Utility Vegetation Management Application DESIGNING A MOBILE GEOSPATIAL APPLICATION TO STREAMLINE FIELD COLLECTION & RECORDKEEPING Joshua DeWees.

Slides:



Advertisements
Similar presentations
GBA 573 Final Presentation Jonathan Stone Summer 2003.
Advertisements

Geospatial 09 Kathie Jewell April 29,2009 National Invasive Species Information Management System NISIMS.
1 Survey Technology. Data Collection Tools Available in the Market 1. Paper Survey 2. Smart Paper 3. Cell Phones 4. Personal Digital Assistants - PDAs.
Outage Reporting Hierarchy Background Data Capture Structure Next Steps.
DISPUTES & INVESTIGATIONS ECONOMICS FINANCIAL ADVISORY MANAGEMENT CONSULTING Early Lessons Learned from DOE-EPRI Framework Experience Melissa Chan MA DPU.
Introduction Build and impact metric data provided by the SGIG recipients convey the type and extent of technology deployment, as well as its effect on.
NETWORK ANALYSIS IN GIS ENVIRONMENT Uday Deshmukh North Delhi Power Limited.
“Update on the Expansion of CSU’s Underground Electric System” Selection of a Street Light Monitoring System Presented by : Timothy R. Crabb, P.E. Assistant.
Hillyard – Vektr CQI ™ Continuous Quality Improvement Hillyard Inc. has partnered with Nuvek LLC, to gain hosting capabilities for a new and innovative.
CenterPoint Energy Houston Electric 2011 Response to Contamination Conditions John Kellum Director of Transmission Operations August 3, 2011.
Outright “Your small business simplified” By: Joshua LaCroix.
Increase Productivity A monitored employee is a productive employee Operational Efficiency Streamline processes between the office and the field Improve.
Kandiyohi Power Cooperative ESRI Technology in Action.
A Decision Support System For Civil Protection Prof. Thanasis Ziliaskopoulos University of Thessaly Hellenic Institute of Transport International Conference.
Islamic Republic of Afghanistan Ministry of Education EMIS Directorate.
Creating Business Impact | Providing Expert Solutions | Delivering Quality Consistently | Building Partnerships Globally Presented by: Vidyalankar Nidamarthy.
Scottsdale, AZ September 26, 2012 Western Underground Fall Conference Scottsdale, AZ September 26, 2012 Existing Primary Cable Fault Locating and Testing.
Introduction to Trimble® Field Inspector Solution Trimble Utilities Field Solutions October 2010.
A New Paradigm for Utility Coordination Kenny Franklin INDOT Director of Utilities and Railroads.
Qatar Planning Council 1 Best Statistical Information to Support Qatar’s Progress Statistical Capacity Building for Information Society in Qatar.
HISTORY MARKET The Development of Concept Companies into Entrepreneurial Business SEED STAGE & EARLY STAGE VENTURE CAPITAL Funding Mentoring UNIQUENESS.
Esri UC2013. Technical Workshop. Technical Workshop 2013 Esri International User Conference July 8–12, 2013 | San Diego, California ArcGIS for Local Government.
ArcGIS Workflow Manager An Introduction
1 Power Quality Mary Santori, P.E. Senior Engineer September 12, 2013.
Relex Reliability Software “the intuitive solution!” Relex Software Corporation 1.
Don Von Dollen Senior Program Manager, Data Integration & Communications Grid Interop December 4, 2012 A Utility Standards and Technology Adoption Framework.
Mobile Workforce Management San Bernard Electric Cooperative,inc.
The Utilization of GIS Technology at Northeastern REMC Presented By: Steven Weber, GISP Northeastern REMC (260)
APPA Engineering and Operations Technical Conference Atlanta, Georgia April 13-18, 2007 “Nailing the Basics” Earns Princeton, IL RP3 Diamond Award.
Risk management in Software Engineering T erm Paper By By Praveenkumar Sammita Praveenkumar Sammita CSC532 CSC532.
GIS as Applied to Disaster Management in Outlying and Non-Metro Illinois Counties James Cueno 596 A Peer Presentation - Spring 2 ‘15.
SDG&E Electric Reliability Reporting CPUC Workshops May 26-27, 2015.
Power Line Carrier Communication based Automated Meter Reading System
Texas Integrated Energy Solutions. Development Team, Background, Objective, & Justification 2.
