A Summary on Probabilistic Workshop held on September 9, 2014 Milorad Papic (RAWG Chair) Salt Lake City, January 13, 2015.

Slides:



Advertisements
Similar presentations
1 Demand-Side Management Influence on Reliability NERC Demand-Side Management Task Force (DSMTF) Rick Voytas, Chair November 2007 Presented To The U.S.
Advertisements

Transparent, Repeatable, Defendable, and Published Generation, Transmission & Nat Gas Network Co-Optimizations
Software Analysis Tools
Aidan Tuohy Sr. Project Engineer NWPCC Flexibility Metric Roundtable April 2013 Metrics and Methods to Assess Power System Flexibility.
Power Supply Adequacy Assessment Model/Methodology Review Steering Subcommittee Meeting January 29, 2010.
Overview of Loss of Load Expectation (LOLE) and Unforced Capacity (UCAP) Dan Huffman FirstEnergy Solutions November 20, 2007 OMS Board Workshop Resource.
Ad Hoc West-wide Resource Assessment Team (WRAT) : Assessment of Western System Adequacy in the Short-term Jeff King Northwest Power Planning Council Presentation.
05/14/2014 Flexibility Methods Workgroup. 2 © 2014 Electric Power Research Institute, Inc. All rights reserved. Overview/Agenda Discussion of Literature.
Capacity Valuation.
Multi-Area Stochastic Unit Commitment for High Wind Penetration in a Transmission Constrained Network Shmuel Oren University of California, Berkeley Joint.
Review of Probabilistic Workshop held on September 9, 2014 Milorad Papic (RAWG Chair) Salt Lake City, January 13, 2015.
Energy Planning and Recent Regulatory Developments Northwest Energy Systems Symposium (NWESS) University of Washington February 22, 2008 Nicolas Garcia.
1 The Effects of Integrating Wind Power on Transmission System Planning, Reliability, and Operations Phase 1 Preliminary Overall Reliability Assessment.
National Renewable Energy Laboratory Innovation for Our Energy Future * NREL July 5, 2011 Tradeoffs and Synergies between CSP and PV at High Grid Penetration.
Study Results Drought Scenario Study This slide deck contains results from the 2011 TEPPC Study Program. This study shows the impact in the interconection.
ERCOT PUBLIC 4/21/ Loss of Load Probability Assessment for NERC April, 2015.
NW Resource Adequacy Forum Steering Committee Conference Call November 4, 2010.
1 Planning Reserve Margin Dan Egolf Senior Manager, Power Supply & Planning.
A Resource Adequacy Standard for the Pacific Northwest Resource Adequacy Technical Committee January 17, 2008 Portland Airport.
Developing an Adequacy Metric Resource Adequacy Forum Technical Subcommittee Meeting October 16, 2009.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 2009 Draft Resource Program Released: September 30, 2009 Accepting Comments until: November 30,
Adequacy Assessment for the 2017 Pacific Northwest Power Supply Steering Committee Meeting October 26, 2012 Portland, Oregon 1.
Revising the Pacific Northwest Resource Adequacy Standard Resource Adequacy Technical Committee June 23, 2011.
Enhancing Reliability of the North American Transmission Grid Enhancing Reliability of the North American Transmission Grid Presented By Dejan J Sobajic.
Sixth Northwest Conservation & Electric Power Plan Draft Wholesale Power Price Forecasts Maury Galbraith Northwest Power and Conservation Council Generating.
Loss of Load Probability (LOLP) Project October 16, 2009 Resource Adequacy Technical Committee Meeting.
ERCOT Planning WMS 10/20/2010 Target Reserve Margin and Effective Load Carrying Capability of Installed Wind Capacity for the ERCOT System – Methodology.
ERCOT Planning October 2010 Target Reserve Margin and Effective Load Carrying Capability of Installed Wind Capacity for the ERCOT System - Methodology.
Comparison of LOLP Practices Mary Johannis PNW Resource Adequacy Technical Committee Mtg January 23, 2009.
June 27, Pacific Northwest Resource Adequacy Assessment for 2010 and 2012 Resource Adequacy Forum Steering Committee Meeting Northwest Power Pool.
RGGI Workshop on Electricity Markets, Reliability and Planning Topic Session 3: RGGI Design, Markets and Reliability – Issues Relating to System Operations.
