M. Gilchriese SQP Clearance June 8, 2006. M. Gilchriese 2 Overview A1-2 inners have been mounted on backbone An A1-2 outer has been mounted on the backbone.

Slides:



Advertisements
Similar presentations
CHAPTER (6) Drilling Dr. Ahmed Abou El-Wafa.
Advertisements

S2 INVENTOR GAME BOY part one MAIN BODY. S2 INVENTOR Here is what the finished result might look like once put together...
2x2 module & stave layouts. 2 options “Small chip” “Big chip” Boundary between “small” and “big” is determined by the 6” sensor wafer layout that must.
Frame Assembly Produced by Ed Latimer, Team 476 Ken York, Team 476 Ron Markum, Team
ATLAS Pixel Detector BCM Signal Cable October 13, 2005 E. Anderssen, LBNL.
CONSTRUCTION OF A “LITTLE FREE LIBRARY” Gary Mehlum, pressed into service by wife and UHLS employee Mary Fellows (“When you marry a librarian, you marry.
Gripper Designs By Pragnay Choksi. INTRODUCTION Hands of robots referred to as Grippers No single design is ideal for all applications.
Design Dimensioning and Tolerancing J. M. McCarthy Fall 2003  Overview of dimensions  Dimensioning various features  Limits of size  Classes of fits.
ATLAS Pixel Detector February 2003 N. Hartman LBNL 1 Pixel Support Tube PRR: Assembly, Production, Schedule February 2003.
2- Crankshaft, Piston Pin, and Piston Rod Bushing.
Status Update on Mechanical Prototype in Rome November 6,
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
Polishing the Ferrules Howard Budd Sep Polishing Epoxy on the Ferrule We glued fibers in the 10 ferrules that Dave Warner gave us One problem.
Drafting Rear Elevations. Start with outer frame when drafting standard flat. Heights are generally in multiples of 2’-0”. Outer Frame.
Outer Stave Prototype Update E. Anderssen, M. Cepeda, M. Garcia-Sciveres, M. Gilchriese, N. Hartman, J. Silber LBNL W. Miller, W. Shih Allcomp, Inc ATLAS.
IBL Mock Up IBL Mock Up MANUFACTURING 2011/04/29 François-Xavier NUIRY Maxence CURDY Andrea CATINACCIO CERN PH/DT/PO 1.
ATLAS Pixel Detector July 2003 ETC ‘04 E. Anderssen LBNL BPSS and Service Panels Santa Cruz, CA E Anderssen LBNL.
Carbon-Epoxy Composite Base Plates for the PHOBOS Spectrometer Arms J.Michalowski, M.Stodulski The H.Niewodniczanski Institute of Nuclear Physics, Krakow.
J-FRM-0101 Revision with Reason No.DateInitials Drawing No. D’Vinyl Inc. Descriptive Part Name Designed byChecked by Engineer Drawing Type Foot Plate Date.
M. Gilchriese Status Report Sectors, Rings, Frame December 2002.
Wood Construction Materials Hardwood Comes from deciduous trees such as oak, birch, walnut, maple, and hickory.
NCSX Vacuum Vessel Joint Design Mike Viola PPPL July 1 st, 2003.
SLHC Pixel Layout Studies S. Dardin, M. Garcia-Sciveres, M. Gilchriese, N. Hartman LBNL November 4, 2008.
Ron Madaras, LBL U.S. Pixel Meeting, SCIPP, July 9-10, 2003 Patch Panel 1 (PP1) Brief Review Cost and Effort Estimate.
ATLAS Pixel Detector March 2004 Video Conference E. Anderssen LBNL PP1 Opto Connector and Fiber Routing Updated with notes from 23-March Meeting E. Anderssen,
1 Jim Thomas - LBL New Pad Plane Design Proposal & Specifications Jim Thomas, John Hammond, Bob Scheetz, Jon Wirth, etc., etc., and a cast of thousands.
ATLAS Pixel Detector Service Quarter Panel Update And PP1 Work July 4, 2006 Pixel Integration Meeting M Cepeda, S Dardin, K Kennedy, R Post, M Pereira,
M. Gilchriese - November 12, 1998 Status Report on Outer Support Frame W. Miller Hytec, Inc E. Anderssen, D. Bintinger, M. Gilchriese LBNL.
09/03/2010 ADO-PO section meeting Beam Pipe Extraction/Insertion R. Vuillermet.
ACFA-7; Taipei, Nov 2004 H.Weerts status Si licon D etector Status H.Weerts Fermilab/Michigan State Univ. (Progress on Si-tracker layout)
NSQP X-1 ASSEMBLY Lessons learned Sébastien MICHAL January 30 rd 2012.
