CPUC Procurement Policies Robert L. Strauss California Public Utilities Commission Energy Division - Procurement Section.

Slides:



Advertisements
Similar presentations
Legal Framework, Investment Opportunities and Technical Innovation in the Electricity Sector Security of Supply through competitive markets: Design of.
Advertisements

Procurement and Resource Adequacy Briefing August 2, 2006 Molly Sterkel, California Public Utilities Commission.
R RA Phase II Proposals Workshop (day 2) January 25, 2011 Court Yard room 10:00 am- 2:45 pm.
California Energy Commission Retail Electric Rate Scenarios: Key Drivers and Structure 2015 Integrated Energy Policy Report California Energy Commission.
California Energy Action Plan Joint Public Meeting Electricity System Reliability Activities California Energy Commission July 17, 2003.
Resource Adequacy, Reliability, Risks and Markets October 9, 2006 Sean Gallagher California Public Utilities Commission Energy Division, Director.
What’s Needed for Rational Discussion of Resource Adequacy: A Framework and Some Facts * presented by Kevin Woodruff, Principal, Woodruff Expert Services,
Status Report: Resource Adequacy (RA) and Long Term Procurement Planning (LTPP) CPUC Energy Division Molly Tirpak Sterkel cpuc.ca.gov; Tel:
David Howarth MRW & Associates Oakland, California 1 JUST THE FACTS: RESOURCE PLANNING AND PROCUREMENT INDEPENDENT ENERGY PRODUCERS ANNUAL.
Public Interest Energy Research –Natural Gas Program Status Presentation to Air Emissions Advisory Committee May 12, 2005 Philip Misemer California Energy.
Energy Storage in California’s Grid of the Future Don Liddell, Douglass & Liddell Co-Founder and General Counsel, California Energy Storage Alliance ​
Workshop for Proposed EPIC Triennial Plans Investor Owned Utility Programs July 31, 2014.
Perspectives on Resource Adequacy Matt Barmack Director, Market & Regulatory Analysis Calpine Corp.
California Energy Commission Resource Adequacy Demand Forecast Coincidence Adjustments R Resource Adequacy Workshop January.
Compare and Contrast ELCC Methodologies Across CPUC Proceedings
OVERVIEW OF RPS CALCULATOR FUNCTIONALITY 1. Model Specification Model developed to provide plausible portfolios to CPUC LTPP and CAISO TPP to facilitate.
ENERGY ONLY RESOURCES & THE RPS CALCULATOR. Deliverability Overview Most resources procured to date have been procured to be fully deliverable – CAISO.
Renewable Net Short.
Resource Adequacy Forecast Adjustment(s) Allocation Methodology
California Public Utilities Commission Regulation and Natural Gas Infrastructure Richard Myers CPUC Energy Division May 14, 2009.
Overview of LMP Markets Features of ISOs / RTOs David Withrow Senior Market Economist Fall 2007 Meeting of the NARUC Staff Subcommittee on Accounting and.
Energy Storage R Energy Storage Procurement & Policy Options Arthur O’Donnell/Aloke Gupta/Elizaveta Malashenko Energy Division Grid Planning.
Anjali Sheffrin, Ph.D. Chief Economist & Director, Market Design & Product Development Essential Features of California’s New Market Design Market Redesign.
California Energy Action Plan Tim Tutt California Energy Commission Dan Adler California Public Utilities Commission June 24, 2004 Goal II – Accelerate.
IEPR Response Joe Desmond Resources Agency Deputy Secretary for Energy Joint Energy Action Plan Meeting March 23, 2005.
Implementing one of the most ambitious renewable energy standards in the country CALIFORNIA’S Implementing one of the most ambitious renewable energy standards.
Post 2012 Energy Efficiency Planning Schedule: Options and Implications February 16, am - 5 pm CPUC Auditorium.
Laura Doll Deputy Executive Director, CPUC October 18, 2006 Platt’s CA Power Market Forum C ALIFORNIA P UBLIC U TILITIES C OMMISSION Fulfilling Resource.
1 Connecting the Dots Edward Randolph Director, Energy Division California Public Utilities Commission Date (example: April 26, 2012)
Energy Action Plan “Report Card” and the AB32 “Umbrella” CFEE ROUNDTABLE CONFERENCE ON ENERGY Julie Fitch California Public Utilities Commission Director.
California SONGS\OTC Plants Assumptions TEPPC – Data Work Group Call Tuesday, September 15, 2015.
Small Renewable Generators Tony Marciano Public Utility Commission of Texas May 2, 2007 (512)
