Tony Doyle “GridPP2 Proposal”, GridPP7 Collab. Meeting, Oxford, 1 July 2003.

Slides:



Advertisements
Similar presentations
An open source approach for grids Bob Jones CERN EU DataGrid Project Deputy Project Leader EU EGEE Designated Technical Director
Advertisements

S.L.LloydATSE e-Science Visit April 2004Slide 1 GridPP – A UK Computing Grid for Particle Physics GridPP 19 UK Universities, CCLRC (RAL & Daresbury) and.
Tony Doyle GridPP – From Prototype To Production, HEPiX Meeting, Edinburgh, 25 May 2004.
Tony Doyle - University of Glasgow GridPP EDG - UK Contributions Architecture Testbed-1 Network Monitoring Certificates & Security Storage Element R-GMA.
Tony Doyle Executive Summary, PPARC, MRC London, 15 May 2003.
Tony Doyle GridPP2 Specification Process Grid Steering Committee Meeting, MRC, London, 18 February 2004.
S.L.LloydGridPP Collaboration Meeting IC Sept 2002Slide 1 Introduction Welcome to the 5 th GridPP Collaboration Meeting Steve Lloyd, Chair of GridPP.
Particle physics – the computing challenge CERN Large Hadron Collider –2007 –the worlds most powerful particle accelerator –10 petabytes (10 million billion.
Level 1 Components of the Project. Level 0 Goal or Aim of GridPP. Level 2 Elements of the components. Level 2 Milestones for the elements.
Tony Doyle GridPP2 Proposal, BT Meeting, Imperial, 23 July 2003.
15 May 2006Collaboration Board GridPP3 Planning Executive Summary Steve Lloyd.
Tony Doyle - University of Glasgow PPARC Review Timeline 0. PPARC Call (February 2003) 1.GridPP2 Proposal (30/5/03) 2. Feedback from Reviewers 3. Responses.
EGEE statement EU and EU member states major investment in Grid Technology Several good prototype results Next Step: –Leverage current and planned national.
S.L.LloydGridPP CB 29 Oct 2002Slide 1 Agenda 1.Introduction – Steve Lloyd 2.Minutes of Previous Meeting (23 Oct 2001) 3.Matters Arising 4.Project Leader's.
1 Software & Grid Middleware for Tier 2 Centers Rob Gardner Indiana University DOE/NSF Review of U.S. ATLAS and CMS Computing Projects Brookhaven National.
EC Review – 01/03/2002 – G. Zaquine – Quality Assurance – WP12 – CS-SI – n° 1 DataGrid Quality Assurance Gabriel Zaquine Quality Engineer - WP12 – CS-SI.
Slide David Britton, University of Glasgow IET, Oct 09 1 Prof. David Britton GridPP Project leader University of Glasgow GridPP Vendor Day 30 th April.
GridPP Steve Lloyd, Chair of the GridPP Collaboration Board.
Southgrid Status Report Pete Gronbech: February 2005 GridPP 12 - Brunel.
LCG Milestones for Deployment, Fabric, & Grid Technology Ian Bird LCG Deployment Area Manager PEB 3-Dec-2002.
GridPP9 – 5 February 2004 – Data Management DataGrid is a project funded by the European Union GridPP is funded by PPARC WP2+5: Data and Storage Management.
CMS Report – GridPP Collaboration Meeting VI Peter Hobson, Brunel University30/1/2003 CMS Status and Plans Progress towards GridPP milestones Workload.
Tony Doyle - University of Glasgow Introduction. Tony Doyle - University of Glasgow 31 August 2006ScotGrid Introductory Meeting Expression of Interest.
EGEE is a project funded by the European Union under contract IST JRA1 Testing Activity: Status and Plans Leanne Guy EGEE Middleware Testing.
S.L.LloydGridPP CB 19 February 2003Slide 1 Agenda 1.Minutes of Previous Meeting (29 Oct 2002) 2.Matters Arising 3.GridPP2 Planning 4.EGEE 5.Any Other Business.
Tony Doyle - University of Glasgow 12 January 2005Collaboration Board Beyond GridPP2 Tony Doyle.
Tony Doyle GridPP – From Prototype To Production, GridPP10 Meeting, CERN, 2 June 2004.
12th November 2003LHCb Software Week1 UK Computing Glenn Patrick Rutherford Appleton Laboratory.
Robin Middleton RAL/PPD DG Co-ordination Rome, 23rd June 2001.
1 st EGEE Conference – April UK and Ireland Partner Dave Kant Deputy ROC Manager.
Security Area in GridPP2 4 Mar 2004 Security Area in GridPP2 “Proforma-2 posts” overview Deliverables – Local Access – Local Usage.
3 June 2004GridPP10Slide 1 GridPP Dissemination Sarah Pearce Dissemination Officer
