Slides:



Advertisements
Similar presentations
HOT & COLD WATER SYSTEMS
Advertisements

Please click on our logo or any link in this presentation to be redirected to our website & . Thank You! 17A Marlen Drive Hamilton, NJ USA Tel:
For all your Beverage & Packaging Needs Industrial Mechanical Automation Ltd.
Institute of Energy & Sustainable Development De Montfort University
The Miracle Coating! Polycoat 750D What is it?.
Above Ground Storage Tanks &
Plant Operations. Throughput & Waste Types 2 Process Trains equating to 40,000 tonnes pa Expansion to 3 Trains will give 60,000 tonnes pa Hazardous and.
BEST ENGINEERING TECHNOLOGIES (An ISO 9001:2008 Certified Company) Plot No.69/A, /13, Rajiv Gandhi Nagar,
Asphalt Concrete Mix Design and Construction
Hot Mix Asphalt Production Chris Lange PMP, Pr.Tech.(Eng) Director (Technical) Much Asphalt (Pty) Ltd Road Pavement Forum: 10 th April 2006.
WAM Foam: asphalt pavements at lower temperatures WMA TWG, 12 December 2007, Hunt Valley - MD.
Concrete & Asphalt. Concrete –Batching – process of proportioning cement, water, aggregates and additives prior to mixing concrete –Concrete specs usually.
Introduction Transition of Management Initial Challenges Revival and Restoration Production for 2013 Year 2014 Major Works Production Mobile plant Projections.
Larry Behan Construction – Auction Tuesday 14 th September 2010 – Dublin Plant 2 Marini MAP Serial No /99.
HMA PLANT OPERATION. Types Of Plants BATCHDRUM MIXER.
HMA PLANT OPERATION. Types Of Plants BATCHDRUM MIXER.
Power Plant Construction and QA/QC Section 5.2 – Combustion Control and Burner Management Engineering Technology Division.
1 Copyright © The McGraw-Hill Companies, Inc. Permission required for reproduction or display. Chapter 15 Asphalt Mix Production and Placement.
Lei NA Xiaolong Chen. Historical Background  In 1956, Basin F was constructed by the Army in the northeast section of RMA in Colorado.  It was designed.
So Cal Alliance of POTWs Energy Management/Biosolids Committee
Assistant Professor of Construction Trades Technology Michael Hirt ~ University of Alaska Fairbanks 3 Ways to Transfer Heat Hydronic Heating (hot water.
Total Clean Concept Algae ponds Retort Distillation tower Power plant Algae harvest Fiber Board & Foam Concrete Product tanks Coal in Char to plant Surge.

MPE Workshop 14/12/2010 Building 107- project Raphaël Berberat
New Electrical Apparatus, and Automation Products. American Owned & Operated PHONE: (810)
The art of Engineering ERZİNCAN - TR 4 x 2.960KWe ~ 12 MWe HFO-DIESEL POWER PLANT WARTSILA 8R 32D Type  KWe VASA  Duel Fuel ( Diesel Oil / H.Fuel.
PROCESSING OF ANIMAL BY-PRODUCTS. We are an engineering firm: Our main consumers handle with waste – animal waste, communal waste as well manufacturers.
Presentation By Dr.Muhammad Salim Site Incharge Underground Coal Gasification, Project Thar.
Waste Water Treatment Plant (WWTP) Commissioned: Jan 2008 Capacity: 300k 2500mg/L discharge Krofta Waters Technology Ltd.
Gas Turbine Power Plant
HKCI Seminar HKCI Seminar HKCI Seminar Hongkong 28 . December 2012
Desuperheaters on Residential Air-Source Heat Pumps
Power Plant Construction and QA/QC Section 5.4 – Key Systems and Components Engineering Technology Division.
Cloze #36 Hot Air Balloon. This is h_ _ air balloon. This is hot air balloon. It is f _ _ _ _ _ with hot air. It is filled with hot air.
1 Reclaimed Asphalt Pavement in Arizona - Application and Verification October 3, 2008 Arizona Association of County Engineers.
Kerry O’Neill Director.
1 Mechanical for Oil Heat Mechanical codes. 2 Every state has codes. They may be the same in some states, but different in other states. Always have a.
Slag Charging Bin with Grizzly (to Conveyor) Slag Material Flow.
Midea Water Dispenser. Water Dispenser 1 FEATURES TYPE Table Top Style COMPRESSOR BRAND DANFU POWER SUPPLY 230V+-10%,50HZ NUMBER OF FAUCETS 2 COOLING.
Computing Facilities CERN IT Department CH-1211 Geneva 23 Switzerland t CF CERN Computer Centre Consolidation Project Vincent Doré IT Technical.
United States Fire Administration Chief Officer Training Curriculum Operations Module 17: Grain Elevator Simulation Exercise.
Biscuit baking process and engineering
Company Providing service in the sector of nuts and snack processing machinery, Mr.Ahmet Yılmaz withdrew from partnership with over 30 years' experience.
3.3 Radiation In cold countries, solar hot water systems are often used to heat a house. In a typical solar hot water system, water from a storage tank.
Dipl. Ing. Ralf Port 28th of February 2013 C R O A T I A N A S P H A L T A S S O C I A T I O N O R G A N I S E S S E M I N A R RE-USE / RECYCLING OF CONSTRUCTION.
Progressive Energy, Environment, & Sustainability Summit 17 Denver, CO Compressed Air - What a Waste! Presented by: September 17, 2013.
LCLS-II Cryoplant Overview
Sorbent Handling Plant by NHI-Design & Equipment Specifications
Limestone Handling System
Gypsum Dewatering System
First of all
AIR CONDITIONING SYSTEM
TCL WATER DISPENSERS 2017.
Cryoplant Installation Scope
Chemical Engineering Drawing
Limestone Handling System
Gas Power Plant - Layout and Operation
Status of Cryogenics Facilities Design
Asphalt Drum Mix Plant. What is Asphalt Drum Mix Plant ? Asphalt Drum Mix Plant is an uninterrupted mixer in which heating of aggregates, its consistent.
High Performance Regulating Valve Manufactured by Maniks
Evaluate the integral using the indicated trigonometric substitution {image} {image}
Kyosuke Fukuhara City of Yokohama
Does the Charge (kW) or the Discharge (kWh) drive the Cost
Pt. hydrocarbon enhancement chemistry
SDEM ROADS AND INFRASTRUCTURE LIMITED
Concepts for Sustainable fuel solutions
Water Dispensers RRP: 189€ RRP: 169€ TY-LWYR33 RRP: 139€ TY-LYR70
Organics Waste Processing Facility Construction Progress Update July 8, 2011
AIR COMPRESOR Chapter-13.
DP: € 72 DP: € 95 Tcl Water Dispensers TY-LYR70 TY-LWYR63T/WW
Presentation transcript:

Larry Behan Construction – Auction Tuesday 14th September 2010 – Dublin Plant 1 – Dismantled, Location : Rathcoole, Co.Dublin Marini – MAP Serial no. CO 276/95 Partially Dismantled, This Plant has worked approx 50 hrs since it was installed in Dublin Airport in June 2008 Some new sections installed at that time, see below for more details. 7 x Cold storage bins, Feeder conveyors, Brand new dryer, Filler house, Chimney stock, Filler Silo, Control Room, Diesel Tank, 4 x Hot Storage Bin, Cold Storage/Reject Bin Skip, Bitumen Storage Tanks x 2 (30ft capacity), Brand new burner, All motors either new or re-conditioned, New waste filler mixer, Reconditioned mixer, Compressor, Air storage, Air dryer in steel container.