Tony Braun Bruce McLaughlin Braun & Blaising, P.C APPA Legal Seminar October 9, 2006 Resource Adequacy California Style An Overview and Examination of.
Transmission Planning at the California ISO September 10, 2015.
1 Energy Division Workshops: LTPP Planning Standards (Part 1) & Procurement Rulebook June 11, 2010 Workshop R , Tracks 1, 2, & 3.
ECONOMIC DEVELOPMENT SERVICES SOUTHERN CALIFORNIA EDISON Leading the Way in Electricity | Business Customer Division 1 For External Use Economic Development.
Refinements to CAM-Related Reliability Cost and Capacity Allocation Processes Jeremy Waen Regulatory Analyst| Marin Clean Energy February 2015.
Benefits of a Multi-year Resource Adequacy Program May 20, 2014 Karl Meeusen, Ph.D., Market Design and Regulatory Policy Lead Market and Infrastructure.
THE MIX: FACTS, FIGURES, AND THE FUTURE INDEPENDENT ENERGY PRODUCERS ANNUAL MEETING SEPTEMBER 26, 2013 William A. Monsen MRW & Associates Oakland, California.
1 Market Evolution Program Long-Term Resource Adequacy Regulatory Affairs Standing Committee Meeting May 14, 2003.
DR issues in California discussed last year in March Historical DR in California: some background issues –Twenty years of programs/tariffs I/C and AC cycling.
California Public Utilities Commission Why a Load-Based Emissions Cap for California? Julie Fitch CPUC Director of Strategic Planning April 19, 2007 Presentation.
1 ISU: DER in Illinois / Springfield, IL / May 18, 2000 Jairam Gopal California Energy Commission Sacramento CA Institute for Regulatory Policy Studies.
Utility Procurement: What’s Next? IEP 2015 Annual Conference
An Overview of Demand Response in California July 2011.
1 California Energy Commission April 27, 2015 Valerie Winn Chief, State Agency Relations Contingency Planning and Diablo Canyon Power Plant.
California Energy Action Plan December 7, 2004 Energy Report: 2004 and 2005 Overview December 7, 2004.
Long Term Transmission Integration Planning at the California ISO Intermittency Analysis Project (IAP) Energy Commission Staff Workshop February 13, 2007.
Cogeneration and EAP II Ensuring Reliability or Broken Promises Michael Alcantar on behalf of the Cogeneration Association of California April 24, 2006.
CEC Load Management Standards Workshop March 3, Update on the CPUC’s Demand Response and Advanced Metering Proceedings Bruce Kaneshiro Energy Division.
Overview: California Renewables Portfolio Standard (RPS) Program Presented by Paul Douglas RPS Program Manager California Public Utilities.
AB 32 Update December 6, Outline Cap and Trade Program 2013 Update to Scoping Plan Looking ahead to
Energy Storage and Distributed Energy Storage (ESDER) Initiative California Independent System Operator CAISO – CPUC Energy Storage Workshop May 3, 2016.
Planning the Networked Grid Transmission Planning J.E.(Jeff) Billinton Manager, Regional Transmission - North Building the Networked Electricity Grid –
Los Angeles County Community Choice Aggregation Regional CCA Task Force Meeting October 28, 2015.
1 PG&E Proposals for Refinements to the Resource Adequacy (RA) Program Compliance Year 2017 RA Workshop February 18, 2016.
Electricity Outlook: Summer of 2005 and Beyond." Before the Senate Energy, Utilities and Communications Committee February 22, 2005 Steve Larson Executive.
Integrated Capacity Analysis Working Group June 9, am – 12 pm CPUC Golden Gate Hearing Room drpwg.org.
CPUC Resource Adequacy Program – LAO briefing May 25, 2009.
Overview of SB 350 California Public Utilities Commission Melicia Charles, Energy Division February 23,
May 9 th, 2016 California Public Utilities Commission Power Charge Indifference Adjustment (PCIA) Workshop.
Joint Energy Auction Implementation Proposal of PG&E, SCE and SDG&E California Public Utilities Commission Workshop – November 1, 2006.
SM SOUTHERN CALIFORNIA EDISON® RETI 2.0 Workshop 03/16/2016 IOU Panel.
LNBA Subgroup: Avoided Transmission Value
August ICA Agenda Time Topic 8:00 – 8:15
Mike Jaske California Energy Commission
Potential and Goals Primer
Resource Adequacy Demand Forecast Coincidence Adjustments
Combined Heat and Power Program Settlement
Independent Energy Producers 2019 Annual Meeting
Presentation transcript:

CPUC Procurement Policies Robert L. Strauss California Public Utilities Commission Energy Division - Procurement Section

