NERC’s 2007-2016 Long-Term Reliability Assessment (LTRA) Workshop: Natural Gas Dependency in New England Michael I. Henderson ISO New England Inc.

Slides:



Advertisements
Similar presentations
NAESB Strawman January 24-25, Problem Statement Enough generators must have fuel to meet peak load New England Cold Snap crisis heightened interest.
Advertisements

NECPUC SYMPOSIUM Concurrent B Natural Gas Conditions Facing New England Mark R. Babula ISO New England Inc. Supervisor - Power Supply & Reliability June.
© New York Independent System Operator, Inc. All Rights Reserved. New Challenges Facing System Operators Stephen G. Whitley President & Chief.
Al McBride MANAGER, AREA TRANSMISSION PLANNING Existing Import Interfaces: Transmission Transfer Capabilities and The Calculation of Tie Benefits DECEMBER.
New England’s Regional Renewable Resource Development Efforts New England States Committee on Electricity November 3, 2011.
Energy and Telecommunications Interim Committee January 29, 2004.
PJM©2014www.pjm.com Winter 2014 Overview & Recent and Upcoming Market Rule Changes Adam Keech Director, Market Operations.
Energy Storage Definitions/Definitions ETWG 18 Feb 2013.
Resource Adequacy in PJM
RGGI Leakage Workshop Presentation June 15, 2006 Stephen J. Rourke Vice President, System Planning ISO New England.
1 The Midwest ISO At the Crossroads of America International Meeting of Very Large Power Grid Operators October 24 & 25, 2005 Beijing, China.
Tucson Area Reliability Mike Flores Control Area Operations Tucson Electric Power May 2000.
Understanding Ontario’s Electricity System
Connecticut’s Energy Future Connecticut Energy Advisory Board Conference Hartford, Connecticut December 2, 2004 Kevin Kirby Vice President, Market Operations.
G 200 L 200 ISO NEW ENGLAND T H E P E O P L E B E H I N D N E W E N G L A N D ’ S P O W E R. COLD SNAP Overview of Proposed Options for Winter 2004/2005.
North American Energy Standards Board (NAESB) Electric and Gas Industry Coordination in New England: Cold Weather Conditions Houston, Texas February 9,
Utility Regulation March 10, 2011 Raj Addepalli Deputy Director, Electric, Office of Electric,Gas and Water New York State Department of Public Service.
Energy supply forecast Presentation to Connecticut’s Energy Future Conference by Bridgett Neely, London Economics International LLC December 2, 2004 Hartford,
ERCOT PUBLIC 8/19/ LTSA Scenario Results Updates August, 2014.
Electric Utility Basics An overview of the electric industry in New England and the operation of consumer-owned utilities 1.
SEPTEMBER 29, 2014 | CONCORD, NH Eric Johnson DIRECTOR, EXTERNAL AFFAIRS New Hampshire Energy Summit Lessons Learned from Winter 2014 and How the ISO Is.
1 The Effects of Integrating Wind Power on Transmission System Planning, Reliability, and Operations Phase 1 Preliminary Overall Reliability Assessment.
The Potential for Increased Cooperation on Offshore Wind among the Northeast States Warren Leon, Executive Director.
ERCOT Public 1 AS Demand Curves for Real-Time Co-optimization of Energy & Ancillary Services.
Transmission planning in Vermont Past, present and future Docket 7081 workshop By Dean LaForest 9/19/05.
New England’s Power System: At a Crossroads – Again! Stephen Rourke VICE PRESIDENT, SYSTEM PLANNING NECPUC Symposium: Governors’ Infrastructure Initiative.
ISO New England Regional Update Wholesale Electricity Markets & State Energy Policy Seminar Connecticut Business & Industry Association December 14, 2010.
PJM© PJM Confidential PJM Generation Interconnection Overview Virginia Offshore Wind Conference Virginia Beach June 22, 2011 Paul McGlynn General.
Warren Lasher Director, System Planning October 4, 2014 Our Energy Future.
Need for Transmission Investment 2010 Mid-American Regulatory Conference AEP.
Black Sea Regional Transmission Planning Project By Predrag Mikša EKC - Electricity Coordinating Center Istanbul, March 2011.
1 New England Demand Response Resources: Present Observations and Future Challenges Henry Yoshimura Demand Resources Department ISO New England, Inc. Holyoke,
