2011 ADC WINTER FORUM | PAGE 1 Navy Use of § 2922 Authority CAPT Clayton Mitchell NAVFAC Energy Office.

Slides:



Advertisements
Similar presentations
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Headquarters U.S. Air Force 1 Enhanced Use Lease Components, Terms and Conditions Mr. Allan Curlee.
Advertisements

GPA Renewable Energy Resource for Guam Power Authority
2012 ADC WINTER FORUM | PAGE 1 Robert V. Meehan CNIC EUL Program Manager Navy EUL Program.
HB1438 Update & Statewide Capital Planning Initiative Office of State Finance Department of Central Services November 8, 2011.
Anchorage Regional Landfill Landfill Gas-to-Energy Project
2013 ADC INSTALLATION INNOVATION FORUM | PAGE 2 Legal Authorities for Partnerships and Shared Services Jennifer Curtin January 16, 2013.
September 2012 Energy Opportunities: Solar, Wind, Energy Efficiency.
2011 ADC WINTER FORUM | PAGE 1 Developing Renewable Energy Projects on DoD Land Mr. Alan D. King Assistant Secretary of the Army for Installations, Energy.
1 DoD Renewable Energy: Focus on Army RFP August 6, 2012 Robert E. Tritt ©2012 McKenna Long & Aldridge LLP.
LOCAL REGULATION AND CLIMATE CHANGE QUICK TELECONFERENCE American Bar Association Section of Environment, Energy, and Resources Climate Change, Sustainable.
Net Metering and Interconnection Stakeholder Discussion Net Metering and Interconnection Stakeholder Meeting September 21, 2012 Discussion of.
1.  Purpose  To present Staff’s Preliminary Findings on the 2012 Integrated Resource Plans of:  APS – Arizona Public Service Company  TEP – Tucson.
Venture Catalyst Inc State, Municipal & Tribal Renewable Energy Financing Accessing Financing Opportunities for Government Renewable Energy Projects.
Community Energy Opportunities Jon Bell Business Development Manager Mosscliff Environmental Ltd.
2012 ADC WINTER FORUM | PAGE 1 Enhanced Use Leasing: Update & Opportunities Dr. Craig College, February 29, 2012.
2011 ADC WINTER FORUM | PAGE 2 Developing Renewable Energy Projects on DoD land Angela Maybrier, Booz Allen Hamilton Grand Hyatt/San Antonio TX Wednesday,
Innovative Financing for Urban Renewables Ken Nolan Manager of Power Resources May 14, 2015 Burlington Electric.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Headquarters U.S. Air Force 1 “To BRAC or Not to BRAC” What happens if there is not a BRAC? ADC.
Engineering Technology Division
California's three large IOUs collectively served 12.7% of their 2007 retail electricity sales with renewable power. – Pacific Gas and Electric (PG&E)
Energy Law 7 – Renewables Fall 2014 October 14, 2014 Alan Palmiter Not for distribution- for study purposes only.
Green Energy London Co-operative Inc. (GEL) May 9, 2013 What is GEL?
Siemens sans siemens sans bold siemens sans italic siemens sans italic bold siemens sans black siemens black italic Siemens Building Technologies.
Pasadena Water & Power Intermountain Power Project Amend the Existing Contracts Participate in Renewal Project Pasadena City Council Item 11 July 20, 2015.
Lorelei H. Oviatt, AICP Director Kern County Planning And Community Development Department August.
Slayton Solar Project RDF Grant Award EP3-10 Presentation of the Project Results to the RDF Advisory Board January 8, Project funding provided by.
Resource Planning Georgia Power’s Diverse Plan to Meet Georgia’s Energy Needs AWMA Fall 2010 Conference October 7, 2010 Jeff Burleson Director of Resource.
Terra-Gen Power, LLC California Renewables Portfolio Standards: Challenges and Opportunities CCPUC Annual Meeting October 5, 2009.
Creating A Cleaner Energy Future For the Commonwealth Focusing on Solar PV: Technology, Siting Considerations, Incentives Natalie Andrews Renewable Energy.
Presentation to Energy & Technology/Planning & Development Committees Considerations on Establishing Municipal Utilities Joint Informational Forum Legislative.
Boreal Renewable Energy Development Ferriter Scobbo & Rodophele PC Outback Engineering Richard C. Gross, Inc. March 12, 2009 Notus Clean Energy LLC Wind.
Presentation to San Diego Sierra Club Richard Caputo 12 Nov 07 Renewable Energy Parks.
Oregon Renewable Energy Action Plan April 2005 with Geothermal Energy highlights by Carel DeWinkel Senior Policy Analyst.