Project Title : CyberGIS Project Members : M.S.R Perera D.S Kulasuriya W.M.D Jeewantha Project Title : CyberGIS Project Members : M.S.R Perera D.S Kulasuriya.
A New Paradigm for Utility Coordination Kenny Franklin INDOT Director of Utilities and Railroads.
Team Members David Haas Yun Tang Robert Njoroge Tom Kerwin Clients Facilities Management Don Anderson Rick Klein.
FERC Assessment of Demand Response & Advanced Metering 2006 APPA Business & Financial Conference September 18, 2006 – Session 11 (PMA) Presented by: Larry.
Planning and Analysis Tools to Evaluate Distribution Automation Implementation and Benefits Anil Pahwa Kansas State University Power Systems Conference.
Board of Directors & Technical Committee Thursday, March 29, 2012 Data Management (Contract) Field Data Collection & Database Development Solution Presented.
Actions Affecting ERCOT Resulting From The Northeast Blackout ERCOT Board Of Directors Meeting April 20, 2004 Sam Jones, COO.
Welcome To Business Summary DiveIn Incorporated is a small company that specializes in the sales of swimming pools supplies to homeowners by mail order.
Time Collection with Mobile Devices Session Presented by JP Issock Quality Business Consulting.
Ed Hardick Director of Marketing/ Product Support.
Geoffrey L. Beausoleil Assistant Manager, Office of Operational Support DOE Idaho Operations Office September 12, 2006 Presentation to DOE ISM Champions.
1 Overview of Reliability Requirements XYZ Cooperative Date: abc.
SWEDE 2014 Remote Monitoring of Faults – Frank Daniel (Oncor)
RUTGERS INTELLIGENT TRANSPORTATION SYSTEMS INSPECTION AND MAINTENANCE SOFTWARE (RITSIMS) NJDOT TRAINING CASE STUDY.
Digital recordkeeping strategy for mobile work processes Joel Smith HPRM System Administrator.
Substation Maintenance
Regulatory Streamlining Task Force Update Discussion Item December 6, 2011 Board of County Commissioners.
Esri UC2013. Technical Workshop. Technical Workshop 2013 Esri International User Conference July 8–12, 2013 | San Diego, California ArcGIS for Law Enforcement:
CONTENTS: 1.Abstract. 2.Objective. 3.Block diagram. 4.Methodology. 5.Advantages and Disadvantages. 6.Applications. 7.Conclusion.
Bookshelf APWA BookstoreFree Online From APWA “Public Works Management Practices Manual,” Version 7.
McGranaghan/Sabin US Session 2 Block 3 Question 8 Barcelona May Calculating System Events and Using Voltage Sag Benchmarking as a System Performance.
2006 Hurricane Preparedness June 5, 2006 Sumter Electric Cooperative, Inc R. Ben Brickhouse: Director of Engineering & IT John J. LaSelva: Director of.
Managing ITS Assets using GIS in Silicon-Valley City of San Jose, CA Kenneth Salvail, P.E. ITE District 6 Annual Meeting July 2007, Portland Oregon.
ARM and GPS Based Transformer monitoring system with area Identification Student Name USN NO Guide Name H.O.D Name Name Of The College & Dept.
Join us on Twitter: #AU2013 UT3024: The Design Process Simplified from WO to Warehouse Jeremiah McKnelly & Scott
Automating Work Order Processes for Advanced Metering Infrastructure (AMI) Devices with Collector for ArcGIS and Portal for ArcGIS Subrahmanyam Pendyala.
Dr. Vidya Vankayala Director, Grid Modernization (604) Richard Guo
Click to edit Master title style Click to edit Master text styles Second level Third level Fourth level Fifth level Enabling Coordinated School Health.
Anytime, Anywhere Access Benefits Functionality Work Order Administration Dispatch Work Order Work Order Details New Work Order Additional Functionality.
Florida Department of TRANSPORTATION FLORIDA DEPARTMENT OF TRANSPORTATION Crash Cushion and Guardrail Approach Terminal In-Service Performance Evaluation.
CHAPTER 3 Management Systems. Learning Objectives Describe the basic business activities and tools necessary to implement successful industrial hygiene.
Utility Needs and Smart Grid for Major Storm Events
Advanced Fuse-Saving Techniques
Use of Lightning Data for Electricity Transmission Operations
Customized gis applications for Electric DISTRIBUTION Utilities
Presentation transcript:

Utility Vegetation Management Application DESIGNING A MOBILE GEOSPATIAL APPLICATION TO STREAMLINE FIELD COLLECTION & RECORDKEEPING Joshua DeWees

