Contaminated Land Changes to the Regime & Future Implications for Effective Regulation Dr Bill Baker Independent Environmental Consultant Contaminated.

Slides:



Advertisements
Similar presentations
Project Appraisal Module 5 Session 6.
Advertisements

PLANNING AND RADIOACTIVE WASTE Nuleaf Seminar– Radioactive Waste Management Mark Plummer, Minerals and Waste Planning, Department for Communities and Local.
A Neighbourhood Plan for Winsford. Localism The time has come to disperse power more widely in Britain today Localism Agenda – the Big Society – reduced.
Infrastructure Planning Commission Workshop 2b Working with the IPC: Guidance and issues for promoters.
Laura Wood Team Leader –Strategic Planning 16 th February 2015 Little Gaddesden Parish Council Meeting.
Interested in Neighbourhood Planning in Cotswold District?
Localism and Neighbourhood Planning District, Town and Parish Council Event January 9 th :00 – 20:00.
1 The Care Act and Social Care Markets July 2014.
9 th Annual Public Health Finance Roundtable November 3, 2012 Boston, MA Peggy Honoré.
Your head on a block-Part 2A decisions Dr Naomi Earl Associate Director Head of Human Health Risk Assessment Land Quality Atkins Limited
ENVIRONMENTAL MANAGEMENT PLAN
1 Regulatory Impact Assessment: Methodology and Best Practices David Shortall INMETRO International Workshop on Conformity Assessment Rio de Janeiro, Brazil.
Protection Against Occupational Exposure
Planning and Localism – How it can work for you John King Friends of the Peak District
Internal Auditing and Outsourcing
National Planning Policy Framework. 2 Planning reform: main aims Put power in the hands of communities - with policy that is radically streamlined and.
Professor Kenneth C Ross Partner Brodies LLP. Historical background Who pays? Law Society leaflet “Recent clarification of Law Society advice Why is this.
National Planning Policy Framework Member Briefing 1 st May 2012 Mark Russell Planning Advisory Service.
Guidance for AONB Partnership Members Welsh Member Training January 26/
Mid Wales LTP Stakeholder Workshop 3 rd October Presentation by Ann Elias and Janice Hughes.
Screen | 1 EPA - Drivers for Regionalisation Max Harvey Director Operations Environment Protection Authority Presentation, reference, author, date.
Thriving Third Sector: Vision for Civil Society Les Hems GuideStar Data Services.
Health and Safety Executive Health and Safety Executive Competent Authority & Data Reporting HSE/DECC Consultation Events - Spring 2014 EU Offshore Directive.
1 The Care Act and Social Care Markets June 2014.
Getting Started Conservation Coaches Network New Coach Training.
TEN-T Experts Briefing, March Annual Call Award Criteria.
Consideration for Stakeholders Regarding Hazard Identification and Risk Assessment as Part of the MSD Prevention Strategy for Ontario Richard Wells University.
Graduate studies - Master of Pharmacy (MPharm) 1 st and 2 nd cycle integrated, 5 yrs, 10 semesters, 300 ECTS-credits 1 Integrated master's degrees qualifications.
REGIONAL GOVERNMENT The South East England Regional Assembly (SEERA or the Assembly) –Representative voice of the region. –Covers nine areas: Berkshire,
Review of Sub-National Economic Development and Regeneration.
Neighbourhood Planning. What is neighbourhood planning? Neighbourhood planning gives communities direct power to develop a shared vision for their neighbourhood.
STRATEGIC ENVIRONMENTAL ASSESSMENT METHODOLOGY AND TECHNIQUES.
Deeds not words How recent revisions to the Statutory Guidance have weakened the protection provided Howard Price, Principal Policy Officer, CIEH.
Contaminated land in England UKELA Seminar, Belfast October 2011 Andrew Wiseman Head of Environmental Law.