ATLAS and GridPP GridPP Collaboration Meeting, Edinburgh, 5 th November 2001 RWL Jones, Lancaster University.
Neil Geddes GridPP-10, June 2004 UK e-Science Grid Dr Neil Geddes CCLRC Head of e-Science Director of the UK Grid Operations Support Centre.
7April 2000F Harris LHCb Software Workshop 1 LHCb planning on EU GRID activities (for discussion) F Harris.
Grid Computing Status Report Jeff Templon PDP Group, NIKHEF NIKHEF Scientific Advisory Committee 20 May 2005.
Tony Doyle - University of Glasgow 6 September 2005Collaboration Meeting GridPP Overview (emphasis on beyond GridPP) Tony Doyle.
John Gordon CCLRC e-Science Centre LCG Deployment in the UK John Gordon GridPP10.
SouthGrid SouthGrid SouthGrid is a distributed Tier 2 centre, one of four setup in the UK as part of the GridPP project. SouthGrid.
GridPP Deployment & Operations GridPP has built a Computing Grid of more than 5,000 CPUs, with equipment based at many of the particle physics centres.
Tony Doyle - University of GlasgowOutline EDG LCG GSC UK Core Grid GridPP2 EGEE Where do we go from here? Operations.
InterGrid Meeting 7 Oct 2001 Tony Doyle. Tony Doyle - University of Glasgow GridPP Status  Financial Background  Deliverables  Recruitment  Regional.
GridPP: Executive Summary Tony Doyle. Tony Doyle - University of Glasgow Oversight Committee 8 February 2007 Outline Exec 2 Summary Grid status High level.
Bob Jones Technical Director CERN - August 2003 EGEE is proposed as a project to be funded by the European Union under contract IST
GridPP Presentation to AstroGrid 13 December 2001 Steve Lloyd Queen Mary University of London.
GridPP Building a UK Computing Grid for Particle Physics Professor Steve Lloyd, Queen Mary, University of London Chair of the GridPP Collaboration Board.
GRID IIII D UK Particle Physics Tony Doyle - University of Glasgow GridPP Status Report  Executive Summary  News  “Unfunded” EU DataGrid Posts  Shadow.
…building the next IT revolution From Web to Grid…
Tony Doyle - University of Glasgow 8 July 2005Collaboration Board Meeting GridPP Report Tony Doyle.
US ATLAS Tier 1 Facility Rich Baker Brookhaven National Laboratory Review of U.S. LHC Software and Computing Projects Fermi National Laboratory November.
E-Science Research Councils awarded e-Science funds ” science increasingly done through distributed global collaborations enabled by the Internet, using.
Grid User Interface for ATLAS & LHCb A more recent UK mini production used input data stored on RAL’s tape server, the requirements in JDL and the IC Resource.
Tony Doyle - University of Glasgow Introduction. Tony Doyle - University of Glasgow 6 November 2006ScotGrid Expression of Interest Universities of Aberdeen,
Grid Security work in 2004 Andrew McNab Grid Security Research Fellow University of Manchester.
INFSO-RI Enabling Grids for E-sciencE The EGEE Project Owen Appleton EGEE Dissemination Officer CERN, Switzerland Danish Grid Forum.
J Jensen/J Gordon RAL Storage Storage at RAL Service Challenge Meeting 27 Jan 2005.
Grid Deployment Technical Working Groups: Middleware selection AAA,security Resource scheduling Operations User Support GDB Grid Deployment Resource planning,
Slide § David Britton, University of Glasgow IET, Oct 09 1 Prof. David Britton GridPP Project leader University of Glasgow GridPP delivering The UK Grid.
18/12/03PPD Christmas Lectures 2003 Grid in the Department A Guide for the Uninvolved PPD Computing Group Christmas Lecture 2003 Chris Brew.
GridPP2 Workshop – 5 March 2004 – Data Management DataGrid is a project funded by the European Union GridPP is funded by PPARC GridPP2: Metadata Management.
Bob Jones EGEE Technical Director
Gavin McCance University of Glasgow GridPP2 Workshop, UCL
SA1 Execution Plan Status and Issues
Ian Bird GDB Meeting CERN 9 September 2003
Grid related projects CERN openlab LCG EDG F.Fluckiger
Understanding the nature of matter -
UK GridPP Tier-1/A Centre at CLRC
UK Testbed Status Testbed 0 GridPP project Experiments’ tests started
Collaboration Board Meeting
LHC Computing, RRB; H F Hoffmann
Presentation transcript:

Tony Doyle “GridPP2 Proposal”, GridPP7 Collab. Meeting, Oxford, 1 July 2003

Tony Doyle - University of Glasgow GridPP2 Proposal ~30 page proposal + figures/tables + 11 planning documents: 15.Tier-0 16.Tier-1 17.Tier-2 18.The Network Sector 19.Middleware 20.Applications 21.Hardware Requirements 22.Management 23.Travel 24.Dissemination 25.From Testbed to Production A lot of work by everyone in a relatively short time…

Tony Doyle - University of Glasgow GridPP Mid-Term Review 1.What has been achieved in the first 18 months? Oversight Committee (May 2003): Conclusion "Excellent progress, management, control, reporting and thinking (both tactical and strategic), we look forward to an equally successful second half of the project as the investments made translate into middleware roll-out and benefits to the HEP experiments. It is difficult to imagine more impressive progress all round." 2.Development in the medium-long term? GridPP1 (09/01-08/04)Prototypeshort “Web to Grid” GridPP2 (09/04-08/07)Productionmedium “Prototype to Production” (09/07-) Exploitationlong-term “LHC exploitation”

Tony Doyle - University of Glasgow What impressed the Oversight Committee? (I) Identifiable progress via tasks and metrics “At the midpoint of the project, over half of the 182 tasks are completed and all of the 44 metrics are within specifications. The Project Map incorporates a complete Risk Register with 76 identified risks, reviewed on a regular basis.”

Tony Doyle - University of Glasgow Middleware Development Why were the Oversight Committee convinced? (II) What impressed the Oversight Committee? (II)

Tony Doyle - University of Glasgow Why were the Oversight Committee convinced? (III) Identifiable progress via testbed monitoring “All testbed sites can be said to be truly on a Grid by virtue of their registration in a comprehensive resource information publication scheme, their accessibility via a set of globally enabled resource brokers, and the use of one of the first scalable mechanisms to support distributed virtual communities (VOMS).” UK-wide development using EU-DataGrid tools (v1.47). Not yet robust, but sufficient for prototype development. See What were the Oversight Committee looking forward to? (I)

Tony Doyle - University of Glasgow Application Interfaces What were the Oversight Committee looking forward to? “benefits to the HEP experiments” What were the Oversight Committee looking forward to? (II)

Tony Doyle - University of Glasgow Where will we be in September 2004? Applications will be using the Grid for their Monte Carlo production. Typically low level usage (~5% of the CPU and ~1% of the storage). EDG will have completed its task of providing prototype middleware. EGEE will be in progress with more emphasis on a common infrastructure for a broader range of applications. Testing of LCG Phase 1 will be well underway. A prototype Tier-0 Centre will be linked to the Regional Tier centres based on the LCG releases. GridPP1 will be completing its task of developing and deploying a prototype Grid in the UK. A prototype Tier-1 Centre will exist based at RAL. Tier-2 centres will be being built up from hardware provided by the Institutes. The UK testbed will be fully integrated with the LCG testbed. The prototype Grid will have been rolled out to Institutes across the UK. Experiment applications will have been developed to various levels of functionality. Grid computing will be expected to provide for the requirements of all experiments.

Tony Doyle - University of Glasgow What will we need to do in September 2004? Full functionality production Tier-1 Centre needs to be developed. Tier-2 centres will need to be developed and integrated. The software development (verification, validation and testing) cycle will need to conform to industrial standards. EGEE will have assessed middleware. Dependent upon LCG for its operations centre. In the UK, the Grid Support Centre will have expanded its role. Need to incorporate anticipated wider participation, a move from Monte Carlo production to a full Physics Analysis environment The applications must be fully developed, tested and exercised in a production Grid environment. Scale? The total CPU capacity corresponds to ~7000 kSI2000 (or 20,000 PIII 1GHz processors) and 750 TBytes of disk storage in Sept LCG will need to build the full facility needed by the LHC experiments including Tier-0 and Tier-1 resources at CERN. We will need to ensure that our deployment plans are fully interoperable especially where resources are shared with other disciplines.

Tony Doyle - University of Glasgow What do we plan to do? Build a Production Grid Components

Tony Doyle - University of Glasgow GridPP2 Timeline

Tony Doyle - University of Glasgow High Level Deliverables At the start of each year the Project Management Board will review these in order to specify that year’s target in terms that can be easily defined and monitored across the Grid.