California Investment Guidelines Energy Action Plan I, adopted 2003 Energy Action Plan II, adopted Oct Investment guided by the Loading Order –Energy Efficiency –Demand Response –Renewables –Electric Adequacy and Infrastructure

Long Term Procurement Plans and Resource Adequacy State focus on Load Serving Entities (LSE) Two Pronged approach: –IOUs develop and follow procurement plans –LSEs make Resource Adequacy showings Programs vary with regulatory authority and need. Initial focus on CAISO network. IOU vs. Electric Service Providers, vs. MUNI

AB57 (PU Code 454.5) –Put IOUs back into the procurement business as of Jan. 1, 2003 –Ensured that CPUC would establish policies and cost recovery mechanisms for procurement –Ensured IOUs cost recovery if procurement done in accordance with a pre-approved procurement plan PUC Implementation of AB57 began in 2002 – – Numerous decisions authorized PG&E, SCE, SDG&E to resume procurement –Jan-2004 Adopted procurement policy framework, including biennial LTPP Proceedings that follow the biennial IEPR proceeding schedule –Dec-2004 Approved first cycle of 10-year of Long-Term Plans –Feb-2006 Start second cycle of 10-year of Long-Term Plans Key Developments in CPUC Procurement Policy

Long Term Procurement Plans (LTPP) LTPP are a form of integrated resource plans IOUs forecast demand and identify how they will meet needs Plans detail procurement rulebook

Procurement Rules Short Term (less than 90 days) buy and sell through markets Intermediate term (90 days-less than 5 years) markets, RFOs, bilateral contracts Long Term (5 or more years) RFOs, bilateral contracts.

Resource Adequacy Resource Adequacy is ordered by Public Utilities Code Section 380, signed by Governor Schwarzenegger Sept 29, (a) The commission, in consultation with the Independent System Operator, shall establish resource adequacy requirements for all load-serving entities. (b) …objectives: (1) Facilitate development of new generating capacity and retention of existing generating capacity that is economic and needed. (2) Equitably allocate the cost of generating capacity and prevent the shifting of costs between customer classes. (3) minimize enforcement requirements and costs.

Oversight LTPP and rulebook approval Procurement Review Group oversight of all procurement activities Independent Evaluator review of all RFOs Formal applications for long term contracts Commission approval for changes in rulebook, activities not in rulebook.

Resource Adequacy Procedural History Rulemaking –D established policy framework and developed initial rules for counting generation capacity –D established System Resource Adequacy program including summer ahead (year-ahead) filings and monthly filings D in R resolved implementation issues including defining a tradable capacity product

Resource Adequacy Requirement (RAR) LSE must procure qualifying resources to meet their RAR RAR is calculated using an LSE’s forecast load by month, plus a reserve margin of 15-18%, for a total of 115% of forecast load. LSE forecast load is based on a 1 in 2 year and is baselined against the CEC forecast. LSEs file their forecast load and the CEC performs a plausibility adjustment.

What counts toward RAR RAR is a capacity requirement, not energy. Units must be in CAISO database and are subject to a must offer obligation. Imports based on an allocation of import capacity. Dispatchable Demand Response programs, if paid by the public use charge are allocated to all LSEs. RMR units under condition 2 are allocated to LSEs paying the RMR charges. LD contracts are being phased out. DWR contracts count for their life. Intermittent (e.g. Wind) and energy limited resources using PUC adopted counting rules.

System Resource Adequacy Implementation Showing for June-Sept 2006 filed Feb (year–ahead) Year-ahead system showing is 90% of RAR, or 103% of an LSEs’ forecast load. Monthly showing 100% of RAR due 1 month ahead (June showing due May 1) Showing for May-Sept 2007 due Oct 31

Local Resource Adequacy Development Rulemaking : Phase 1 to develop Local RAR CAISO performed a Local Capacity Technical Analysis that identified 9 local area that require in area generation to meet peak loads. Study is performed on a 1 in 10 basis Study provided Commission with 2 reliability options

Local RAR Implementation Decision adopted Local RAR LSEs must procure resources in 4 Local areas: LA Basin, San Diego, SF Bay Area, Other PG&E areas (combination of 6 local areas identified in CAISO study) CAISO publishes a list of the qualifying capacity (generation units) located in each local area. Local generation must be subject to CAISO must offer obligation LSEs’ Local RAR based on load shares in the IOUs service territories Reliability level for 2007 set at Category C (N-1-1/N-2) level recommended by CAISO Local RAR filing for 2007 in Oct, no monthly filings

Next Steps R Phase 2 –Updated LTPP –Updated Need Determinations R Phase 2 –Centralized Capacity Market for RA –Revisions to the Planning Reserve margin –Multi-year RA obligations