Remediation of Heavily Congested Urban Site Toronto, ON, Canada

Slides:



Advertisements
Similar presentations
CONSTRUCTION DRILLING INC.
Advertisements

Cofferdam.
CONSTRUCTION DRILLING INC. SPECIALIZING IN UNIQUE DRILLING AND CUT-OFF WALL SOLUTIONS.
Geosynthetics in Separation University of Strathclyde
Presented by Manuel Fernandez Environmental Engineer
Lorong Halus Interchange Introduction: Project to build a new $26 million interchange for the Tampines Expressway starting The site was situated.
Greenwich Peninsula.
Agrichemical Containment Facility. NRCS Standard Practice 702 NRCS Practice Standard 702 AGRICHEMICAL CONTAINMENT FACILITY MDA REG. 640 Commercial Pesticide.
Cytec Statement of Basis and Permit Modification July 16, 2012 Public Hearing Ohio Environmental Protection Agency.
Analette Ochoa, P.E., QSD/P, ToR, WRECO May 22, 2013.
Summary of Conceptual Design Site 3 Causeway Landfill Culvert Stabilization Marine Corps Recruit Depot Parris Island (CTO JM38) 19 August 2014.
Failure Case Study of Construction at a Solid Waste Site K. Madhavan, Ph.D., P.E., Dept. of Civil & Env. Engineering Christian Brothers University Memphis,
Wastewater Collection Options for Lakota Beach Area Sub-Basin Special Meeting June 27, 2001 John Bowman Lakehaven Utility District (253)
CONSTRUCTION OF SOIL NAILING WALLS
Groundwater Control Affects design of: –Permanent Works –Temporary Works May affect viability of scheme Safety Issues –May cause instability of excavation.
Public Information Meeting #6 City of Fargo Flood Risk Reduction Projects Rose Creek Coulee October 9, 2012.
GROUNDWATER CONTROL.
Project details • New headquarters for HKSB
Jasmit Bains and Jamie Laukaitis.  East Midlands - centre of the ‘Industrial revolution’  FACT : PRIDE - P artnership to R egenerate through I nnovative.
Foundations Excavations
Benefits of Precast Concrete Sound Walls over Alternative Products Case Study June 4, 2010.
Soils - HDM Chapter 9 All pictures from HDM Ch 9.
Foundations. Foundation supports weight of structure –Includes soil and rock under foundation –Building construction described by foundation type Slab.
SESSION 3 Subgrade This module presents the concepts and methods of characterizing the subgrade for the purpose of concrete pavement design. It also highlights.
Foundation Fundamentals GSD 6204 Building Technology Harvard Graduate School of Design.
Performance of Slag Pavements Prepared by Peter Rufford P E E C E.
BUILDING PERMITS. WHY DO YOU NEED PERMITS? Building permits allow your municipality to protect the interests of both individuals and the community as.
SOIL, GEOTECHNICAL ENGINEERING AND FOUNDATION ENGINEERING
SEMBODAI RUKMANI VARATHARAJAN ENGINEERING COLLEGE DEPARTMENT OF CIVIL ENGINEERING FOUNDATION ENGINEERING BY KARTHIVELU.
Sanitary Engineering Lecture 16
Foundation Engineering CE 483
Public Information Meeting Rehabilitation of Bridge No Flat Rock Hill Road over I-95 Old Lyme, Connecticut Rehabilitation of Bridge No Flat.
FSA Groundwater Flow and Solute Transport Model Presentation to Scottsdale Citizens Group March 19, 1999.
Introduction to Construction General Permit Inspections.
METAL FOUNDATIONS The strongest, most durable, most reliable and most cost-effective alternative to concrete foundations. You can add personalized information.
Sanitary Engineering Lecture 11. Storm Water Runoff Storm water runoff is the precipitation which seeps into the ground if precipitation occurs faster.
Department of Civil Engineering,
Latest Advancements in Instrumentation, Monitoring and QA/QC Techniques for Deep Excavation Support Systems: Al Hilal Project, Abu Dhabi – A Case History.
- Water beneath the Earth’s surface in sediment and rock formations.
Underground Stations Typical Station Site Plan. Underground Stations Ground Conditions: Key Issues.
Specification & Quantities Estimating Lecturer Maha Muhaisen College of Applied Engineering& Urban Planning.
Review of Current Conditions Report and Work Plan for Area 1 Presented by The Great Plains/Rocky Mountain Technical Outreach Services for Communities.
BCM 210 Foundation Issues- Fall 2000 refer to Allen Text
Site Work.
Modern GROUND IMPROVEMENT TECHNIQUES FOR HIGHWAYS
A REVOLUTION IN ROAD BUILDING
Marian Anderson Place Site Update City Commission Special Workshop December 14, 2015.
BUILDING CONSTRUCTION
COFFERDAMS.
SANKALCHAND PATEL COLLEGE OF ENGINEERING,
Sanitary Engineering Lecture 13
Soil mechanics and foundation engineering-III (CE-434)
CDP (Foxdale) Thursday, April 14, 2016 Item 12b Presentation in support of Applicant’s request to modify Special Condition No. 1.
DIAPHRAGM WALLS.
Bancroft Elementary School School Building Committee Meeting February 24, 2010.
Concrete Repair presented by: Amirhossein Jodeiri Mapua Institute Of Tecnology.
Deep Residential Basement, Chelsea. Toureen Plant Toureen Plant Toureen Contractors City Basements Groundworks RC Frames Groundworks RC Frames Petrol.
BY MOHANA.V CIVIL ENGINEERING FINAL YEAR - VII SEM.
Concrete Repair.
Town of Brighton, Department of Public Works
FE: Geotechnical Engineering
INTRODUCTION TO TRENCHLESS TECHNOLOGY
UTILITY VAULTS: THE PRECAST ADVANTAGE
4th Annual Construction Law Summit
Always Advancing Pervious
Factsheet: Proper Permanent Well Abandonment for Virginia Coastal Plain Wells VDH DEQ What is.
Investigation of pipeline failure
Friday 8 am St. Edward's University
Factors to Consider in Foundation Design Chapter # 02
Presentation transcript:

Remediation of Heavily Congested Urban Site Toronto, ON, Canada

Site Location Located in Toronto, ON – Canada’s largest city Situated in a densely populated, high traffic, mixed use (predominantly residential and commercial) neighbourhood

Site Location Former Gasoline Dispensing Station contaminated with hydrocarbons at depths of up to 14 meters below grade. A second gasoline dispensing station was located across the street causing contamination under the public roadways. Small site (approximately 1,000 m2) bounded on two sides (North and West) by major urban roads, a 12 storey condominium (East) and low rise retail (South). Major utilities in the road right-of-ways including gas, hydro, water, fibre optic telecommunication, storm and sanitary sewers. Many of the services were between 50 and 100 years old and were directly adjacent to the property boundaries Two stories of underground parking adjacent to the Eastern property line.

Underground Utilities Gas Storm Sewer Sanitary Sewer Water Mains Telephone and Fibre Optic conduits Electrical conduits Central Steam Distribution network

Geotechnical Conditions Highly disturbed soils to a depths of 6 m below grade (due to previous remedial excavation) overlying silt/clay till to 7mbg overlying saturated, unconsolidated sands to full depth. Water table at 8 meters below grade Sands becoming “flowing” or “boiling” at depths in excess of 8 meters below grade

Remedial Action Plan (RAP) Excavate contaminated soil to depth of up to 14.0 m below grade on three property linesinto “flowing” sand formation. Excavation methodology must allow flexibility due to unknown final depth of hydrocarbon contamination; Design and construct shoring to protect off-site public property and neighbouring parking structure with no anchors or tiebacks permitted off of the property; Design and install low-permeability barrier walls (<10E-8 m/s ) on west, east and north property boundaries between 6 and 14 m (max) below grade into the water table to ensure no re-contamination of the site from off-site sources (public roadways). Elevated vapour levels and hot-work required on-site

The Solution Installation of H-pile to 11mbg and lagging (inc. rakers) to 7mbg to shore excavation wall on N and E P/L Slurry slots excavations backfilled with low strength concrete from 7 to a maximum of 14 mbg on N and E P/Ls to remove impacted soil and provide hydraulic barrier Installation of caisson wall on W P/L to 11m below grade to support adjacent parade and provide hydraulic barrier Slot excavation of impacts at depth along caisson wall, backfilled with low strength concrete Wet excavation of entire central portion of site

