Jan 28, 2009CFS-GBL meeting 1 PM report Jan 28, 2009: Reviews –AAP –PAC (May 9 and 10, 2009) Meetings –TILC09 FALC –Madrid, Jan 19, 2009.

Slides:



Advertisements
Similar presentations
PAINLESS PERIODIC REVIEW Cynthia Steinhoff Anne Arundel Community College Arnold, Maryland.
Advertisements

Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
Nov. 19, 2008 ILC08 Global Design Effort 1 Status Report Alternative Siting and Tunnel Design Tom Lackowski.
1 Dissertation & Comprehensive Exam Process Dissertation Process Comprehensive Exam.
1 Dissertation Process 4 process overview 4 specifics –dates, policies, etc.
Project Name Steering Committee Meeting Project Manager: Project Manager Name Program Manager: Program Manager Name Project Sponsor: Project Sponsor Name.
Optimism R&D to be resumed! Three beam tests planned at Kek, –Hybrid target (KEKB Linac) –Liquid target (ATF Linac) –Boron-Nitride Window (KEKB) –(Starting.
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
3 Dec 2003Market Operations Standing Committee1 Market Rule and Change Management Consultation Process John MacKenzie / Darren Finkbeiner / Ella Kokotsis,
IT 499 Bachelor Capstone Week 9.
ICFA Beam Dynamics Panel Update and ABDW #49  ECLOUD`10 Mark Palmer Cornell University Laboratory for Elementary-Particle Physics.
Full Process: From Application to Finalization
Create a New Company Division In One Quarter How to.
Atlanta Public Schools Project Management Framework Proposed to the Atlanta Board of Education to Complete AdvancED/SACS “Required Actions” January 24,
JSR Review Process April Patrick Curran, Mike Milinkovich, Heather Vancura, Bruno Souza.
Market Meeting Support Susan Munson ERCOT Retail Market Liaison Commercial Operations Subcommittee (COPS) June 10, 2008.
Akira Yamamoto Project Manager, SCRF To be presented, April 19, 2009 AAP Review – SCRF Introduction AAP-SCRF-Introduction.
Chicago Pricing of Services Process Rollout C O N F I D E N T I A L.
Working Definition of Program Evaluation
EARTO – working group on quality issues – 2 nd session Anneli Karttunen, Quality Manager VTT Technical Research Centre of Finland This presentation.
IT 499 Bachelor Capstone Week 8. Adgenda Administrative Review UNIT Seven UNIT Eight Project UNIT Nine Preview Project Status Summary.
MyFloridaMarketPlace Roundtable January 21, :00 a.m. – 12:00 p.m. MyFloridaMarketPlace.
U.S. Department of Agriculture eGovernment Program July 10, 2002 eGovernment Working Group Meeting Chris Niedermayer, USDA eGovernment Executive.
Executive Session Director’s CD-3b Review of the MicroBooNE Project January 18, 2012 Dean Hoffer.
Nick Walker, Brian Foster LAL, Orsay WP2: Coordination with the GDE.
Safety Auditors Conference 2005 A Practical Approach…….
IT Services Transition Weekly Program Management Working Session February 22, 2011 | Tuesday | 11:30am – 1:00pm.
Background Management Council (MC) was briefed on approach in early Feb 2003 and approved it Agreed that every Service Group (SG) will participate in.
2006 BYU Reaffirmation of NWCCU Accreditation Executive Accreditation Committee February 12, 2006.
LCFOA Meeting at SLAC Linear Collider Forum of the Americas 1 LINEAR COLLIDER FORUM OF THE AMERICAS CONVENTIONAL FACILITIES OVERVIEW Victor R. Kuchler.
Complex Aerospace Systems Exchange (CASE) 2012 Conference Planning Committee Meeting 11 Jan 2012.
INFO 637Lecture #101 Software Engineering Process II Review INFO 637 Glenn Booker.
Middle States Accreditation – update at Town Hall, 2/19/2014 Middle States Accreditation: Update at Town Hall Meeting February 19, 2014.
Welcome to Technical Communications Enl Overview Course structure Course structure Course schedule Course schedule Student assessment Student assessment.
AGS RSVP Weekly Meeting P. Pile 16 September 2004 AGS RSVP Weekly Meeting, 16 Sep 2004 AGS Project Office - status of funding, comments on RSVP
Executive Session Director’s CD-1 Review of the Mu2e Project April 3, 2012 Elaine McCluskey.
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