Eagle Crest Energy Company February Page 2 New Hydro: Making it Happen Background on the Eagle Mountain Pumped Storage Project Need for Eagle.
NW Regional -- Washington n n Washington’s residents, businesses and industries spend $10 billion on their energy costs each year. n n Washington’s long-term.
Kinetic Opportunities How Can Your LRA Benefit from Energy Development? September 26, 2013.
2009 Bidders Workshop Attachment D August 3, 2009.
Federal Energy Management Program Key Provisions of Current Legislation Renewable Working Group September 10, 2002 Nancy Carlisle NREL.
Selecting Renewable Projects at Colorado Springs Utilities APPA Conference John Romero GM Acquisition, Engineering and Planning October, 2009.
2013 ADC INSTALLATION INNOVATION FORUM | PAGE 1 How to Determine to Pursue an EUL or PPA Mr. Brian Brown Chief – Air Force Strategic Asset Utilization.
DALLAS BAR ASSOCIATION ENERGY LAW SECTION REVIEW OF OIL & GAS LAW XXIII SEPTEMBER 11-12, 2008 Lisa Chavarria Stahl, Bernal & Davies, LLP Austin, Texas.
Introducing the Atlantic City Alternative Energy Authority ACAEA A Municipal Utilities Authority Pursuant to NJSA 40:62-12.
Phoenix Convention Center Phoenix, Arizona ANDREA L. KINCAID DLA Energy Track 5 Project FinanceSession 6 Renewables Through Private Financing.
ECONOMIC DEVELOPMENT SERVICES SOUTHERN CALIFORNIA EDISON Leading the Way in Electricity | Business Customer Division 1 For External Use Economic Development.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Headquarters U.S. Air Force Renewable Energy Challenges -an Air Force view 1 Ken Gray Energy Rates.
Public-Public Partnerships February 27, ADC WINTER FORUM | PAGE 2 Public – Public Partnerships Boot camp for Defense Communities Craig Zgabay.
NEW FEDERAL RULES FOR GEOTHERMAL LEASING AND PERMITTING Utah Geothermal Working Group Meeting Salt Lake City March 14, 2007 Kermit Witherbee and Al Mckee.
A DISCUSSION AROUND POTENTIAL FOR DISTRICT SYSTEMS IN THE CITY OF CAPE TOWN Spatial Planning and Urban Design : Marco Geretto.
Solid Waste Association of North America City of Brandon’s “Presentation on Methane Gas Utilization” May 14, 2009 – Winnipeg.
2008 Bidders Workshop Attachment D April 11, 2008.
Secondary legislation on renewable today and tomorrow Nicolae Opris Vicepresident, ANRE ANRE ROMANIAN ENERGY REGULATORY AUTHORITY.
World energy production by source in 2004: Oil 40% coal 23.3% natural gas 22.5% hydroelectric 7.0% nuclear 6.5% biomass and other 0.7%.
Southern California Edison The San Onofre Nuclear Generating Station April 14, 2011.
Public Private Partnerships July 28, 2014 Joe Corrigan Barnes & Thornburg.
Legal, Regulatory and Financial Incentive Framework to Support Landfill Gas Power Generation Project Development Presented by Leiping Wang Senior Energy.
Philippine Feed-In Tariff System Implementation 1.
1 Basic Concepts on Power Supply Agreement (PSA) Francis Saturnino C. Juan Executive Director Energy Regulatory Commission.
0 Greg Wagoner Manager, Power Supply Wabash Valley Power Association June 6, 2006 Methane Recovery Workshop.
1 SYMPOSIUM: U G A N D A A F T E R I D I A M I N A N D M I L T O N O B O T E Hamburg, Germany 29 th September 2008 INVESTMENT OPPORTUNITIES IN POWER GENERATION.
Session 22 (R) Utility Scale Solar Development Power Purchase Agreements (PPAs) April 04, 2016.
Solar Electricity Generation: Government Leading by Example in Solar Deployment Federal Environmental Symposium June 5, 2007 U.S. Department of Energy.
Creating a Market for New Investment in Biomass Renewable Energy Generation Capacity Presented by Steven Jay Mueller President – DG Energy llc
Renewable Distributed Generation and Public Water Supply Utilities CWWA/CTAWWA Fall Conference Paul R. Michaud, Esq. October 20, 2015.
Discussion of the Differences Public Works Law and Bid Law
Base Renewable Projects Legal & Regulatory Hurdles
NAVFAC SOUTHWEST RENEWABLE ENERGY PROGRAM Joint SAME/SMPS-OC Breakfast August 26, 2010 Nathan Butler, PE NAVFAC Southwest Renewable Program Office
Customer Dedicated Solar
City Council April 30, 2018 Item 13
Case No UT PNM Workshop Comments
Solar Energy Commercialization Session 11
Presentation transcript:

2011 ADC WINTER FORUM | PAGE 1 Navy Use of § 2922 Authority CAPT Clayton Mitchell NAVFAC Energy Office

2 Key Energy Legislative Provisions  10 USC 2922A Establishes contract duration for provision and operation of energy production facilities.  10 USC 2917 Permits Secretary of military department to develop geothermal resources beneath withdrawn public lands.  10 USC 2916 Permits military to sell, or authorize the sale by a contractor of electricity produced from alternate energy or cogeneration facilities. Funds to be invested in account for electricity.

2011 ADC WINTER FORUM | PAGE 3 10 USC § 2922A Authority – Contracts for Energy  Contract up to 30 years in duration  Purchase energy either from: production facilities on real property under SECNAV jurisdiction or; on private property  Requires SECDEF approval  Sometimes (mistakenly) referred to as the Power Purchase Agreement (PPA) statute.

2011 ADC WINTER FORUM | PAGE 4 DON Applications of §2922A  None to date. China Lake Geothermal often mistaken as under § 2922A. Miramar Land Fill Gas (currently in-progress) would represent DON’s initial use of § 2922A authority Potential future opportunities at: o 29 Palms (Solar ) o NSWS China Lake (Solar) o NAS Fallon (Solar)  Navy interpretation of § 2922A1 Section A references §2917 – authorizes geothermal energy resource development. Section A2 references provision and operations of an energy production facility (not specifically renewable or geothermal) on land under jurisdiction of the Secretary concerned or on private property. Navy interprets that withdrawn land would fall under the jurisdiction of the Secretary concerned. o Except when the withdrawal notice notes specific conditions:  Executive Order  Other statues

5 China Lake Geothermal Plant Public/Private Venture Generally considered a “revenue” contract vs FAR contract. DON can take revenue or power Not considered a FAR Contract because it does not involve the expenditure of appropriated funds for either services or supplies. Several FAR clauses have been incorporated into the contract §2922A often mistakenly cited as the enabling authority for China Lake plant. Originally authorized under 10 USC § 2867 and 2889; the precursor to § 2917 Contractual Overview 5 Production Capacity Power Plants (4) – Navy (2)/BLM (2) Net Production Output: 270 MW Infrastructure Turbine-Generator Sets: (9) Transmission Lines: (2) Productive Wells: (166) Piping (Linear Feet): +200,000

Miramar Landfill Gas Overview Contractor Scope: Develop/ construct/ operate/ maintain renewable power generation facility Methane gas extracted from landfill (15 years - § 2922A) Located on MCAS Miramar real property leased to the city of San Diego 3 MW Renewable Energy at MCAS Miramar 25,542 MWH annual capacity/ 18,809 MWH/yr minimum delivery Contractor to deliver renewable power NLT (9) months after contract award Government Scope: Construct/ own/ operate/ maintain power transmission infrastructure to new facility Strategic Objectives: Reduce MCAS Miramar’s reliance on fossil fuels At a later date, the Government may negotiate provisions to include “Black Start” capability to mitigate electric grid failure USMC to retain Renewable Energy Credits Pre-established price for predictability and budgetary planning Potential delivery of 33% to 50% of installation’s annual mission essential energy requirement.

Miramar Challenges Coordination of multiple contracts Government construction of transmission/distribution lines o Portion of the transmission lines funded under ARRA – should be awarded after PPA is awarded. o If transmission line completed but PPA not awarded, then no complete and usable system. Contractor construction of production facility Power Purchase Agreement for commodity utility o Take or Pay Legal Considerations o Termination Clause Legal Considerations

QUESTIONS?

9 China Lake Geothermal Plant History Project Location: NAWS China Lake Key Milestones: Start Initial Testing: 1964 Test Initial Well: 1977 Initial Contract Award: 1979 California Energy Corporation Follow-on contractor: Terra-Gen Contract Renegotiation (30 years): 2005 Type of Contract: “Unique” Navy receives negotiated percentage of contractor’s gross revenue up to ceiling of 20%. Business Model Revision Underway Co-locate solar PV or wind with geothermal wells. Share transmission line with geothermal power.