Generation Adequacy Task Force Update to WMS November 18, 2009.
Relationship of Regional Resource Adequacy Standards to Utility Planning PNW Resource Adequacy Steering Committee Meeting June 27, 2007.
October 29, Organizational role of Short-Term Planning and Hydro Duty Scheduling Relationship to other groups in BPA Planning and analysis job.
2009 Pacific Northwest Resource Adequacy Assessment Resource Adequacy Technical Committee October 16, 2009.
2010 Work Plan Steering Committee January 29, 2010.
Target Reserve Margin (TRM) and Effective Load Carrying Capability (ELCC) of Wind Plants Evaluation - Input and Methodology ERCOT Planning 03/25/2010.
Moving toward a Final Resource Adequacy Standard Resource Adequacy Forum Steering Committee Meeting September 27, 2007.
Analysis of Demand Response Modeling in GridView Andy Satchwell and Sarah Smith Modeling Work Group December 21, 2015 The work described in this presentation.
Summary of Astrapé Reserve Margin Impact Analysis for the PUCT Pete Warnken WMS February 4, 2015.
Work Plan Resource Adequacy Forum Technical Committee July 29, 2009.
DWG – Dependable Capacity Kevin Harris, ColumbiaGrid TEPPC\Hydro Modeling Task Force - Chair.
CALIFORNIA ENERGY COMMISSION Workshop on the Staff Draft 2006 Summer Outlook Report December 8, 2005 Hearing Room B.
Utility Responsibility to Maintaining Load Reliability Resource Adequacy Forum Technical Committee Meeting June 20, 2007.
Resource Adequacy Assessment for 2015 Resource Adequacy Forum Technical Committee Meeting October 1, 2010.
RAWG Agenda Item LAR Data WECC Staff. Data Elements Generator information – Existing – Changes Monthly Peak Demand and Energy (actual year and.
Resource Analysis. Objectives of Resource Assessment Discussion The subject of the second part of the analysis is to dig more deeply into some of the.
Gen Maintenance w/ GridView DWG – Dec. 14, 2015 W ESTERN E LECTRICITY C OORDINATING C OUNCIL WECC System Adequacy Planning.
PC30 BLM High Priority RE SWG – 10/26/15 WECC Staff W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Long Term Transmission Integration Planning at the California ISO Intermittency Analysis Project (IAP) Energy Commission Staff Workshop February 13, 2007.
Clean Power Plan & Reliability – An Update TEPPC Winter 2016 Meeting February 3 rd – 4 th 2016 Vijay Satyal PhD, Sr. Policy Analyst W ESTERN E LECTRICITY.
Probabilistic Approach to Resource Adequacy Resource Adequacy Forum Technical Committee Meeting Portland, OR January 23, 2009.
RFPEG2013 PRE-BID MEETING RFPEG2013 – Pre-Bid meeting January 9, 2014 Presentation by Derek Davis – Public Utilities Commission.
Understanding Value of Short-Duration Resources CPUC RA Workshop March 5, 2016.
4/16/2010 Regional Planning Group Meeting Long-Term Planning Study of the ERCOT Interconnection Warren Lasher Manager, System Assessment.
CREPC/WIRAB Meeting April 27, 2016 Salt Lake City, UT Thomas Carr Western Interstate Energy Board Evolution of Grid Planning in the West.
Sixth Northwest Conservation & Electric Power Plan Draft Wholesale Power Price Forecasts Maury Galbraith Generating Resource Advisory Committee Meeting.
TEPPC Review Task Force Ian McKay, Chair, TEPPC W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Estimating the resource adequacy value of demand response in the German electricity market Hamid Aghaie Research Scientist in Energy Economics, AIT Austrian.
Target Reserve Margin (TRM) and Effective Load Carrying Capability (ELCC) of Wind Plants Evaluation - Input and Methodology ERCOT Planning 03/25/2010.
Variable Energy Resource Capacity Contributions Consistent With Reserve Margin and Reliability Noha Abdel-Karim, Eugene Preston,
WECC 2026 Common Case Capacity Assessment with RECAP
GENESYS Redevelopment Strawman Proposal
penetration of wind power
Transmission Planning in a Modern Market Environment
GENESYS Current Functionality
Study Results Drought Scenario Study
Portfolio Analysis Mike Hopkins
Software Analysis Tools
Planning Reserve Margin
Presentation transcript:

A Summary on Probabilistic Workshop held on September 9, 2014 Milorad Papic (RAWG Chair) Salt Lake City, January 13, 2015

Outline 1.Workshop Goals 2.Topics covered 3.Tools/Methodologies 4.Summary of the Results 5.Next Steps 2 W ESTERN E LECTRICITY C OORDINATING C OUNCIL

1. Workshop Goals 3 W ESTERN E LECTRICITY C OORDINATING C OUNCIL 1.Present practical experience in evaluating adequacy of generating capacity by different regions in the Western interconnection. 2.Learn how uncertainties associated with load, intermittent energy sources and forced and maintenance outages on generating units and transmission facilities have been taken into consideration. 3.How the ongoing integration of variable resources such as wind and solar might change the present methodologies and tools for computing the adequacy of the system?

2. Topics Covered 4 W ESTERN E LECTRICITY C OORDINATING C OUNCIL Generation Reliability Concepts - Milorad NERC GTRPM Methodology - Milorad Reliability Metrics LOLE, EUE, LOLH - Milorad Reliability Metrics Calculation – Simple Practical Examples - Milorad SCE’s System and Flexibility Analysis for the 2014 LTPP Phase 1A – Megan Mao NW Resource Adequacy - Robert Diffely BC Hydro’s Probabilistic Planning – Nan Dai A Direct High Speed Calculation Procedure For Determining LOLE, LOLH, and EUE For Fossil, Wind, and Solar Generation With A Suggested Procedure For Also Including Transmission Constraints - G. Preston IEEE Working Group Loss-Of-Load-Expectation Best Practices – Brandon Heath

3. Tools/ Methodologies Tools: WECC (PROMOD, Grid View) SCE (PLEXOS, REFLEX) North West (GENESYS) BC Hydro (LOLA, RISK, MECORE) ATC (P33) 5 W ESTERN E LECTRICITY C OORDINATING C OUNCIL

3. Tools used by WECC The PROMOD is a security-constrained economic dispatch (SCED) software package used widely in the power industry. Studies performed in PROMOD typically analyze an entire year, hour-by- hour, for the entire Western Interconnection. It enables modeling of energy-limited resources over the entire year. The model allows the assessment of performance of multiple scenarios because of the ease of data manipulation and changes in study assumptions. It has the capability to model uncertainties related to thermal generator outages, hydro, wind, and load using a Monte Carlo convolution approach. GridView is a software application developed by ABB, Inc., to simulate the economic dispatch of an electric power system while monitoring key transmission elements for each hour. 6 W ESTERN E LECTRICITY C OORDINATING C OUNCIL

3. Tools used by SCE 7 W ESTERN E LECTRICITY C OORDINATING C OUNCIL The PLEXOS model is an electricity market simulation model developed by Drayton Analytics. PLEXOS includes a comprehensive Monte Carlo model for modeling of both generators and transmission forced outages. The program’s solution simulation engine is based on proven mathematical programming techniques that ensure the simulation outcomes are robust and consistent across scenarios. Modeling is performed in PLEXOS; for each sample, considers unit commitment and dispatch over 24 hours. The Renewable Energy Flexibility (REFLEX) model can be characterized as a detailed Monte Carlo simulation of a system under a wide range of operating conditions. It performs stochastic production simulation through Monte Carlo draws of load, wind, and solar production. The tool has been used for the Californian system to examine the flexibility of the system under future high variable generation scenarios.

