘Base Plan’ Increases to 13 miles per year with the ‘Enhanced Plan’ 65 miles in design with the ‘Base Plan’ Additional 50 miles with the ‘Enhanced Plan’ Average construction cost/mile is $15-30 million

mydocs-presentations-2011PAPAMWF-EricaRevisions Stage 2 Construction 4/14/2017 10:53 PM Reconstruct Original Roadway

mydocs-presentations-2011PAPAMWF-EricaRevisions Completed Construction 4/14/2017 10:53 PM Typical Total Reconstruction Section 122 ft. Out-to-Out SAFETY - 10’ WIDE MEDIAN TO 26’ WIDE MEDIAN….. CAPACITY/MAINTENANCE – 2 LANES TO 3 LANES…..

Total Reconstruction Projects Status as of November 2013 Completed - 102 miles Under Construction - 8 miles In Design - 135 miles Avg. 13 miles/year at a construction cost of $15-$30 million per mile

Mon/Fayette Southern Beltway This slide would be used as an overview for all seven Mon/Fayette and Southern Beltway projects underway. Once all the projects are complete, 95 miles of new limited-access highways will exist south and west of Pittsburgh in Allegheny, Washington and Fayette Counties. US 22 to I-79 $659 M 12 Miles Preliminary Design Phase ROD in 2008

Southern Beltway US 22 to I-79 Currently Dual Bridges over US 22 - Starting Construction First Roadway Contract from MP S6 – S9 anticipated to begin March 2016 Anticipated 5 Major Roadway Contracts Construction timeframe now to late 2019.

mydocs-presentations-2011PAPAMWF-EricaRevisions 4/14/2017 10:53 PM Turnpike/I-95 Interchange

mydocs-presentations-2011PAPAMWF-EricaRevisions 4/14/2017 10:53 PM I-95 / I-195 Redesignation

mydocs-presentations-2011PAPAMWF-EricaRevisions 4/14/2017 10:53 PM I-95 Interchange Schematic Stage 1 - $424 million Stage 2 - $500 million Complete remainder of interchange and roadway widening Stage 3 - $425 million Construct new river bridge and rehabilitate existing river bridge Total - $1.4 billion Start Year Construction Section Estimated Cost 2010 S1 (Galloway & BOV Bridges) $ 9.7 million 2012 Advanced ITS $ 3.6 million 2012 Ford Ave. Bridge on I-95 $ 4.0 million 2012 S2 (Richlieu Road Bridge) $ 7.0 million 2012 Wetland/Stream Mitigation $ 1.7 million 2013 B (includes ORT @ DRB) $ 76.0 million 2014 / 17 D1 (includes I-95-E) $150.0 million 2015 / 17 D2 (includes I-95-F) $130.0 million 2013 / 17 Mainline ITS (Multiple) $ 13.0 million

Contract D-10 will be Bid Thru ECMS BID DATE – 6-5-14 Contract D-20 will also be Bid Thru ECMS in 2015

mydocs-presentations-2011PAPAMWF-EricaRevisions 4/14/2017 10:53 PM Roadway Resurfacing

mydocs-presentations-2011PAPAMWF-EricaRevisions 4/14/2017 10:53 PM SMA   PTC be using a 9.5mm SMA for the first time at Milepost T-275 to 282.04 Hempt Bros was awarded the contract. SMA Material and Paving will be provided by the H&K group. (Silver Hill  Quarry and Reading Site Contractors) BITUMINOUS TOTAL: 2009 = 853K tons 2010 = 880K tons 2011 = 539K TONS 2012= 980K TONS 2013 = estimated 2012 lane miles paved = 273 2013 lane miles estimated = 266 2011 IRI = 55” per mile – for the mill/pave projects 2012 IRA = 238.40  lane miles- average IRI = 51.04.

Preparation of Existing Milled Surface mydocs-presentations-2011PAPAMWF-EricaRevisions 4/14/2017 10:53 PM Preparation of Existing Milled Surface Preparation of Existing Milled Surface Prepare surface as per Commission Specification Section CS Section 409.3 (g) - Preparation of Existing Surface. “Remove and dispose of unsuitable material from the surface of existing pavement.” MILL & PAVE DOWN TO OLD CONCRETE VARIABLLE DEPTHS – 4” TO 8.5” JOINT REPAIRS NEEDED WE HAVE JOINTS THAT NEED ATTENTION WHEN GOING DOWN TO THE ORIGINAL CONCRETE PAVEMENT.

Applies to both milling bituminous surfaces and milling to concrete Prepare surface as per Commission Specification Section 409.3(g).

QUESTIONS?