1 1. EMR production status 2. EMR simulations (FEA studies) 3. RAL 1. EMR production status 2. EMR simulations (FEA studies) 3. RAL Teleconf.
Hand Crosscheck HSLM1. Position of REF DCOPS CENTER MAB Target DM distance DMdowel to DCOPS dowel DCOPS dowel to center.
Manufacturing the Base Plate #2. Contents of this presentation are for the machinist to view the best method of producing this foundational part to the.
Copyright  2012 McGraw-Hill Australia Pty Ltd PPTs t/a Engineering Drawing 8e by Boundy 2-1 Chapter Two Dimensioning Drawings: Symbols, Methods, Common.
1 Manufacturing Projects Flexible Manufacturing Copyright © Texas Education Agency, All rights reserved.
………..Continued - Parts of Radial Drilling Machine -Functions
Stave C channel side closeout gluing jig S Yang WP4 monthly meeting at Liverpool University 26 th March 2014.
Side view of generator. Close up of unused grounding pad - gives provisions for mounting the absorber.
M. Gilchriese Items from Talks U.S. Pixel Meeting Santa Cruz July 2003.
1 PST Heaters 4 panels per segment along pixel support tube. Each segment is 236mm long at the moment. Copper-on-kapton. Nominal 20 ohms per full panel.
1 Jim Thomas - LBL Sector Tools – a conversation with Jon Wirth and Eric Anderssen August 28 th, 2015.
M. Gilchriese Disk Sector Status E. Anderssen, M. Gilchriese, F. Goozen, N. Hartman, T. Johnson, J. Wirth October 11, 2001.
R. Bradford 10 December, 2014 Sensor Details. Explanation Submitted some designs that will be included on the Novati/Tezzaron submission. Designs based.
M. Gilchriese - September 2000 Pixel Insertable Layouts September 2000.
Drilling machine. Introduction Drilling is a metal cutting process carried out by a rotating cutting tool to make circular holes in solid materials. Tool.
SLHC Stave Wire-bonding Clearances (Tim) WP4 Glasgow (13 th June 2011)
1.2 m Stave with Co-cured Facings Using Low Areal Density Fiber G. Viehhauser (Oxford) C. Haber (LBNL) T. Hurteau, W. Emmet (Yale) R. Rurns, D. Lynn (BNL)
D. Peterson, for discussion of LC-TPC LP, interface of Endplate and Field cage, Discussion of the LP endplate and field cage geometry A version.
Definitions and callouts
CLIC Permanent Magnet Quadrupole update 27 th January 2011 Mechanical Engineering status update N. Collomb1.
DUNE APA Overview for SBND Synergy Discussion Lee Greenler University of Wisconsin Physical Sciences Lab September 2, 2015.
Cloudland Instruments Hawkeye Mechanical Design Snapshot Compiled April 8th, 2016.
4.4 Size of a Horizontal Boring Machine:  Conventionally, the size of a horizontal boring machine is specified by the spindle diameter in mm.  The spindle.
Fiber Cable/Spectrograph Interface: The Slit-Plate Slit-Plate models are coming together. Who will fab and assemble the parts, and how, will be integral.
M. Gilchriese - February 2001 Disk Sector Status E. Anderssen, M. Gilchriese, F. Goozen, N. Hartman, T. Johnson, F. McCormack, J. Taylor, T. Weber, J.
24 September 2012 Immanuel Gfall (HEPHY Vienna) SVD Status of Mechanics PXD-SVD Meeting Göttingen.
Drawing of bolt and nut.
STEP 1: ASSEMBLE INSERT PLATES 1.Assemble insert plates by press fitting roller bearing and adapter plate into assembly 1.1 Prep all mating surfaces to.
EC: 7 DISK concept Preliminary considerations
VIEW SERIES with Sliding Door
What is TETRIX? If you can dream up a robot design, you can build it with the TETRIX Robotics Design System.
DRILLING Dept. of Mech & Mfg. Engg..
Repairing the MSE Mirrors
Design of the He and HB ODU
Hawkeye Mechanical Design Snapshot
Drawing of stud.
Break down Lance rack Cut one of each of these for each rack
BCM Overview Placement such that system is sensitive to all types of beam accidents. => 2 independent subsystems Halo losses inside the Pixel volume ie.
Pixel module assembly tooling
Presentation transcript:

M. Gilchriese SQP Clearance June 8, 2006

M. Gilchriese 2 Overview A1-2 inners have been mounted on backbone An A1-2 outer has been mounted on the backbone with A1-2 inner A1-2 inners on backbone have been mounted on BPSS In general, the fit to nominal dimensions is excellent and there are only two significant modifications that are required –Open up the slots in the fiber guides on the bottom of the OSP and the top of the ISP to increase clearance for tubes. Might be OK without this but safer to open up –Tabs on CF bottom piece on ISP nearest IP have 2mm clearance holes but the tapped holes in the mating SLA parts glued to the BPSS are 3mm. Holes have to be opened or slotted from the low Z end. There are a few spots in which there is an interference of bolt heads(socket heads) requiring either cutting down the heads, changing to flat heads or some local countersinking.

M. Gilchriese 3 Cable Clearance(1) Two rows of barrel cables. Prototype SLA frame with features at the nominal allowed cable envelope(NOT THE TOTAL ENVELOPE)

M. Gilchriese 4 Cable Clearance(2) 0.75 mm shim fits comfortably under SLA tab. Pile up at first connector can be made near same as at tab

M. Gilchriese 5 Cable Clearance(3) 0.75 mm shim fits under tab at edge Lots of clearance nearer center Spent 1 min arranging cables, could do better with some work, but not much Tab thickness is 0.75mm here My conclusion: have 1.5mm clearance to cables IF CABLES ARE THE SAME AS THESE OR SMALLER

M. Gilchriese 6 Gaining Clearance at PP0 To increase the clearance in the PP0 region for cables requires a number of modifications that are described in the subsequent slides. The overview is the following –The ISP is moved radially inward, tilted in the PP0 region –The tubes are moved radially inward, tilted in the PP0 region –The OSP can then be moved radially inward, tilted in the PP0 region The maximum additional clearance that can be obtained in this way is estimated to be 1.5-2mm

M. Gilchriese 7 ISP Modifications(1) Reduce thickness of these tabs by 1.5mm. Chamfer edges Cut slot for 3mm clearance Mill tab and CF back from edge by about 1.25 mm to clear SLA

M. Gilchriese 8 ISP Modifications(2) Put 1mm shim here between SLA and CF panel Cut 3/16” slots here and bring height of web to 5.75mm. All locations

M. Gilchriese 9 ISP Modifications(3) Coral shim represent opto heat spreader. Add additional 1.25mm shim between heat spreader and PP0(preferred) or remake heat spreaders

M. Gilchriese 10 OSP Modifications(1) Increase opening in SLA parts glued to longeron by machining existing parts or remaking(preferred) by 1mm in all tube locations Glue on 1/32” aluminum splints here to improve strength along entire length Remake or cut down cap pieces by 1mm Cut 3/16” slots here and bring height of web to 5.75mm. All locations

M. Gilchriese 11 Backbone Modification(1) Face down aluminum surface by 1.5-2mm Face down tabs by 1.5-2mm Cut down ground tree piece by 1.5-2mm

M. Gilchriese 12 Cost and Schedule Implications We have accumulated delays already, partly from issues having nothing to do with clearance and partly from having to address this clearance issue. Roughly 1 month If we go ahead with modifications to increase clearance, roughly another month of delay, pushing delivery of first production unit to end of July at the earliest. This delay likely propagates and puts the service panels on or very near the critical path with the current pixel schedule. Extra material and manpower costs are very roughly in the $50K range, is my estimate, assuming we allow the schedule to slide. We could add manpower to improve the schedule at a cost of roughly $10K per month but not obviously recover all of the delay.