Overview of the Capacity Markets in the United States 2008 APEX Conference in Sydney, Australia October 13-14, 2008 Hung-po Chao Director, Market Strategy.
1 Capacity Markets Investment in Generation Capacity Payments October 31, 2005 J. W. Charlton.
Texas Wind Energy American Meteorological Society Summer Community Meeting – Norman Oklahoma Henry Durrwachter, P.E. August 12, 2009.
Electric Energy Issues and the Region Connecticut Business and Industry Association Stamford, Connecticut December 2, 2004 Kevin Kirby Vice President,
ISO Outlook Summer 2005 and Beyond Senate Energy, Utilities and Communications Committee February 22, 2005 Jim Detmers Vice President of Grid Operations.
New Hampshire Energy Summit Rich Paglia President, Maritimes & Northeast Pipeline Vice President, Marketing New England Pipeline Expansion Update.
Sixth Northwest Conservation & Electric Power Plan Draft Wholesale Power Price Forecasts Maury Galbraith Northwest Power and Conservation Council Generating.
Environmental Issues in System Planning Jim Platts – ISO New England NARUC Summer Meeting – New York City July 15, 2007.
1 Electricity System and Energy Market Basics David J. Lawrence Manager, Auxiliary Market Products Prepared for: RGGI I&L Workshop June 15, 2006.
PJM©2012www.pjm.com PJM’s Experience with Capacity Markets Terry Boston President & CEO PJM Interconnection Power Across Texas September 21, 2012.
2015 New Hampshire Energy Summit 5 October 2015 Robert Scott, Commissioner, New Hampshire Public Utilities Commission.
Natural Gas and Power Generation Natural Gas and Power: A Look at Prices Carbon Legislation and Power Generation The future of Power Generation and the.
RGGI Workshop on Electricity Markets, Reliability and Planning Topic Session 3: RGGI Design, Markets and Reliability – Issues Relating to System Operations.
PJM©2015 ATTACHMENT TO TESTIMONY OF ANDREW OTT OHIO ENERGY MANDATES STUDY COMMITTEE MARCH 18,
Resource Adequacy Steering Committee Meeting October 4, 2011.
Electric Reliability Council of Texas (ERCOT) A Success Story… In Progress Ingmar Sterzing United States Association of Energy Economics (USAEE) Pittsburgh.
STaR Symposium October 22, 2013 A Realistic View of Renewables Christine Risch.
FERC Staff’s Report on Demand Response and Advanced Metering.
Planning for Texas’ Energy Future Select Committee on Electric Generation Capacity and Environmental Effects Bob Kahn President & CEO February 6, 2008.
PJM©2014www.pjm.com A System Operator’s Resilience Wish List Tom Bowe Executive Director Reliability and Compliance PJM Interconnection
Long Term Transmission Integration Planning at the California ISO Intermittency Analysis Project (IAP) Energy Commission Staff Workshop February 13, 2007.
Connecticut Department of Energy and Environmental Protection March 24, 2016 Presentation to the Energy & Technology Committee Informational Forum on Adequacy.
2015 NARUC Winter Meeting Nick Wagner – Iowa Utilities Board 1.
©2003 PJM 1 Presentation to: Maryland Public Service Commission May 16, 2003.
Sixth Northwest Conservation & Electric Power Plan Draft Wholesale Power Price Forecasts Maury Galbraith Generating Resource Advisory Committee Meeting.
Black Start Service in New England System Operator’s Perspective Robert B. Burke ISO New England Inc. July 23, 2002 IEEE - Chicago, Illinois.
Presentation to the MA Electric Restructuring Roundtable
Michael I. Henderson ISO New England Inc.
December 9, 2005 Allison DiGrande, External Affairs Department, ISO/NE
Cold Snap Task Force Update
2013 Long-Term Reliability Assessment and Other Key Assessment Initiatives Briefing.
New England Resource Adequacy
Alternative ICAP Proposal
New England Economic Partnership James Daly Vice President Energy Supply Energy Market Perspectives Reliable Energy, Competitive Prices and.
Planning Reserve Margin
Gordon van Welie, President & Chief Executive Officer
Wholesale Electricity Costs
Winter Reliability Program Updated
Presentation transcript:

NERC’s Long-Term Reliability Assessment (LTRA) Workshop: Natural Gas Dependency in New England Michael I. Henderson ISO New England Inc.

2 Natural Gas Dependency In New England New England’s Electric Power Grid 6.5 million customer meters –Population: 14 million 350+ generators 8,000+ miles of high voltage transmission lines 12 interconnections to three neighboring systems : –New York, New Brunswick, Quebec 31,000 megawatts (MW) of installed generating capacity 300+ market participants Summer peaking system –Summer: 28,130 MW (8/06) –Winter: 22,818 MW (1/04) ISO and Local Control Centers

3 Natural Gas Dependency In New England New England’s Capacity – Summer 2007 Generation capacity mix by primary fuel type, 2007, summer ratings, MW and percentage. Note: “Non-Hydro Renewables” include biomass, refuse, landfill gas, and wind.

4 Natural Gas Dependency In New England New England’s Energy Production New England electric energy production by fuel type, 2006, in 1,000 MWh. Note: “Non-Hydro Renewables” include biomass, refuse, landfill gas, and wind.

5 Natural Gas Dependency In New England New England’s Gas-Fired Fleet Potential Concerns: –“Just-in-time” delivery of fuel source –Unplanned outage or closure of the regional LNG facility –LNG shipping disruption or embargo –Loss of natural gas pipeline or compressor stations –Wholesale electricity’s exposure to natural gas price volatility Actual Experience: –Temporary shutdown of regional LNG facility – Post 9/11 –Greater Northeast Cold Snap – January 14-16, 2004 –Hurricanes Katrina & Rita - Fall of 2005

6 Natural Gas Dependency In New England Regional Response Developed robust rules and operating procedures to manage the electric system through short or long-term fuel supply or delivery constraints: –Appendix H of Market Rule #1: “Operations During Cold Weather Conditions.” –Operating Procedure No. 21: “Action During an Energy Emergency.” Added provisions in new markets to promote resource availability at time of need: –Forward Capacity Market (FCM) –Locational Forward Reserve Market (LFRM) Created the Electric/Gas Operations Committee (EGOC) –Increased communications and coordination with the regional natural gas sector via the Northeast Gas Association (NGA)

7 Natural Gas Dependency In New England Regional Response – cont’d Dual fuel conversions of single-fuel, gas-only power stations Newly proposed LNG terminals and expansion of regional natural gas grid Confirm existing practices are compliant with FERC Order 698: (electric & gas sector communications)

8 Natural Gas Dependency In New England Inter-Regional Response 3 ISO/RTO MOU on Natural Gas: –Transfer of knowledge between ISO-NE, NYISO & PJM –Coordinated operations & planning –Continuous pre & post-seasonal discussions –Sharing of information, studies & methodologies –Refinement of communications protocols and contact lists –Direct communications between Control Room and Gas Control –Table-Top exercises

9 Natural Gas Dependency In New England Long-Term Outlook ISO-NE Regional System Plan: –Annual 10-year plan –Loads, generation, transmission & demand-side –Fuel diversity, availability, deliverability ISO-NE’s Scenario Analysis: –New England will continue to depend on natural gas –Interconnection queue predominately gas-fired –Relatively low air emissions –Renewable Portfolio Standards (RPS)

10 Natural Gas Dependency In New England Long-Term Outlook – cont’d NERC LTRA –Resource adequacy assessment –Fuel supply & delivery assessment NPCC Triennial Review of Resource Adequacy –5-year resource adequacy review (LOLE) –Comprehensive review every three years –Interim review every year Emerging Issue: –LNG Interchangeability

11 Natural Gas Dependency In New England Operable Capacity Analysis New England’s total installed capacity: 33,425 MW (winter) –16,733 MW (50%) are capable of burning natural gas (as either a startup, primary, secondary or stabilization fuel) –8,587 MW (26%) are single-fuel, gas-only stations –8,146 MW (24%) are fully functional, dual-fuel stations (gas/oil) 2007 Regional System Plan – Assessed the amount of gas- only resources required under winter peak conditions: –50/50 load: 2007/08 ~ 450 MW 2011/12 ~ 1,650 MW –90/10 load: 2007/08 ~ 1,400 MW 2011/12 ~ 2,700 MW

12 Natural Gas Dependency In New England Market Rules and Operating Procedures Appendix H of Market Rule #1: “Operations During Cold Weather Conditions” –7-Day Forecast Projects Cold Weather Conditions –Cold Weather Watch, Warning & Event –Cold Weather Event triggers rollback of wholesale electric market timelines to align with natural gas nomination deadlines Operating Procedure No. 21: “Action During an Energy Emergency” –Triggered by fuel supply shortage or deliverability constraint –Requests fuel switching to non-constrained fuels –Allows collection of fuel inventory data from generation fleet –Dispatch system to manage and preserve fuel inventories

13 Natural Gas Dependency In New England New Natural Gas Infrastructure Source: Northeast Gas Association (NGA)

14 Natural Gas Dependency In New England New Natural Gas Infrastructure Source: Northeast Gas Association (NGA)

15 Natural Gas Dependency In New England Conclusions New England will continue to rely heavily on natural gas-fired generation (primary finding from ISO-NE’s Scenario Analysis) Close coordination between electric and gas industries is required Markets promote unit availability at time of need –Dual fuel & firm fuel purchases Renewable Portfolio Standards (RPS) and demand-side resources will assist in diversifying the region’s fuel supply Newly proposed LNG terminals and expansion of the regional natural gas grid will improve the amount of natural gas supply

16 Natural Gas Dependency In New England Appendix 2007 Regional System Plan: – ISO-NE’s Scenario Analysis: – ne.com/committees/comm_wkgrps/othr/sas/index.html NERC LTRA – NPCC Triennial Review of Resource Adequacy: –

17 Natural Gas Dependency In New England Appendix – cont’d Appendix H of Market Rule #1: Cold Weather Operations – ne.com/regulatory/tariff/sect_3/mr1_appendix_h_ pdf Operating Procedure No. 21: Action During an Energy Emergency – ne.com/rules_proceds/operating/isone/op21/index.html Northeast Gas Association: –