H-Pile and Lagging 600 mm caissons open drilled to 11m, filled with H-pile and low strength concrete (4MPa) Whaler installed at grade and excavation between H-Piles completed with timber lagging Once at 4 mbg, rakers welded and set in 30 MPa concrete footings excavated at 6 mbg Bulk excavation completed to 6 mbg in north and east portion of site. Note: Entire site dewatered for three days (400GPM) to de-saturate fill soil that were placed on the site three years ago. Air vents in wall to supply clean air to restaurant, spiles held at grade using lock blocks, admixture compacted to 90% SPD. IOL THOUGHT THAT THIS SITE WOULD NEVER BE REMEDIATED – TOO DIFFICULT. UNTIL THEY MET US, THEY WERE NOT AWARE OF A CONTRACTOR WHO HAD THE CAPABILITES TO TACKLE THIS COMPLEX PROJECT.

Confidential Site, Toronto, ON - Bentonite Slurry, Concrete, Caisson Wall

Bentonite Slurry/Concrete Wall Slots excavated up to 14mbg using 5% bentonite slurry to shore excavation wall Slot backfilled with low strength concrete to provide impermeable barrier Alternating slot technique used with over excavation into adjacent slot to ensure continuous impermeable wall Bentonite mixed using shear pump to meet 45 second Marsh Cone viscosity test

Bentonite Slurry/Concrete Wall Notes: Grade beam complete undermined in upper right photo. Anchors and connection to grade beam mitigated beam rotation due to eccentric load on pile cap. Can also see the spiles under the exposed grade beam – kept excavation wall vertical (soil bentonite admixture is on the other side of the spiles)

Bentonite Slurry/Concrete Wall Advantages Allows for variable depth profiles Allows for installation in unconsolidated material Can be engineered for various design permeabilities (10E-6 to 10E-12 m/s) Concrete additives (bentonite) can lower permeability Wall thickness can be designed to meet required flow characteristics Mix design can provide concrete designs for temporary or permanent structural excavation or building support.

Critical Installation/Field Issues Bentonite Slurry/Concrete Wall Critical Installation/Field Issues Quality of bentonite will affect stability of slurry Proper field mixing and QA/QC of bentonite slurry is critical Entrained sediment will reduce viscosity of slurry in slot (ongoing testing required) When using slot techniques, over-excavation of low strength concrete is critical to ensure continuous barrier Slot depth measurement must be accurate to ensure design depth of barrier is correct

Caisson Wall Barrier Installation From 3mbg bench, 13, 600 mm dia. open boreholes were drilled on a specified spacing ~11mbg and filled an H-Pile and LS concrete to 3 mbg; H-Piles were used in select caissons to construct a shoring support wall Subsequently, 3 ‘filler’ boreholes were advanced between each of the 13 previously drilled, reinforced and filled boreholes Filler’ boreholes were drilled with a minimum 0.1m overlap into the adjacent caisson and filled with LS concrete; ’filler’ borehole 2 was drilled first, followed by ‘filler’ boreholes 1 and 3 A whaler was installed at 4 mbg to further stabilize the cantilevered wall Bulk excavation was continued to ~8mbg, with slots excavated and backfilled to 11mbg with LS concrete.

Caisson Wall Barrier Installation

Caisson Wall Barrier Installation Advantages Solid structure, cantilevered excavation wall support system can be advanced right at property line no off-site encroachment or agreements necessary no rakers required (simplifies backfilling) Shoring excavation support and impermeable barrier installed simultaneously Low strength concrete can be easily excavated for site servicing (vs. pulling H-piles and lagging)

Critical Installation/Field Issues Caisson Wall Barrier Installation Critical Installation/Field Issues QA/QC of caisson locations is critical to ensure correct overlaps Auger/caisson advancement must be closely monitored for plumb, particularly for deep barrier walls as off-plumb alignment will cause gaps in the barrier wall Soils should be free of large obstructions as augers will drift off-plumb Soils should be sufficiently consolidated so that augers do not drift off-plumb when advancing ‘filler’ boreholes

Final Excavation

Final Excavation