3. Tools used by NW and BC Hydro The GENESYS is a Monte Carlo-based model developed by the Northwest Power and Conservation Council (Council). The tool is used to develop a consensus-based resource adequacy framework and to perform annual resource adequacy assessments in the Northwestern region by taking into consideration many different uncertain future conditions. BC Hydro has a suite of probabilistic models to suit different needs in the areas of resource planning and operation. For long-term generation planning the loss of load analysis (LOLA), an in-house developed analytic program is used to assess the resource adequacy of BC Hydro’s generation system. In practice, analysis is done on a monthly basis to allow for the inclusion of generator maintenance schedules and fuel supply limitations. 8 W ESTERN E LECTRICITY C OORDINATING C OUNCIL

3. Tools used by BC Hydro For winter generation operations, the Excel-based RISK software was used. It includes uncertainties for both peak loads and unit forced outages. RISK uses Monte Carlo simulation to produce probability distributions for the projected system’s monthly peak- hour capacity net surplus/deficit. This allows the user to determine probabilistically if there is sufficient capacity to meet specified risk tolerances. If there is insufficient capacity, operational plans are employed to acquire additional capacity to meet the specified risk tolerance, which is currently set at 90th percentile. For composite system (generation + transmission) planning, the MECORE program is used. The program is Monte Carlo based and used to complement the deterministic N-1 analysis to maintain a reasonable system reliability level. 9 W ESTERN E LECTRICITY C OORDINATING C OUNCIL

3. Tool developed by TAC Transmission Adequacy Consulting (TAC) P33 Program is based on methodologies presented in the early 1970s by Booth and Baleriaux. These references present an exact calculation procedure for developing the cumulative probability generation outage distribution, which is now referred to as a recursive procedure. This greatly increases the speed and accuracy of calculating the reliability indices compared with the use of a binary tree (too large) or sampling (lacks accuracy and is slow to run). 10 W ESTERN E LECTRICITY C OORDINATING C OUNCIL

4. Summary of the results North West: In December 2011, the Council adopted the LOLP methodology and established a 5 percent LOLP standard. There have been two assessments (2017 and 2019) prepared by the Council under the adopted new LOLP methodology. In both of these assessments, the LOLP standard of 5 percent was not met. In 2017, the LOLP was 7 percent, and in 2019 it was 6 percent. BC Hydro: Evaluated the LOLP of the system that leads to the 14% capacity margin requirement Calculated the effective load carrying capability (ELCC) of the intermittent resources that leads to the 26% wind ELCC 11 W ESTERN E LECTRICITY C OORDINATING C OUNCIL

4. Summary of the results (cont..) SCE: For the High Load Scenario, SCE finds 6250 MW of net shortfall. “90% confident that the correct estimate of stage 3 emergencies is between 34 and 37” With no additional authorizations, SCE’s analysis predicts 35 shortfall events in 10 years Approximately 6250 MW of resources are needed to achieve a one event in 10 year reliability standard 12 W ESTERN E LECTRICITY C OORDINATING C OUNCIL

4. Summary of the results (cont..) WECC: Overall results, the 2016 EUE is expected from roughly nil in the SWSG subregion to roughly 96 MWh for the entire year in the NWPP subregion. The 2018 EUE is expected from roughly one MWh in the SWSG subregion to roughly 548 MWh for the entire year in the RMRG subregion. In both assessments, none of the regions LOLH exceeds the rough industry guideline of no more than 1 day in 10 years cumulative or 0.1 day per year. 13 W ESTERN E LECTRICITY C OORDINATING C OUNCIL

5. Next Steps Continue share study results performed by WECC entities with RAWG Address Planning for Adequate Reliability under High Penetration of Renewable Calculating reliability indices (used by Reliability Tools as an input) from outage data collected in TADS and GADS 14 W ESTERN E LECTRICITY C OORDINATING C OUNCIL

Questions? Milorad Papic Chair, Reliability Assessment Work Group 15 W ESTERN E LECTRICITY C OORDINATING C OUNCIL