Risk Management & Corporate Governance 1. What is Risk?  Risk arises from uncertainty; but all uncertainties do not carry risk.  Possibility of an unfavorable.
Planning After the Localism Act.
Society of Local Council Clerks Northampton, 21 June 2012 Sylvia Brown Chief Executive, ACRE Localism Act – local impact.
56th Regular Session of the IAEA General Conference
Infrastructure Development Bill [B ] Submission by the Centre for Environmental Rights to Portfolio Committee on Economic Development 14 January.
National Planning Policy Framework Based on Consultation ended 17 th October Issues affecting Local Councils.
Varteg Hill – Coal Recovery and Land Reclamation Pre-Application enquiry by Glamorgan Power Ltd. Members Seminar 31/3/14.
The Principles Governing EU Environmental Law. 2 The importance of EU Environmental Law at the European and globallevel The importance of EU Environmental.
Richard Moules A Look into the Future for Contaminated Land.
Introduction to SEPA The Scottish Environment Agency For CaSPr Waste Workshop Glasgow 19 October 2006 Claudette Hudes NetRegs Team Leader.
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
Win Win Win: can we have regulation that protects people, supports business and costs less? Graham Russell Director Better Regulation Delivery Office.
MJAC Founded 1928 Contaminated Land Update 27 th March 2015 Worcester T
International Atomic Energy Agency Regulatory Review of Safety Cases for Radioactive Waste Disposal Facilities David G Bennett 7 April 2014.
Bradford Property Forum LOCALISM AND BRADFORD’S PROPERTY MARKET Matthew Sheppard, Turley Associates.
Muston planning for Bath & North East Somerset Council 3 June 2015 Councillor Training – Planning Mike Muston – Muston Planning.
SEA in New Zealand1 Developments on Two Converging Paths Martin Ward, Independent Advisor, New Zealand.
MJAC Founded 1928 Contaminated Land Update 3 rd October 2014 Walsall T
Civil Contingencies Act and Risk Management ALARM South East 11 th MAY 2005 Prepared by Carolyn Halpin Chairman ALARM, t he National Forum for Risk Management.
Commissioning Support Programme Post-16 Commissioning David Brown NASS Conference 9 th October 2009.
Company LOGO. Company LOGO PE, PMP, PgMP, PME, MCT, PRINCE2 Practitioner.
Why do we need more housing? The East Midlands Regional Plan is still in force, which requires 510 houses to be built per annum between 2006 and 2026 Although.
1 Scrutiny for Policies and Place Committee 19th April Planning System Reforms Alyn Jones, Interim Director of Economic & Community Infrastructure Operations.
Planning changes & challenges Steve Barker Principal Consultant January 2016www.pas.gov.uk.
MHPP Forum James Shuttleworth Planning and Infrastructure Manager, MCC 9 December 2015 Greater Manchester Spatial Framework.
Update on planning reform. DCLG Priorities 2 The key DCLG priorities focus on: Driving up housing supply Increasing home ownership Devolving powers and.
SUSTAINABILITY TESTING. Phillip Rowson Development Manager Development Management Team.
Middle Managers Workshop 2: Measuring Progress. An opportunity for middle managers… Two linked workshops exploring what it means to implement the Act.
An introduction to Neighbourhood Planning Rowena Tyler, Community Development Officer.
Neighbourhood Planning in Haringey Myddleton Road Strategic Group 7 th November 2013.
IPPC A general overview Nigel Barraclough Policy Adviser Industrial Pollution Control Branch Air and Environment Quality Division. Taiwanese Environmental.
The National Planning Policy Framework: what it means for you.
Infrastructure planning and management
Neighbourhood Planning
IAEA General Conference Regulatory Cooperation Forum Regulatory Approach Prescriptive vs Performance Based David Senior Executive Director -
Nick Bonvoisin Secretary to the Convention on the
Presentation transcript:

Contaminated Land Changes to the Regime & Future Implications for Effective Regulation Dr Bill Baker Independent Environmental Consultant Contaminated Land Adviser to the Chartered Institute of Environmental Health

Scope of Presentation Brief history of land contamination regulation Part 2A consultation, development & introduction 2000 Review of application & experience Early mistakes – SPOSH or Minimal Risk SGV Task force – Way forward2005/06 LQM/CIEH Initiatives – GAC workshops2006/09 Defra changes2007 New Government – deregulation and localism policies2010 LQM/CIEH SPOSH workshop - dose response road-maps2011 Revised Statutory Guidance2012 National Planning Policy Framework2012 Need for replacement environmental guidance – pps 23 etc Causes for concern - new strategies

Part 2A development Environmental Protection Act Environment Act – 1995 – section 57 Introduction – Statutory Guidance – 2000 CLEA - Environment Agency – 2002 Development of risk –based approach, toxicology, exposure scenarios etc Minimal risk SGVs – not SPOSH values for determination Slow Agency progress with SGV and Tox report publication CRISIS !!

Part 2A Crisis Cabinet Office - SGV Task Force2005/06 Extensive consultation with consultants, academics, regulators and industry led by Defra team of specialist advisers “Way Forward” - CLAN6/06 – proposed a set of benchmarks for unacceptable intake derived from consideration of toxicology, exposure scenarios, national risk assessment policy and practicability check – 2006 Further consultation - long delays with no decisions made 2007 – Complete change of Defra team

Revised Part 2A Statutory Guidance More delay – silence Caretakers – new Defra team Concern at determinations based on marginal exceedance of SGV/GAC s, delays in progressing declared sites – community concern and blight Guidance on Legal definition of Contaminated Land –no new values 2008 New proposed revised Statutory Guidance – consultation Dec March 2011 – introduced April 2012

Revised Part 2A Statutory Guidance Background “Uncertainties associated with technical & scientific assessment of to human health are generally considered to be so high that a defendable quantitative assessment can rarely be made” “Scientific & legal difficulties of the development of contaminant SPOSH values are considered to be insuperable” Nevertheless local authority regulators are expected to use their expertise and experience to make scientifically-based judgements for Part 2A determinations without the guidance presumed to be necessary in the originally conceived regime.

Revised Part 2A Statutory Guidance Defra motivation for changes Clarity in precautionary and proportionate regulatory approach to decision making on determination of land. Simplification of regulatory procedures. Priority on dealing with high risk highly contaminated land. Balance between dealing effectively with risks from contamination and potential impacts of financial costs, health and environment, impacts of taking remedial action, property blight and burdens on affected people. Reducing the costs of unnecessary remediation.

Revised part 2A Statutory guidance Categorisation of land affected by contamination 1 & 4 Category 1 – SPOSH condition exists with unacceptably high probability of harm – capable of part 2A determination if :- similar land, situations or degrees of exposure are known or strongly suspected to have caused such harm in the UK or elsewhere; if significant harm may already have been caused by contaminants in, on or under the land & that there is a an unacceptable risk that it might continue or occur again if no action is taken; it is likely that significant harm is being caused but it is considered that there is insufficient evidence to be sure of meeting the “balance of probability” test for demonstrating this is so, or that such would cause unreasonable delay the time needed to demonstrate, cost, or disruption and stress to affected people particularly in cases involving residential properties. Category 4 – A SPOSH condition is unlikely to exist on land if it is considered that there is no risk or that the level of risk associated with an contaminants present is low. The following types of land can be considered to be classified as Category 4 land :- land where there is no relevant contaminant linkage ; land where there are only normal levels of contaminants in the soil; land where contaminant levels do not exceed relevant generic assessment criteria; land where estimated levels of exposure to contaminants are likely to form a small proportion of what a receptor might anyway be exposed to through other sources of environmental exposure.

Revised part 2A Statutory guidance Categorisation of land affected by contamination – 2 & 3 Category 2 land is such that there is a strong case for considering that the risks from the land are of sufficient concern that it poses a significant possibility of significant harm (SPOSH). It may include land where there is little or no direct evidence that similar land, situations or levels of exposure have caused harm before, but it is considered on the basis of the available evidence, including expert opinion that there is a strong case for taking action under part 2A on a precautionary basis. Category 3 land where the strong case described above for Category 2 classification doses not exist and therefore the test for significant possibility of significant harm (SPOSH) is not met. Category 3 may include land where risks are not low, but nonetheless the authority considers that regulatory intervention is not warranted.

Guidance for categorisation with respect to other receptors Ecological systems – a table has been developed to describe what conditions represent Significant Harm and Significant Possibility of Harm (SPOSH) for a range of ecologically protected sites to facilitate the effective regulation of such sites affected by contamination in such a way as to satisfy the relevant regulations. Property Effects – similarly there is a table describing the crops, livestock and buildings covered by the Part 2A regime and what is seen to represent Significant Harm and SPOSH relative to these receptors. Pollution of Controlled waters – the guidance identifies 4 types of pollution of controlled waters which can be defined as to represent significant pollution of controlled waters, and three types of circumstance which should not be considered to be contaminated land on water pollution grounds. There is also guidance about the categorisation of land where there is or may exist a Significant possibility of Significant Pollution of Controlled Waters where regulatory action under the Part 2A may or not be considered in consultation with the Environment Agency.

Development of Category 4 Screening Levels for assessment of land affected by contamination An essential condition for the introduction of the proposed revised Part 2A Statutory Guidance was that there must be a prospect of a financial advantage to industry or the community arsing from its implementation. The main component of such an analysis was concerned with the perception that the generally accepted procedure for the protection of human health and the environment in the context of remediation of land contamination either arising from Part 2A regulation or through the planning process using the SGV/GAC minimal risk levels as remediation targets led to a high degree of “unnecessary” remediation and excess costs. An essential part of the Defra strategy was therefore to develop a new set of Category 4 Screening Values which would be more pragmatic( but still strongly precautionary). These would effectively expose communities to a higher level of risk than generally accepted but result in national estimated savings for the industry of £140m. A contract has been let to CLAiRE for this purpose but it is generally accepted that such a development is unlikely to be feasible if based upon a scientific basis and would therefore require a policy decision about what level of risk would be acceptable for local communities. Such a development would be unpopular amongst local communities, and house- builders would also be reluctant to be responsible for new developments which left them with a higher residual liability.