Agenda I.Goals II.Definition III.Vegetation Impacts IV.Distribution Utility V.Spoon River Electric: Case Study VI.Prototype Design Strategy VII.Information Products VIII.Timeline

Project Goals  Create a prototype mobile application to streamline the Utility Vegetation Management field survey process by improving:  Consistency in quantifying vegetation  Record keeping and customer related notes  Documentation of performed work

Utility Vegetation Management (VM)  One of the most expensive maintenance activities in the electric utility business  Necessary for safety and reliability  Requires a dedicated program with a good planning strategy  Requires detailed records to track spatial characteristics over time (species, volume and location)

Vegetation Impacts on Distribution Lines  Direct contact  Overhanging Branches  Underbrush that prevents access

Direct Contact

Overhanging Branches

Underbrush

Distribution Electric Systems  Vegetation can cause faults that are transient or constant  High current faults can trigger system protection devices ( fuses, reclosers, etc)  Faults result in outages, blinking lights, voltage anomalies, and line loss  Faults also cause customer dissatisfaction, economic disturbance, and regulatory issues  Proper vegetation management minimizes faults from trees and animals and reduces customer and regulatory issues

Spoon River Electric Cooperative  Operates Vegetation Management program for three rural electric cooperatives in central Illinois  15 Vegetation Management employees split into two operation units  Use Esri GIS and handheld GPS to track and document the vegetation management program. This process involves several manual steps to get from the field to the database  Model uses linear referencing and route event table to describe the work

Spoon River Electric: Current Processes Planning process  Collect GPS points of locations where vegetation management is needed  Make handwritten notes about equipment, access, steepness, percent canopy, and special notes  Transcribe all handwritten notes into the GIS database  Print maps for the crews  Record keeping process  Collect GPS record of location  Indicate point number and work performed on written worksheet  Transcribe the work notes into the GIS database to mark the work that is completed  Calculate work footage for the board of directors report

Field Sheet

Database Structure ((Access+Truck+Chipper+Mower+Manual+Herbicide+Steepness )x Spans) x Canopy

Field Map

Prototype Design

 Design a survey for the cooperative managers in the Illinois electric cooperatives  Establish the current methods used at cooperatives in Illinois to budget, plan and complete vegetation management activities  Identify technology tools that are used for planning and documenting these activities  Identify the primary person responsible for managing these activities at each cooperative  Evaluate Commercial-off-the-shelf (COTS) solutions  Consider options for the server implementation  Cloud  In-house behind a firewall

Prototype Design  Create a paper prototype to identify a user friendly form for data entry  Evaluate this with current Spoon River employees

Prototype Design  Electronic prototype requirements:  Mobile by tablet or smart phone  Capable of disconnected editing  Capable of synchronizing with the distributed database when reconnected  Easy to use for employees in the field

Primary Information Products  Maps for communicating the work type and location to the field crews  Records showing daily progress and long term maintenance history  Estimates for work-units describing each substation or circuit

Product 1  This product should answer a job foreman’s question:  Where are the trees and what equipment will I need to clear them?

Product 2  This product should answer a line clearance manager’s questions:  Is the work completed?  When was it completed?  Were there any problems or concerns from the members that need to be documented?

Product 3  This product should answer a CEO or board of directors’ questions:  How long should this take?  How much will it cost?  How did we perform against our budget for this work?

Capstone Timeline  The timeline for this prototype/design phase is approximately six months.  Month seven will be dedicated to the conclusion of the design approach and preparing to share my results at Esri UC in San Diego.  I hope to have a working prototype to show for the conference.

Thank You! Questions?

References: g%2Fxpls%2Fabs_all.jsp%3Farnumber%3D g%2Fxpls%2Fabs_all.jsp%3Farnumber%3D software/

References: 1. “Utility Vegetation Management Final Report”; CN Utility Consulting, LLC; March “Beyond Status Quo”; Rick Johnstone; Vistas (a trade publication); accessed 11/09/ “The Economic Impacts of Deferring Electric Utility Tree Maintenance”; D. Mark Browning; Environmental Consultants, Inc.; April “Integrated Vegetation Management on an Electric Transmission Right-of-way in Pennsylvania, U. S.”; Richard H. Yahner and Russell J. Hutnick; Journal of Arboriculture; September “UAA Best Management Practices Funding”, Lynn Grayson ; accessed 11/09/ “Reliability Based Vegetation Management Through Intelligent System Monitoring”; B. Don Russell, Carl L. Benner, and Jeffrey Wischkaemper; Project T-27 Tele-seminar, 10/16/2007, accessed 11/09/2014