1 CLIC / ILC Collaboration for CES issues JOHN OSBORNE – CES 8 April 2009.
1 Global Design Effort TILC08 - WG1 Summary WG-1: Cost Reduction Studies J. Carwardine, T. Shidara, N. Walker (For WG-1 participants)
Columbia University School of Engineering and Applied Science Review and Planning Process Fall 1998.
Comenius – ACE 2011 Active Citizenship Europe Project meeting Almaden Spain 27 March – 01 April AT1-COM
Global Design Effort - CFS ILC Accelerator Design and Integration Meeting 1 ILC AD&I MEETING CONVENTIONAL FACILITIES AND SITING GROUP UPDATE V.
10 Aug 2010 ECE/BENG-493 SENIOR ADVANCED DESIGN PROJECT Meeting #2.
Activities and news Last meeting: 2015 CERN budget allocations as expected, now distributed on accounts Annual report done, and MTP (Medium Term Plan)
CLIC Workshop, CERN 1 CLIC/ILC Collaboration Report: Marc Ross (Fermilab); for Nick Walker, Akira Yamamoto Project Managers International Linear.
AS TAG Leaders Meeting PM Report. Topics R&D Plan release 4 ADI WebEx meetings (cost and design) Central region integration face-to-face meetings.
CIWQS Review Phase II: Evaluation and Final Recommendations March 14, 2008.
CFS / Global – 04 Aug, 2010 PM Report: SB2009: –ADI meeting 23.07: Parameter tables with low energy / low power operation –BA Workshop Planning CFS participation.
November 05, 2008CFS-GBL meeting 1 PM report Nov 5, 2008: 0) ILC08 plenaries 1) Summary of Pac review 2) Report on ttc and barc (india) 3) Summary of positron.
Global Design Effort - CFS ILC Global Systems Meeting 1 ILC GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP STATUS REPORT V. Kuchler,
Conventional Facilities and Siting GG Global Design Effort BILCW 07 - Beijing1 Conventional Facilities and Siting Global Group Summary Report.
Report of the Technical Subcommittee Mario Bergeron, Technical Subcommittee Chair/NGEC Vice Chair.
On S1Global Writeup S1G Writeup Meeting Nobu Toge 1.
SCRF Cavity WebEx Meeting May 17, 2010 Reports from PM (10 min.) – Brief report from ILC-PAC – Industrialization workshop as IPAC satellite meeting, Kyoto,
ILC 2007 Global Design Effort 1 Planning Damping Rings Activities in the Engineering Design Phase Andy Wolski Cockcroft Institute/University of Liverpool.
1 of 5 CONVENTIONAL FACILITIES & SITING GROUP PROGRESS OVERVIEW J.L. Baldy, A. Enomoto, V. Kuchler V. KUCHLER GDE Executive Committee Meeting
© 2013 Gartner, Inc. and/or its affiliates. All rights reserved. Gartner is a registered trademark of Gartner, Inc. or its affiliates. The Value Review.
Sustained National Climate Assessment Update Emily Therese Cloyd US Global Change Research Program National Coordination Office 1.
PM Report AS ILC PAC (19-20 May) Agenda: –Akira, Rongli, Hitoshi H, Marc, Nick, Toshiaki, Mark P., Peter G. –Nick will report on Design –Marc.
CLIC 23 rd Project Meeting: news and updates Philip Burrows John Adams Institute Oxford University 1.
BSBPMG501A Manage Project Integrative Processes Manage Project Integrative Processes Project Integration Processes – Part 2 Diploma of Project Management.
ILC EDMS Selection Committee Progress Report Tom Markiewicz SLAC 29 November 2005.
CFS / Global – 09 June, 2010 PM Report: SB2009: –4 two-day workshops form the core of ‘TOP LEVEL CHANGE CONTROL’ –  as advised by AAP, PAC and etc –Written.
Global Design Effort - CFS ILC CFS & Global Systems Meeting 1 ILC CFS & GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS Status.
Main Linac Technology (MLT) Meeting To be held through WebEx July 13, 2007.
Project Planning and Management Gail Campbell and Tom Broadhurst.
TDR Technical Editorial Board Webex meeting, 16 th Dec 2011 Report from the Chair (John) Technical Editing reports (Benno, Maura) Review of TDR Outlines.
Executive Session Director’s Conceptual Design Review of Mu2e Project May 3-5, 2011 Jim Yeck.
July 11, 2008M Ross for PM - ILC GDE - ILCDR08 closeout 1 GDE Program for the ILC Technical Design Phase Marc Ross for: Akira Yamamoto, Nick Walker GDE.
Status report on the activities of TF-CS/OTA
Presentation transcript:

Jan 28, 2009CFS-GBL meeting 1 PM report Jan 28, 2009: Reviews –AAP –PAC (May 9 and 10, 2009) Meetings –TILC09 FALC –Madrid, Jan 19, 2009

Jan 28, 2009CFS-GBL meeting 2 CFS material for AAP: Charge not yet released. –See ‘AAP preparation’ sent Monday, Jan 19 Input to AAP to be posted on TILC ‘Indico’ –Will be publically accessible List of inputs  to be prepared this week! –(As announced)

Jan 28, 2009CFS-GBL meeting 3 01/19 (Monday) ‘AAP Prep’ mail charge is now in draft form must be agreed to by the ILC Executive Committee. list of panel members is also in final stages of preparation. begin submitting material for the review based on general guidelines listed here expect each Group Leader to be asked to make a formal presentation and to be available to answer questions from the panel. The review charge will include specific, perhaps detailed, questions on three key focus topics… CFS Focus on the effectiveness of the program, 1.will the program yield the information needed for the Technical Design Phase, 2.are the available resources properly focused on the most important goals and 3.are the schedule and strategy appropriate 4.provide technical (foremost), organizational, resource and schedule information.

Jan 28, 2009CFS-GBL meeting 4 01/19 (Monday) ‘AAP Prep’ mail The second theme will be a comprehensive look at each Technical Area. –In this part of the review, there will not be a list of detailed questions, but the approach is similar. Please cover key technical activities - risk mitigation, cost reduction and system design. What are the issues and priorities? What is your strategy? What is your resource base and schedule? Please remember the panel has more time to digest your material than in a more traditional review – –but we expect more thoughtful feedback from them also. We may be asked for additional material and/or clarification during the weeks leading up to the meeting itself. Good quality presentations and similar documentation is suitable and you don't need to generate re-formatted, pre-digested writeups for the panel. The panel is made up of leaders and experts from within our community, almost entirely, so a lot of introductory material is not also needed.

Jan 28, 2009CFS-GBL meeting 5 Preparation for the Documents Executive summary (by PM, word & ppt) Presentations (by GLs, ppt files) –Original Plan, Status, and Expected Progress with in TDP1, and further plan in TDP-2 Reference documents –Major presentations (ppt files), –Proceedings –Technical notes, To be submitted to URL

Jan 28, 2009CFS-GBL meeting 6 Process to AAP Review Jan. 31, Review document submitted to PMs Feb. Updated b/w PMs/GLs Feb. 28,Submitted to AAP April 10Finalized April 17-1Review

Jan 28, 2009CFS-GBL meeting 7 Suggested input – CFS: Planning and status –ILC08 summary, 2009 plans and resources Collaboration activities –CLIC - ILC ‘safety document’ Completed / Underway engineering activities –(Process water and Linac configuration studies) Design activities –CAD effort, CLIC / XFEL connection Strategic Overview –R & D Plan and backup material Other?

Jan 28, 2009CFS-GBL meeting 8 TILC 09 Parallel sessions following ‘traditional’ format –Slightly reduced available time –Managing ‘integrated’ activities (e.g. Minimum machine) must be fit into schedule Take advantage of visit to KEK –Thanks to Masami Tanaka! –Meet with experts, new *potential* team members –(Including interaction with M. Yoshioka) One small difference: –PM will be devoted to AAP

Jan 28, 2009CFS-GBL meeting 9 FALC meeting First meeting with new chair – Pierre Coulombe of National Research Council - Canada Presented CLIC / ILC collaboration activities –Questioned about the ‘extent’ or strength of the collaboration