Consultation responses and post consultation guidance development The consultation response drew a large proportion of adverse comment generally but particularly from the regulatory communities and the representatives of those who are charged with managing the regulation of land contamination in the context of both Part 2A and the planning process. In this situation Defra sought further advice and support for its proposals from a small group of supporting bodies and consultants to refine the guidance but excluded any significant engagement with those who took a dissenting and critical position. A process managed by officers ( Career Civil Servants)having little or no scientific background or understanding of the most complex regulatory environmental protection regime is most likely to settle for a pragmatic strategy which is unlikely to be successful rather than soundly science- based solutions

Summary of Issues of Concern Determination under Part 2A should be primarily science-based – but under the revised SG the decision can be qualified by a range of socio- economic circumstances detailed previously. Decision by EA & Defra not to support research into quantitative understanding of SPOSH conditions and reducing uncertainty – “Scientific difficulties are insuperable”. Determinations are now relegated to merely qualitative decisions. Decisions dependent upon “knowledge of similar land or situations which are known or strongly suspected to have caused such harm before”. The general acceptance that normal or background levels of contaminants should not be considered as representing a significant risk. The new SG does not meet its stated objectives of being “ shorter, simpler or better focused" but is likely to result in a deterioration in the general level of protection of human health by the introduction of the proposed new higher risk category 4 “acceptable screening levels”

The National Planning Policy Framework Government Motivation Deregulatory policies The Localism policy which aims to delegate decision-making to the lowest representative level The primacy of local & neighbourhood plans Reduction of bureaucracy, “red-tape” and unnecessary administration More freedom for enterprise and developers Promotion of economic growth

“Old” planning policy aimed to avoid demonstrable harm. The LPA needed to show that there will not be unavoidable consequences from any development planning policy still follows this line, but aims to encourage development to deliver positive outcomes. ENVIRONMENTAL PROTECTION & IMPROVEMENT SUSTAINABLE PLANNING ECONOMIC SUCCESS SOCIAL COHESION Requires respect for all three agendas. The onus is upon the applicant/developer to provide the justification. Established Planning Policy

Some Quotes – “Town hall officials who take forever with those planning decisions that can be make or break for a business – and the investment and jobs that go with it” David Cameron, Prime Minister – “If I am being completely frank … it’s the drag anchor to growth” Eric Pickles, Secretary of State for Communities and Local Government – “We want local communities to benefit from growth, and the standard answer to be yes, not no” Vince Cable, Business Secretary

Extract from Chancellor’s Budget speech in section called ‘Planning for Growth’: – “The planning system has a key role to play … ensuring that the sustainable development needed to support economic growth is able to proceed as easily as possible” – “The Government's top priority in reforming the planning system is to promote sustainable economic growth and jobs. Government's clear expectation is that the answer to development and growth should wherever possible be "yes", except where this would compromise the key sustainable development principles set out in national planning policy.” – “Secretrary of State for Communities and Local Government … will attach significant weight to the need to secure economic growth and employment.” – “[so will the] SoS for Culture, Olympics, Media and Sport, the SoS for the Environment, Food and Rural Affairs, the SoS for Energy and Climate Change and the SoS for Transport.”

Initial “Radical Changes” -Abolition of the Standards Board - responsible for the monitoring & regulation of the relationship between Councillors & developers - Central Government targets – Scrapped with immediate effect e.g. 3m new houses by 2020, 2m by 2016 – Regional Spatial Strategies – Scrapped with immediate effect Split national targets into regions – Government Offices for the Regions – Scrapped by 2011 Worked out how to deliver the regional targets – Infrastructure Planning Commission – Scrapped by 2011 Forward planning issues for infrastructure of ‘national importance’, to be subsumed into CLG

Principles of the National Planning Policy Framework Presumption in favour of Sustainable development involving economic, social & environmental considerations Presumption of approval for all planning applications ( unless they can be proved to be not sustainable) Withdrawal of all regional strategies Withdrawal of 44 pieces of published planning guidance documents to be replaced by simplistic 50 page Policy framework Primacy of local & neighbourhood plans Application of the precautionary principle Abolition of the National Brownfield Development policy on Housing

