1 ISE 311 - 9 Macroergonomics The analysis, design, and evaluation of work systems. Concerned with the ‘human-organization’ interface. Top-down approach.

Slides:



Advertisements
Similar presentations
SCO 3 Crewing Optimization As-Is Processes January 9, 2006
Advertisements

Culture and Leadership
Objective of HR Strategy
Unit 2 Manufacturing Operations Sections: 1.Manufacturing Industries and Products 2.Manufacturing Operations 3.Production Facilities 4.Product/Production.
© 2013 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
CAPACITY LOAD OUTPUT.
Operations Management Aggregate Planning Chapter 13
3. Aggregate Planning. Aggregate Planning  Provides the quantity and timing of production for intermediate future Usually 3 to 18 months into future.
PRODUCTION AND OPERATIONS MANAGEMENT
Manufacturing’s Objectives
Management: Analysis and Decision Making
The Nature of Management Lecture #1. Characteristics of Organizations  Combining of individual efforts in pursuit of certain common purposes or organizational.
HOSP2030 Hospitality Human Resource andDiversity Management HOSP2030 Hospitality Human Resource and Diversity Management Paul Bagdan, Ph.D.
Self-Directed Work Teams P.E. Clayton and Associates, Inc.
Chapter 9 Capacity Planning 2000 by Prentice-Hall, Inc.
PART TWO EMPLOYMENT Chapters 5-7.
Development Processes and Product Planning
Chapter 7 Administration of the Fire Department
Chapter six Variable Costing: A Tool for Management.
ORGANIZATIONAL STRUCTURE
Foundations of Organization Structure
© 2007, Educational Institute Chapter 1 The Supervisor and the Management Process Supervision in the Hospitality Industry Fourth Edition (250T or 250)
© 2011 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
CCSB223/SAD/CHAPTER141 Chapter 14 Implementing and Maintaining the System.
Lecture No 09 The Internal Assessment
1 Slides used in class may be different from slides in student pack Chapter 16 Aggregate Sales and Operations Planning  Operations Planning Overview 
Aggregate Planning and Resource Planning Chapters 13 and 14.
Foundations of Organizational Structure What Is Organizational Structure?  Organizational Structure – How job tasks are formally divided, grouped,
Principles of Operations Management
Chapter 2 Introduction to Cost Management Systems
Operations Management
© The McGraw-Hill Companies, Inc., Technical Note 4 Job Design and Work Measurement.
CS 111 – Nov. 22 Chapter 7 Software engineering Systems analysis Commitment –Please read Section 7.4 (only pp ), Sections –Homework #2.
1 OMGT 4743/6743 Aggregate Production Planning (APP) Matches market demand to company resources Plans production 6 months to 12 months in advance Expresses.
© 2008 Prentice Hall, Inc.13 – 1 Operations Management Chapter 13 – Aggregate Planning PowerPoint presentation to accompany Heizer/Render Principles of.
Aggregate Planning Chapter 13. MGMT 326 Foundations of Operations Introduction Strategy Managing Projects Quality Assurance Facilities & Work Design Products.
Chapter 11: Building Community Capacity to Take Action Operation: Military Kids Ready, Set, Go! Training.
Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall 1-1 Organizational Theory, Design, and Change Sixth Edition Gareth R. Jones Chapter.
Work Team Mobilization Methodology No. M3 August, 2000.
CHAPTER SIX Budgeting. McGraw-Hill/Irwin © 2003 The McGraw-Hill Companies, Inc., All Rights Reserved. 6-2 Outline of Chapter 6 Budgeting  Generic Budgeting.
Nutrition 564: Management/ Leadership. What is management? Nutrition 564: Management Working with and through other people to accomplish the objectives.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 10 Aggregate Planning and Master Scheduling
CHAPTER 8 CAPACITY. THE CONCEPT Maximum rate of output for a process Inadequate capacity can lose customers and limit growth while excess capacity can.
12-1Aggregate Planning William J. Stevenson Operations Management 8 th edition.
EVALUATING AND REWARDING TEAMS Chapter 16. EVALUATING AND REWARDING TEAMS  An important way to motivate teams is through performance evaluation and reward.
ISE 3111 Macroergonomics The analysis, design, and evaluation of work systems. Concerned with the ‘human-organization’ interface. Top-down approach concerned.
Chapter 19: Social factors
Chapter 6 Managing Capacity
© The McGraw-Hill Companies, Inc., Technical Note 4 Job Design and Work Measurement.
12-1Aggregate Planning William J. Stevenson Operations Management 8 th edition.
MGT 450 – Spring, 2016 Class 4 – Chapter 3 Effective Leadership Behavior.
Variable Costing: A Tool for Management
Copyright © 2014 by McGraw-Hill Education (Asia). All rights reserved. 13 Aggregate Planning.
Chapter 13 Aggregate Planning.
Planning and Organizing Chapter 13. The Planning Function Planning for a business should stem from the company’s Business Plan – The business plan sets.
Human Resource Management Lecture 2 MGT Last Lecture Title and Course Code Introduction Text Book Chapters (Course Topics) What is HRM (managing.
McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights reserved.
Job Design and Work Measurement
McGraw-Hill/Irwin ©2009 The McGraw-Hill Companies, All Rights Reserved
Operations Management
IENG 451 / 452 Stability: Total Productive Maintenance
13 Aggregate Planning.
Operations Management
Dr Sh Salleh bin Sh Ahmad
Operations Management
Operations Management
Operations Management
Manufacturing’s Objectives
Aggregate Production Planning (APP)
Presentation transcript:

1 ISE Macroergonomics The analysis, design, and evaluation of work systems. Concerned with the ‘human-organization’ interface. Top-down approach concerned with:  Personnel subsystems  Technology subsystems  Organizational structure  External environment Key issues of concern:  How do organizational constraints affect how people work with machines (i.e., human-machine systems)  What factors come into play when people work together in groups?

2 ISE Six Ergonomics Guidelines 1. Plan the work, then work the plan. 2. Reward results. 3. Optimize system availability. 4. Minimize idle capacity. 5. Use filler jobs or filler people. 6. Communicate information.

3 ISE In-class assignment Assume you are planning to start a new fast-food business designed to be both customer-friendly AND worker-friendly. Your mission statement includes, among other things, a pledge to use the principles of macroergonomics as a guiding force for the business. 1.Work in groups. a. Approach the problem from the perspective of specific guidelines outlined in chapter 8. b. As we discuss each guideline, you will be given a chance to work together to develop recommendations for the business. c. Your deliverables include a list of one or more ideas and suggestions.

4 ISE G1. Plan the work, then work the plan Plan the Work 1. List goals. 2. Set goal priorities. 3. Make a “to do” list. 4. Set activity priorities. Work the Plan 1. Start with A’s, not with C’s. 2. Do it now. 3. Cut big activities into bits.

5 ISE G2. Reward results Get people to work hard and smart. Types of motivation:  Positive Internal (self-motivation) External  Financial  Nonfinancial  Negative

6 ISE G3. Optimize system availability Availability = Uptime ÷ Total Time Strategies to improve availability:  Increase uptime. longer production runs increase reliability (MTBF)  Decrease downtime. decrease voluntary downtime increase maintainability (MTR)  Make loss of availability less costly. preventive maintenance partial function

7 ISE G4. Minimize idle capacity Fixed Costs  Annual cost of many machines and people varies little with output.  Solutions: Operate more hours/year. Use pools. Revise work schedules. Encourage off-peak use. Variable Costs  Some team members are more expensive than others.  In the U.S. the expensive part of the team is usually human labor.  Solutions: Duplicate components. Idle low-cost components (use double tooling). Do not use one on one.

8 ISE G5. Use filler jobs or filler people Problem: Match worker time to job requirements. Strategies: 1. Adjust the workload but keep the workforce constant. a. Break longer jobs into shorter jobs. b. Do short, low-priority jobs during idle time. c. Use scheduling to decrease idle time. d. Assign more work to subordinates than they have time to do.

9 ISE Strategies (continued) 2. Adjust the Workforce a. Use staggered work times. b. Use temporary workers. c. Use part-time workers.

10 ISE G6. Communicate information Provide job instruction or training. Provide command and control: short messages that trigger behavior patterns.