Tony Doyle - University of Glasgow Tagged release selected for certification Certified release selected for deployment Tagged package Problem reports add unit tested code to repository Run nightly build & auto. tests Grid certification Fix problems Application Certification Build System Certification Testbed ~40CPU Production Testbed ~1000CPU Certified public release for use by apps. 24x7 Build system Test Group WPs Unit Test Build Certification Production Users Development Testbed ~15CPU Individual WP tests Integration Team Integration Overall release tests Releases candidate Tagged Releases Releases candidate Certified Releases Apps. Representatives From Testbed to Production

Tony Doyle - University of Glasgow GridPP2 Project Map Need to build this in: to identify progress…

Tony Doyle - University of Glasgow Projected Hardware Resources Total Resources: (note x2 scale change)

Tony Doyle - University of Glasgow Experiment Requirements: UK only Total Requirement:

Tony Doyle - University of Glasgow CPU Estimates - “comparison” across (x,t) Estimated CPU Capacity required at CERN Jan 2000: 3.5K SI95 Other experiments LHC K SI2000 Estimated CPU Capacity required at CERN 0 1,000 2,000 3,000 4,000 5, Jan 2000: 3.5K SI95 Other experiments LHC K SI95 Moore’s law – some measure of the capacity technology advances provide for a constant number of processors or investment CPU comparison considerations – 1.“historical precedent of underestimation?”: factor 2 increase in CERN estimates (over 3 years). 2.“meeting requirements of ALL experiments in UK?”: factor 4 to 2 3.“RAW-AOD-ESD-TAG”- “analysis” : previously largely un-estimated

Tony Doyle - University of Glasgow Tier Centres - Functionality RAW ESD AOD TAG “Interesting” Events List RAW ESD AOD TAG RAW ESD AOD TAG Tier-0(International) Tier-1(National) Tier-2(Regional) Tier-3(Local) Data Files Data Files Data Files TAG Data Files Data Files Data Files RAW Data File Data Files Data Files ESD Data Files Data Files AOD Data Event 1 Event 2 Event n

Tony Doyle - University of Glasgow Tier-1/A Services [FTE] Management [1.5] DataCPUUKMiddlewareExperiment DiskTapeFile System DeploymentSupport [1.5][2.5][0.5][2.0] Core Services [2.5]Operations [3.0] Security [1.0]Networking [0.5] High quality data services foremost requirement of a Tier-1 Centre A National and International Role UK Focus for International Grid development Established track record at RAL

Tony Doyle - University of Glasgow Tier-2 Centres [FTE] Four Regional Tier-2 Centres London: Brunel, Imperial College, QMUL, RHUL, UCL. NorthGrid: CLRC Daresbury, Lancaster, Liverpool, Manchester, Sheffield. ScotGrid: Durham, Edinburgh, Glasgow. SouthGrid: Birmingham, Bristol, Cambridge, Oxford, RAL PPD. Hardware resources are provided by Institutes GridPP provides manpower

Tony Doyle - University of Glasgow Meeting the Experiments’ Hardware Requirements Significant… Production Grid inc. Tier-2 resources needed…

Tony Doyle - University of Glasgow Tier Centres - Service Evolution

Tony Doyle - University of Glasgow Tier Centres - Manpower Requirements GridPP1GridPP2 FY FY GridPP1GridPP2 FY FY Exploit n GridPP2Exploit n FY FY 07-08

Tony Doyle - University of Glasgow Middleware, Security and Network Service Evolution

Tony Doyle - University of Glasgow Middleware, Security and Network Service Evolution Information Services: strategic role within EGEE

Tony Doyle - University of Glasgow Application Interfaces - Service Evolution Currently 18 FTE working in experiment interface areas Encourage cross-fertilisation between collaborations Extend Grid across PP Proposed new activities 21 FTE GridPP2 request

Tony Doyle - University of Glasgow “Management” Conclusion: retain existing structure less “development” more “deployment” and “use”

Tony Doyle - University of Glasgow Summary Tables

Tony Doyle - University of Glasgow Roadmap: GridPP2 Proposal GridPP1GridPP2Exploitation

Tony Doyle - University of Glasgow Components: GridPP2 Proposal

Tony Doyle - University of Glasgow PPPARC Review Timeline: Projects Peer Review Panel (14-15/7/03) Grid Steering Committee (28-29/7/03) Science Committee (October 03) Components: GridPP2 Proposal (£23.1m) VerticalIntegrationVerticalIntegration

Tony Doyle - University of Glasgow c.f. GridPP6 Collab. Meeting: Proto-Proposal

Tony Doyle - University of GlasgowConclusion We request £23.1m to fund our three-year project, GridPP2 This will provide a Production Grid incorporating 1.access to the Tier-0 Centre at CERN and the LCG deployment releases 2.the UK Tier-1 Centre 3.integration of four distributed Tier-2 centres 4.technical development in Middleware, Security and Networking 5.Grid integration of the experiments The project is in direct support of PPARC's highest priority science programme, the LHC