Application of Localism  Open Source Planning (Conservative ‘Green Paper’ No 14) is being followed: – This will “Free” LAs from top down central control & encourage local authorities to work together to resolve issues – give neighbourhoods much greater ability to determine the shape of the places in which their inhabitants live Each community to develop “Neighbourhood Development Plan” to shape area. When done LAs will have to honour them Developers must consult before planning application and show how the elements of the NDP have been substantially taken into account  So far this has been blamed (along with RSS withdrawal) for planning applications for some ~85,000 houses being withdrawn  Been called a NIMBYs charter  BANANA – Build Absolutely Nothing Anywhere Near Anything ( or Anyone!)  NOPE – Not On Planet Earth

Reduction in Bureaucracy “Reduction in bureaucracy” by: – New duty of cooperation on LAs (and other public bodies) to work together – 12 month guarantee for any planning application to be determined, including appeals made in a “timely fashion” – Scrapping change of use planning permission for turning premises and old houses into houses ( with big implications for contamination issues!) – A “Neighbourhood Development Order” as established in the “Neighbourhood Development Plan” will grant automatic planning permission for any type of development if local referendum approves it. What is “local”? There are certain guidelines to which the development will have adhere, e.g. design standards, buildings regulations, etc – 60% target of new residential housing on Previously Developed Land has been scrapped – Recent abolition of need for planning approval for domestic extensions

Reference in the NPPF text about dealing with contamination  Contamination covered as follows: – “Local planning authorities should... set out environmental criteria, in line with the policies in this National Planning Policy Framework, against which planning applications will be assessed so as to ensure that permitted operations do not have unacceptable adverse impacts on the environment or human health, including from dust, tip and quarry-slope stability, differential settlement of quarry backfill and migration of contamination from the site”  Pollution covered as follows in: – “Natural and local environment” conservation by “prevent[ing] both new and existing development from contributing to or being put at unacceptable risk from, or being adversely affected by unacceptable levels of land, air, water or noise pollution or land instability.” – “Preventing unacceptable risks from pollution and land instability” LAs should: “new development which may give rise to pollution, either directly or indirectly, is appropriately located having regard to the effects on health, the natural environment or general amenity, taking account of the potential sensitivity of the area to adverse effects from pollution; and “the site is suitable for its new use taking account of ground conditions, pollution arising from previous uses and any proposals for land remediation. “developer’s responsibilities are confirmed for ensuring that a safe and secure development can be achieved where a site is affected by contamination or land stability issues… and adequate site investigation undertaken by a competent person should be presented.”

Major Problems for local authority regulators? Removal of significant planning policy guidance Significant reduction in resources due to cuts in local authority funds from central government How will we get agreement? Faster decisions due to maximum 12 month deadline for all planning permissions (including appeals) How will we be able to demonstrate unsustainability of proposed developments in order to recommend refusal? How will CL issues be considered and how will Conditions / safeguard be placed on development technically outside of the planning regime? How can we effectively regulate when in some circumstances Localism agenda removing need for planning permissions? How can the local authority effectively refuse approval when they cannot afford to contest the likely appeal process.?

Independent Guidance Initiatives in support of regulation of land contamination LQM/CIEH Workshops with delegates - including regulators, CLOs, consultants, and academics working together to review all available toxicological and epidemiological published information for a wide range of contaminants of concern to aid the development of policy-compliant Generic Assessment Criteria (GACs) equivalent to minimal risk value SGVs using the CLEA model 1 st edition 31 contaminants Nov nd edition82 contaminantsJuly 2009 CIEH - The Local Authority Guide to Ground Gas Sept 2008 by Steve Wilson, Geoff Card & Sarah Haines LQM/CIEH SPOSH Workshop – Dose Response Road-maps May 2011 an aid to Part 2A decision-making - a computer model with electronic access to all published toxicological information for a selections of common contaminants with facility to produce a graphical presentation of the cloud of dose response information for direct comparison with site-specific contaminant levels. CIEH initiative to produce new technical planning guidance on dealing with contamination in the context of the requirements of the NPPF to replace the withdrawn PPS 23 in partnership with RTPI.

Spotting SPOSH: The LQM/CIEH Dose Response Roadmaps A quick and simple to use tool to help local authorities fulfil their duty under Part 2A of the Environmental Protection Act 1990 For each substance, for specific pathways A simple tool on which to assess estimated exposure against the full range of toxicological and epidemiological information Difficult to produce Simple to use; simple to understand Remember Part 2A is a POSITIVE test

The dose response cloud 1. Plot estimated average daily exposure 2. Compare with dose response data